Title: The 7-Step DQO Process


1
DQO Training Course Day 3Module 18
The EPA 7-Step DQO Process
Step 1 Problem StatementDQO Case Study
Presenter Sebastian Tindall
45 minutes
2
DQO Case Study
Heli-101 Flight Pad
3
Step 1a - State the Problem
Information IN Actions
Information OUT From Previous Step
To Next Step
Identify the DQO Team and define each members
roles and responsibilities
Identify available resources and relevant
deadlines
Planning Meeting
Continue activities
Identify the decision makers and define each
members roles and responsibilities
Identify the Stakeholders and determine who will
represent their interests
4
Step 1b - State the Problem
Information IN Actions
Information OUT From Previous Step
To Next Step
  • Scoping Process Results
  • Collect site history, process knowledge,
  • Summarize existing analytical data
  • Specify areas to be investigated
  • Summarize all recorded spills and releases
  • Document applicable regulations
  • Current housekeeping practices
  • Current local environmental conditions

Administrative and logistical elements
Continue activities
5
Step 1c - State the Problem
Information IN Actions
Information OUT From Previous Step
To Next Step
  • Conduct interviews with decision makers and
    Stakeholders to determine their
  • Objectives
  • Requirements (applies to decision makers only)
  • Concerns

Scoping Process Results Scoping Process Issues
Specify interview issues
Scoping Process Results Scoping Process Issues
Hold Global Issues Meeting to resolve scoping and
interview issues
6
Step 1d - State the Problem
Information IN Actions
Information OUT From Previous Step
To Next Step
Identify COPCs
Provide rationale for COPC exclusions
Create final list of COPCs with rationale for
inclusions
Scoping Process Results Scoping Process
Issues Global Issues Resolutions
Specify release mechanisms
Conceptual Site Model
Identify fate and transport mechanisms
List potential receptors
Problem Statement
Estimate COPC distributions
Discuss decision drivers
Write CSM Summary Narrative
7
2 Approaches
  • Approach 1 Traditional lab methods
  • Approach 2 Field analytical methods with final
    confirmation via lab methods
  • Select onsite methods that focuses on driver
    COPCs (e.g., risk drivers, transport drivers,
    etc.)

8
2 Approaches
  • Approach 1
  • Use predominantly fixed traditional laboratory
    analyses and specify the method specific details
    at the beginning of the DQO Process and do not
    change measurement objectives as more information
    is obtained
  • This approach will contain serious flaws.

Note Students are expected to point out these
flaws as the class progresses.
9
2 - Approaches (cont.)
  • Approach 2
  • Allow more field decisions to meet the
    measurement objectives and allow the objectives
    to be refined in the field using dynamic work
    plans (Managing Uncertainty approach)
  • This approach will attempt to overcome the
    serious flaws shown in Approach 1.

10
2 - Approaches (cont.)
  • Approach 2 - Dynamic Work Plans
  • Real-time, decision making in the field allows
    for a seamless flow of site activities resulting
    in fewer mobilizations
  • Requires more flexible contracting approach
  • Requires experienced, well-trained field team
    (e.g., geologists, chemists and statisticians)
    either in the field or able to receive and
    process electronic data in real-time

11
2 - Approaches (cont.)
  • Approach 2
  • Allows collection of more data in real-time
  • Allows real-time decisions to be made
  • Must have flexible but established decision trees
    approved by decision makers ahead of time
  • Need general statements of measurement quality
    that will be interpreted by field team
  • May be more costly due to higher level of
    expertise required butmore defensible
  • Overcomes the Classical Statistical Burdens

12
Objective
  • Based on comprehensive Scoping, to be able to
    develop, for a specific project
  • 1. a list of Contaminants of Potential Concern,
  • 2. a conceptual site model (CSM),
  • 3. a problem statement(s)

13
DQO Team Members
14
Available Resources and Deadlines
15
Decision Makers
16
Stakeholders
17
Remedial Action Soil Process Knowledge
  • Heli-101 flight pad used 1970-1995
  • Used to load, unload and maintain aircraft
  • Wash down and maintain vehicles
  • Used oils and fuels spilled and washed off pad,
    draining to the surrounding soil
  • 1980 used as staging area for transformer and
    motor oils

