Title: Institut IGH d.d.
1Institut IGH d.d.
5. Construction
2Institut IGH d.d.
5. Construction
3Institut IGH d.d.
6. Structures
Bridges More than 800 different structures
4Institut IGH d.d.
6. Structures
5Institut IGH d.d.
6. Structures
6Institut IGH d.d.
Tunnels Total length of tunnels 85 km The
longest tunnel 5,79 km
7Institut IGH d.d.
7. Financing
fuel tax EUR 0,082/lit toll collection
charges for the use of roadside land loan
proceeds
Total cost of motorway system 2001 2008
EUR 9 billion loans EUR 5.3 billion average
price per km 8 million Average Anual Daily
Traffic 2010 12.404vehicles
8Institut IGH d.d.
7. Financing
Total toll collection revenue in 2010 267
Mil
Toll collection I CAT 0,053 EUR/km II
CAT 0,080 III CAT 0,120 IV CAT 0,170
9Institut IGH d.d.
8. Impacts (sustainability) Economy transit,
tourism, new jobs Social impact integration
10Institut IGH d.d.
8. Impacts (sustainability) Roads open but also
create new vistas
Each generation of builders has the
responsibility to leave the works worthy to be
shown in postcard pictures.
11Institut IGH d.d.
9. FuturePelješac Bridge
12Institut IGH d.d.
9. FutureRailways ports Connections to
towns New concessions?
13Institut IGH d.d.
Thank you for your attention
The Developement of Motorway network in Croatia