MTEL Retail Placarding - PowerPoint PPT Presentation

About This Presentation
Title:

MTEL Retail Placarding

Description:

MTEL Retail Placarding Overview Agenda Retail Distribution Codes Postage Labels MTEL Placards Retail Site Standardization Key Implementation Activities At Retail ... – PowerPoint PPT presentation

Number of Views:122
Avg rating:3.0/5.0
Slides: 22
Provided by: Jame3187
Category:

less

Transcript and Presenter's Notes

Title: MTEL Retail Placarding


1
  • MTEL Retail Placarding
  • Overview

2
Agenda
  • Retail Distribution Codes
  • Postage Labels
  • MTEL Placards
  • Retail Site
  • Standardization
  • Key Implementation Activities

3
At Retail Units
  • Retail Distribution Codes (RDCs)
  • Identifier for window /distribution clerks
  • Used to separate classes of mail into larger
    containers for dispatch to PDCs and NDCs
  • Facilitate more efficient and service responsive
    network movement to downstream processing
    facilities
  • Retail sort will be based on
  • Product Type
  • Originating ZIP Code
  • Destination ZIP Code

4
At Retail Units (contd)
  • RDCs
  • No Code (00) FCM Letters, Flats, and SPRs
    (Maintain current process for mail separation)
  • 01 Local NDC Pkgs (Tier 1 NDC Parcel Post)
  • 02 Network NDC Pkgs (Tier 2 NDC Parcel Post)
  • 03 Network NDC Pkgs (used for directional
    dispatch)
  • 04 Priority Parcel Network
  • 05 Overnight Parcels SPRS
  • 06 Priority Flats
  • 07 Express
  • Note local codes are available similar to
    labeling list change request process

Goes to NDC
5
At Retail Units Postage Labels
  • RDCs on postage labels

PVI label Leading digit of 1 indicates from POS
machine
APC small label
6
At Retail Unit Postage Labels (contd)
  • RDCs on postage labels

Click N Ship label
From Contract Postal Unit
7
Retail Units
  • Level 18 and above must make container
    separations
  • Level 15s and below separations made at PDC
  • NMOs withheld from machinables in 99 Mixed
    container
  • Non-RDU Parcel Return Service w/ RDC01

8
Retail Readiness Assessment
  • Each retail unit must complete readiness
    assessment checklist
  • At least one week prior to activation or as
    specified by District Manager

9
MTEL Placard Report Extract
Retail splits for sites feeding Morgan Station NY
PDC-100
10
Retail Placard Selection Screen
11
MTEL Retail Unit Placard
  • Retail Distribution Code 01
  • From Retail Unit to Plant
  • Barcode will be available 9/09

11
12
Retail Unit to Plant to NDC Site
Lehigh Valley PDC
Platform Bullpen Operations
13
MTEL Network Placard
  • Retail Distribution Code 01
  • From origin plant to Tier 1 NDC site

13
14
MTEL Network Placard
  • Cross-Docked
  • Retail Distribution Code 02
  • From origin plant to Tier 1 to Tier 2 NDC site

14
15
Standardized Placarding to NDC Sites
16
MTEL Placard Samples
Standard Letters
Periodicals Flats
Parcel Post
16
17
Network Placard
  • RDC trigger word does not point to NDLL
  • Use only for network placards destinating to NDC
    sites
  • Must be entered in Placard Prep in the
    following manner in order to display above text
    Zip ranges

Note comma space must be between the trigger
word and text or Zip ranges
18
MTEL Retail Unit Placard
  • For mail originating at retail units only
  • MTEL will automatically produce distribution
    splits based on Retail Distribution Code (RDC)
    data
  • DN TANs Mgrs. must ensure transportation is in
    place to generate retail placards

18
19
Network Routings
  • Area DN Networks will create update dispatch
    records in Natl Air Surface System (NASS)
  • Align routing with operating plan parameters
  • Scheme will drive MTEL placard generation
  • Establish routings from origin to the final
    destination
  • Consistent with National Distribution Label List
    (NDLL)
  • - Destination AADC, ADC, NDC
  • - Mail Classes Standard, Periodicals, and Parcel
    Post

19
20
Placarding
  • Origins must ensure placards are placed on MTE
    before dispatch
  • MTEL is an on-demand system
  • Print only what you need for each day
  • Print entire set weekly ONLY as contingency
  • Do not use recycled placards
  • Use correct mail class and shape
  • HAZMAT placard option
  • Ensure placard barcode area is clear to enable
    Surface Visibility (SV) scanning

20
21
Key Implementation Activities Transportation
  • Review MTEL Operational Areas
  • Remove unused placards
  • Assign new NDC placards
  • Suggest dedicated Operational Area for NDC
    placards
  • Use logical naming conventions
  • Use Check Operational Area to identify pending
    drops
  • Comply with SV scanning
  • Ongoing Training
  • Account for all scanners
  • Establish and maintain SOPs
Write a Comment
User Comments (0)
About PowerShow.com