18
Remedial Action Soil Process Knowledge (cont.)
  • 1990s used as area to decon equipment from the
    Gulf War
  • Collection sump used to capture pad rinsate from
    Gulf War
  • Equipment was washed to remove depleted uranium
  • 1995 trace uranium found on pad

19
Summary of Existing Data
  • ALL data collected from surface soil (0-6)
  • Summary of existing total petroleum hydrocarbon
    (TPH) data
  • See next table
  • All TPHs were below regulatory limit of 100 mg/kg
  • PCBs detected in 2 of 5 samples and were above
    state limit of 1 mg/kg
  • No other volatiles, semivolatiles, or metals
    (excluding Pb, U) were detected above background
  • The Base ground and surface water have not
    detected contamination

20
RI/FS Data Inorganics and TPH(surface soil
samples)
21
RI/FS Data PCBs (surface soil samples)
22
Areas to be Investigated
Plan View
Former Pad Location
Buffer Zone
Runoff Zone
23
Summary of Spills and Releases
  • Pad is 75 in diameter
  • Add 50 to include the Run-off zone (d125)
  • Buffer zone is 265 in diameter, with Pad
    centered within
  • Area of Pad is 4,418 ft2
  • Area of Pad Run-off zone 12,272 ft2
  • Area of Buffer zone is 42,884 ft2 (excluding Pad
    and Run-off zone)

Does not include layback area
24
Summary of Spills andReleases (cont.)
  • Volume of Pad Run-off zone, 0-6, is 227 yd3
  • Volume of Buffer zone, 0-6, is 794 yd3
    (excluding Pad and Run-off zone)
  • Volume of Pad Run-off zone, 6-10, is 4,318
    yd3
  • Volume of Buffer zone, 6-10, is 15,089 yd3
    (excluding Pad and Run-off zone)

Does not include layback area
25
Summary of Spills andReleases (cont.)
  • No releases recorded before 1977 (e.g., before
    adopting RCRA)
  • Drum inventories from 1980s were imprecise
  • Reports from 1990s were sparse and not
    declassified. One report did include uranium
    data from the sump at 450 mg/L.
  • Interviews indicate that predominant metals were
    Pb and U. U was depleted.

Does not include layback area
26
Current Conditions
  • Housekeeping practices
  • physically barricaded to prevent use
  • Site conditions and local environment
  • Pad is removed, land is barren without vegetation
  • Avg. rainfall 20 in./yr
  • Groundwater at 50 ft below grade
  • Temperatures range 12 to 98F
  • No endangered species
  • No cover or water collection system

27
Current Conditions (cont.)
  • Areas to be investigated
  • exclude surface or groundwater
  • exclude biota (covered by overall base program)
  • include soil via direct exposure
  • include soil area/volume

28
Scoping Issues
  • The degree and extent of soil contamination
    reported from the RI/FS is questionable
  • There are different opinions as to whether
    multiple constituents of interest exist and
    whether the constituents are present above
    regulated levels at the site

29
Interview Issues
  • Shipment of wastes from the base could impact the
    local community Local authorities expressed a
    concern over the transport of hazardous materials
    from the Base. Of particular concern was the
    impact to community traffic flow and the
    potential for an accidental release.

30
Interview Issues (cont.)
  • Suitability/protectiveness of cleanup standards
    Current State regulations regarding cleanup
    levels have been questioned by local stakeholders
    (special interest groups) as to their degree of
    protectiveness. Current special interest groups
    have argued that contamination, at any level,
    poses an unnecessary and unacceptable threat to
    human health and the environment. These special
    interest groups have asserted that the Base has a
    moral obligation to remove all detectable
    contamination in order to ensure that the
    surrounding community and wildlife is protected.

31
Interview Issues (cont.)
  • Schedule delays, cost overruns, lack of
    sufficient sample data The Base has expressed
    concerns over the involvement of special
    interests, particularly, those who would require
    that the Base perform potentially unneeded
    cleanup operations that are well beyond the scope
    and intent of the law. The Base has also
    expressed a concern that the operation be managed
    within the schedule and costs for which the
    project has been assigned. There is also a need
    to collect data that will be sufficient for its
    intended purpose site closure/risk assessment
    input, or, designation of the waste for cleanup
    and disposal.

