LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template LAT-PS-03929-03 Test Suite: CE102 Conducted Emissions, Power Leads, 10 ... – PowerPoint PPT presentation

Number of Views:172
Avg rating:3.0/5.0
Slides: 31
Provided by: Michae1609
Category:
Tags: emi | lat | anechoic | chamber | test

less

Transcript and Presenter's Notes

Title: LAT EMI Test


1
LAT EMI Test
  • LAT test levels derived from LAT-SS-0778
  • Use CAL EMI test procedure as template
  • LAT-PS-03929-03
  • Test Suite
  • CE102 Conducted Emissions, Power Leads, 10 kHz to
    10 MHz, MIL-STD-462, CE03
  • CECM Conducted Emissions, Time Domain, 150 MHz
    Bandwidth
  • CS102 Conducted Susceptibility, Power Leads, 10
    kHz to 10 MHz, MIL-STD-462, CS02
  • CSCM Conducted Susceptibility, Common Mode, 30 Hz
    to 150 MHz, MIL-STD-462, CS02
  • CS06 Conducted Susceptibility, Spike, Power
    Leads, MIL-STD-462
  • RE101 Radiated Emissions, Magnetic Field, 20 Hz
    to 50 kHz
  • RE102 Radiated Emissions, Electric Field, 10 kHz
    to 18 GHz, MIL-STD-461E
  • RS101 Radiated Susceptibility, Magnetic Field, 20
    Hz to 50 kHz
  • RS103 Radiated Susceptibility, Electric Field, 30
    MHz to 18 GHz

2
LAT Power Interfaces
  • SC-LAT Power Interfaces
  • SC PRU (P) - LAT PDU
  • SC PRU (R) - LAT PDU
  • SC PRU (P) - LAT SIU (P)
  • SC PRU (R) - LAT SIU (R)
  • SC PRU (P) - LAT VCHP Y
  • SC PRU (P) - LAT VCHP -Y
  • SC PRU (R) - LAT VCHP Y
  • SC PRU (R) - LAT VCHP -Y
  • SC PDU (P) - LAT MAKEUP
  • SC PDU (R) - LAT MAKEUP

3
Test Limitations
  • RS103 upper limit of 18GHz (40GHz)
  • Limited area of RS101 test
  • Requires scanning each 10cm x 10cm area,
    16min/scan
  • 1450 scans for the LAT, another 1200 for the
    radiators (29 days)
  • Scan selected locations around connectors, PMTs,
    BEA
  • Limited B side conducted testing
  • Emissions tests and susceptibility only where
    noted on A side
  • Limited VCHP htr testing
  • Emissions only

4
EMI Test Configurations
  • Split EMI test
  • Conducted tests performed in the high bay
    integration area
  • Radiated testing performed in anechoic chamber
  • Conducted emissions and susceptibility tests with
    SIU and PDU do not require radiators, but do
    require good access to connectors
  • LAT z axis vertical to provide access to LAT
    connectors with 2m cable lengths

5
Radiated Test Configuration
6
Radiated Test Configuration
7
LAT Cable Feedthrough
8
Conducted Test Considerations
  • Fully test
  • SC PRU (P) - LAT PDU
  • SC PRU (P) - LAT SIU (P)
  • Limited test
  • SC PRU (R) - LAT PDU
  • SC PRU (R) - LAT SIU (R)
  • Need to resolve operating constraints on VCHP
    htrs
  • Can they be run for extended periods of time at
    ambient temp?
  • Thermostatic overtemp protection
  • Limited power, 4W/circuit
  • No plan to test PDU - LAT Makeup
  • Thermostatic control, open circuit at ambient
    temp
  • Conducted susceptibility tests may require
    disabling bus protection unit

9
Conducted Test Harness
  • Require access to power harness 2m from LAT I/F
  • CE102, CS102 (10kHz - 150kHz), CSCM (30Hz -
    150kHz), CECM
  • All conductors of power circuit must be connected
    to a single 1/4 lug on line conditioner
  • All conductors must be gathered into a bundle so
    that a current probe may be connected around them
  • Require access to power harness 5cm for LAT I/F
  • CS102 (150kHz - 150MHz), CS06, CSCM (150kHz -
    150MHz)
  • Small bare section of a single conductor to
    attach clip lead for hf injection
  • EMI shielding not required on harnesses

10
Radiated Test Harness
  • No access to conductors required
  • Harness must be fully shielded
  • Includes all connector savers
  • Any test ports must be closed out or have
    shielded harnesses
  • back door
  • Test harnesses must be shielded
  • Accelerometers
  • TCs thermistors
  • Harness supports not directly connected to the
    LAT should be nonconducting material, wood or PVC

11
Test Software
  • Emissions Testing
  • Utilize the FSW Charge Injection Calibration
    function to inject charge into a large number of
    detectors. The number of channels into which
    charge can be injected will be limited by a) FSW
    design (which is not yet complete) and b) The
    number of channels which can physically be
    injected with charge in any given one second
    cycle. The one second cycle is required to
    provide repeatability during the Emissions
    frequency sweeps.
  • Susceptibility Testing
  • A variation of the test described in the
    End-to-End (ETE) Test Plan, LAT-MD-03489,
    paragraph 2.2.1, item 4, "Nominal Rate Cosmic Ray
    Test" will be used. This test is run at ambient
    temperature and at nominal voltage, timing,
    threshold, and trigger configurations. Both
    Cosmics and the external trigger function are
    used to create on-orbit trigger rates. The
    external trigger rate will be set so that the
    total trigger rate will be at or near the nominal
    expected on-orbit values.
  • The externally triggered events should have very
    low occupancy, monitor to see if occupancy goes
    up
  • The cosmic ray events should remain constant,
    monitor to see if rate goes up.

12
Test EGSE Software Tools
  • Displays of natural trigger rates and occupancy
    of externally triggered events should be strip
    chart type
  • Other error status, checksum, etc. should latch

13
RE102 - Integrated LAT
14
RE101 All LAT Equipment
15
CE102 Spacecraft PRU LAT DAQ
16
CE102 Spacecraft PRU LAT SIU (IL), VCHP Heaters
17
CE102 Spacecraft PDU LAT Anti-freeze and
Make-up Heaters
18
Conducted Emissions Common Mode All LAT
Equipment
19
RS103 Perform BEA and Tracker Tower
20
RS101 Perform BEA and Tracker Tower
21
CS102 Spacecraft PRU LAT DAQ
22
CS102 Spacecraft PRU LAT SIU (IL), VCHP Heaters
23
CS102 Spacecraft PDU LAT Anti-freeze and
Make-up Heaters
24
Conducted Susceptibility Common Mode All LAT
Equipment
25
CS06 Operate All LAT Equipment
26
CS06 Perform All LAT Equipment
27
(No Transcript)
28
Back-up Slides
29
CE 102 LAT PDU TPS (TEM, CAL, TRKR), EPU
(IL),GASU (ACD BEA, IL), PDU (IL)
30
CS102 LAT PDU TPS (TEM, CAL, TRKR), EPU
(IL),GASU (ACD BEA, IL), PDU (IL)