32
Interview Issues (cont.)
  • Land Use
  • Base commander believes land use is industrial
  • EPA believes land use should be residential

33
(No Transcript)
34
Global Issues Meeting
  • Scoping Issue
  • The degree and extent of soil contamination
    reported from the RI/FS is questionable
  • Resolution
  • Currently available historical information
    (existing data) was collected with the intent to
    characterize the site for disposal according to
    RI/FS considerations. However, such
    characterization data are not sufficient to
    support a decision for site closure or a decision
    to conduct additional remedial action if deemed
    necessary.

35
Global Issues Meeting (cont.)
  • Interview Issue
  • Shipment of wastes from the Base could impact the
    local community Local authorities expressed a
    concern over the transport of hazardous materials
    from the Base. Of particular concern was the
    impact to community traffic flow and the
    potential for an accidental release.

36
Global Issues Meeting (cont.)
  • Resolution
  • The only quantities planned for off-site shipment
    are small quantities of slightly contaminated
    soil and/or water that would be sent to an
    independent analytical laboratory. Large
    shipments of hazardous substances are not
    planned. All Department of Transportation
    regulations will be followed as applicable.
    Shipments will be timed for off-peak traffic
    hours. If a large-scale soil remediation project
    is spawned as a result of the sampling effort,
    waste shipments will be planned at that time, and
    in such a way as to minimize the impact to the
    community.

37
Global Issues Meeting (cont.)
  • Interview Issue
  • Suitability/protectiveness of cleanup standards
    Current State cleanup standards are questioned by
    the interest groups. The concern is that the
    standards are not protective of the wild life and
    community.
  • Resolution
  • The State and Federal agencies have explained the
    risk assessment process to the interest groups.
    Compliance with these risk levels will be
    protective. The State has encouraged the special
    interest groups to take their concerns to the
    legislature. Based on more information related
    to the risk assessment process, the interest
    groups indicated that the approach was logical.

38
Global Issues Meeting (cont.)
  • Interview Issue
  • Schedule delays, cost overruns, lack of
    sufficient sample data The Base has expressed
    concerns over the involvement of special
    interests, particularly, those who would require
    that the Base perform potentially unneeded
    cleanup operations that are well beyond the scope
    and intent of the law. The Base has also
    expressed a concern that the operation be managed
    within the schedule and costs (presented later in
    this example) for which the project has been
    assigned. There is also a need to collect data
    that will be sufficient for its intended purpose
    site closure/risk assessment input, or,
    designation of the waste for cleanup and disposal.

39
Global Issues Meeting (cont.)
  • Resolution
  • The Base is relying on the DQO Process to
    determine the most cost-effective and technically
    defensible means for collection of samples. The
    DQO Process will specify the decision makers
    tolerable limits on decision errors, which are
    used for limiting uncertainty in the data and
    therefore reduce the chance of unnecessary
    cleanup. Furthermore, the Base will be using the
    DQO Process to document agreement of the sampling
    strategy with the regulators and local community
    as a means of reducing base liability. The SAP
    generated from the DQO effort will result in data
    collection sufficient for its intended purpose.

40
Global Issues Meeting (cont.)
  • Interview Issue
  • Data will not be of sufficient quality for risk
    assessment Regulators are concerned that
    previous data are not of the quality to support
    risk assessment.
  • Resolution
  • Regulators will be participants in the DQO
    Process which defines the data and quality
    requirements. In addition, they may take split
    samples at the same time sampling is performed.

41
Global Issues Meeting (cont.)
  • Interview Issue
  • Conflicting land uses (industrial vs.
    residential) Regulators believe the land use is
    residential which decreases the allowable risk
    (10-6 as opposed to 10-5) and may result in
    allowing higher concentrations to remain in the
    soil. Base command believes the land use is
    industrial.

42
Global Issues Meeting (cont.)
  • Resolution
  • For all government facilities a federal facility
    agreement (FFA) is signed between the EPA/State
    and the federal agency that owns the site (e.g.,
    DOE or military). By law, this agreement
    indicates that the federal agency owning the site
    can designate the land use or agree to negotiate
    the land use. The FFA indicated that the
    military would designate the land use, thus, it
    will be industrial.

43
(No Transcript)
44
COPC Exclusions part 2
45
Final List of COPCs
46
Release Mechanisms
  • How the COPCs arrived at the site
  • Motor pool type supplies and products were
    transported to the site to aid in maintenance
    operations. Transformers containing PCBs were
    stored at the site. COPCs were typically washed
    from spills on the helicopter pad and into the
    surrounding soil.

47
Fate and Transport
  • How has fate and transport mechanisms affected
    the COPCs
  • The soil is suspected of being contaminated by
    spilled material that leaked or was washed from
    the pad at various times during the pads
    history. The physical components of the site
    include surface and subsurface soils and gravel
    within the known boundaries of the spill.
    Unimpeded access is assumed for all sampling
    media. Because the site has been exposed to
    weather (precipitation) since the spill
    occurrences, some transport into the subsurface
    is likely to have occurred therefore, to support
    clean site confirmation, the underlying soil is
    included within the boundaries of the site.

48
Receptors
  • Future land use
  • It is anticipated that the land must be released
    for industrial use at some future time.
    Therefore, potential receptors include human
    workers as well as the surrounding biota (e.g.,
    shrubbery).

49
Potential Receptors
  • Data for groundwater wells on the military base
    have not indicated contamination attributable to
    this site
  • This leads one to believe that there is no
    groundwater contamination, thus the groundwater
    ingestion pathway is not complete and does not
    require added investigation. Industrial workers
    will use sanitary water from the city.

50
Potential Receptors (cont.)
51
Spatial Surface Soil Sample Results
A (18, 102, 4, 0.03)
B (27, 96, 3, 1.5)
Plan View
Former Pad Location
Buffer Zone
C (15, 78, 2.5, 0.03)
D (10, 86, 1, 2.0)
Runoff Zone
Letter sample point Concentrations (Pb, U, TPH,
Aroclor 1260)
E1 (12, 112, 0.03, 0.75)
E2 (15, 92, 0.03, 11)
52
Distributions
  • Presumed Spatial Distributions of the COPCs
  • The pad was washed, and therefore the area where
    the edge of the pad once existed is likely to
    have higher concentrations than the area further
    away from the previous edge of the pad. It cannot
    be assumed that contamination decreases with
    depth from the surface. However, contamination
    is expected to decrease with depth therefore,
    deeper soils are assigned a lower probability of
    being contaminated.
  • The probability of contamination will be scaled
    within a range bounded by the arbitrary lateral
    and vertical boundary to be determined during
    sample optimization (Step 7). This is because
    the amount of data collected from the RI/FS is
    not sufficient to define the physical boundaries
    of the expected residual contamination. The
    previous RI/FS did not use the DQO Process.

53
Frequency Distribution
54
Histogram
55
Histogram (cont.)
56
Histogram (cont.)
57
Histogram (cont.)
58
Decision Drivers
  • Future land use
  • Effect of residual contamination on the ecosystem
    was not previously considered
  • Direct long-term industrial land use was not
    considered in the past risk models
  • All parties agreed to use industrial land use as
    the scenario
  • If concentrations are below the levels based on
    industrial use, the remediation will be complete,
    otherwise added remediation will be needed

59
CSM Narrative
  • The Heli-101 Pad and the surrounding soil
    (surface and underlying) extending laterally up
    to ? 95 ft in any direction from the perimeter of
    the pad and up to a depth of 10 ft constitutes
    the conceptual model for the contaminated site.
    It is graphically depicted in the plan view and
    section view in the following section. Surface
    soil is defined as soil up to a depth of 6 in.
    and underlying (subsurface) soil is defined as
    soil up to a further depth of 10 ft.
  • (Etc...)

60
CSM Spatial Graphical
Plan View
Former Pad Location
Buffer Zone
Runoff Zone
Section View
Former Pad Location
Buffer Zone
Grade Level
Runoff Zone
60 of 101
61
Overview of the Receptor Pathway(CSM) Tabular
62
Problem Statement
  • In order to determine whether the residual soils
    at the site are contaminated, data regarding
    potential contaminants in the surface and
    underlying soils are needed.

63
End of Module 18