Title: PRESENTATION OUTLINE
1(No Transcript)
2PRESENTATION OUTLINE
- Introduction
- Important Preliminaries
- Envisaged Design structures
- Terms of Reference for Design Teams
- Estimated Design Cost and Time table
-
- The initiating launch at a Press conference
- Current State of Affairs in Suriname
3INTRODUCTION
- After being preached to since October 2001 by
several colleagues, most notably our colleagues
from Jamaica and Bermuda and after a retreat in
2004, during which several executing agencies,
involved with the IADB met, we were more or less
convinced that Strategic Planning could be a
useful tool to a statistical office. The November
2004 SCCS in Bermuda, provided the turning point.
4INTRODUCTION (continued)
- In December 2004 we conducted our very first
Customer Satisfaction Survey. Even after an
extension of the deadline for responding to
February 2005, the results (in terms of response
rate) were so abysmal that they put off the WOP
division completely. The Customer Satisfaction
survey prepared for the last Quarter of 2006 was
never conducted. (We were supposed to have them
every two years). - As of July 2005, the Director, the Deputy
Directors and most Managers of the GBS took part
in several Management training courses (e.g.
Seven Habits of highly effective people the
Eight Habit Dealing with Conflicts within an
organization, etc.).
5INTRODUCTION (concluded)
- In April 2007 the first SWOT was produced for the
GBS. Further lessons learned from our colleagues
made it clear to us that the first approach (only
involving Senior Management and Management
staff), however useful was insufficient. The
exercise was repeated with all of the GBS staff
in January 2009 during a one-day workshop Team
building and Forward Looking for the GBS
6IMPORTANT PRELIMINARIES-1
- -The previous (July 2000- August 2005) and
present (September 2005- to date) Minister of
Planning and Development Cooperation (with
Statistics in his portfolio) have always been
very supportive to the GBS and pushed for
capacity building and improved status. Under the
previous minister the GBS became semi-autonomous
and under the present minister it was decided
that the Director of Statistics cannot have a
status less than a Permanent Secretary. (Please
note, that not everything is portable as Guyana
had its worst time under Planning and Suriname
prospered most under Planning) - -Since July 2006 the proposed RSWP is integrated
into the Annual work plans (effectively
overlapping 18 months plans) of the GBS and it
helped tremendously to focus on critical
statistical issues and also served as a stepping
stone towards long-term statistical planning.
7IMPORTANT PRELIMINARIES-2
- -While the previous Minister rightfully
concentrated on the GBS (after all, it makes
sense that one needs to strengthen the
Coordinator of the System first), since 2007 the
present Minister made it clear that indeed the
Coordinator may deserve most of the attention,
but more attention should be devoted to other
parts of the System. - -In July 2008 the GBS submitted a long-term plan
of activities 2010-2021 to the Commission for
Statistics, which was approved with minor
amendments.
8IMPORTANT PRELIMINARIES-3
- -In the first Quarter of 2009, we had several
NSDS discussions with the Minister of PLOS and
after we returned from participating in the 40th
session of the UN Statistical Commission, the
Minister of PLOS requested a proposal towards
achieving an NSDS in the last Quarter of 2009
(preferably by Mid October, but no later than Mid
November 2009) - -On 4th of May the Minister repeated his request
and on 22 May we submitted a first draft, which
was extensively discussed on 28th May and a
revised proposal was submitted on 18 June 2009.
9ENVISAGED DESIGN STRUCTURES critical issues
influencing our proposal
- High level political support
- Broad based support
- Representation from the main producers and users
- Contribution towards the MDG
10ENVISAGED DESIGN STRUCTURESNSDS core Design Team
and Alternates/assistants.-1
- The Core Design Team comprises
- The Minister of PLOS (Chair)
- The Director of the GBS (Deputy Chair)
- Director Monetary and Economic Affairs of Central
Bank (Secretary) - Permanent Secretary (PS) of the Ministry of
Internal Affairs (MOIA) - PS of the Ministry of Health (MOH)
- PS of the Ministry of Labour (MOL)
- PS of the Ministry of Education (MOE)
- PS of the Ministry of Transportation,
Communication and Tourism (MOTCT) - PS of the Ministry of Finance (MOF)
- PS of the Ministry of Social Affairs and Housing
(SOZAVO)
11ENVISAGED DESIGN STRUCTURESNSDS core Design Team
and Alternates/assistants.-2
- The Alternate (or Assistant) team comprises
- The GBS Deputy Director for Statistics (Co-Chair)
- Head of the Research Department of Central Bank
(Co-Chair) - Director Bureau for Public Health
- Coordinator National Health Information System
- Head of the Department of Research and Planning,
MOE - Head of the Department of Labour Statistics, MOL
- Head of the Department of Research and Planning
SOZAVO - Head Agricultural Statistics
- Head Traffic Instruction, Education and
Statistics of the Police Force
12Monitoring of activities
- The activities of both teams during the design
phase will be monitored by the Commission for
Statistics, the governing board for the NSS in
general and the GBS in particular. The Commission
for Statistics will also be responsible for
monitoring the actual implementation of NSDS
2010-2014.
13TERMS OF REFERENCE FOR DESIGN TEAMSCORE TEAM
TOR-1
- Assess and if necessary adapt the proposed time
table , to ensure that all proposed activities
are included and can be achieved, reckoning with
a Presentation date somewhere between 16 and 27
November 2009 - Submit a plan with indispensable elements of a
Media Campaign to guide both the Design and the
Execution Phase of the NSDS - Design the instruments to be used for the
diagnosis and assessment of Surinames National
Statistical System (SSS)
14TERMS OF REFERENCE FOR DESIGN TEAMSCORE TEAM
TOR-2
- Make an inventory and assess all legal
instruments of relevance to the SSS - Design the questionnaire(s) for the Customer
Satisfaction Survey(s) - Design the NSDS Road map 2010-2014, reckoning
with The Existing National Multi-Annual
Development Plan, Capacity building for all
parts of the SSS, proper balance between demand
for and supply of Statistics, Optimum Mix
between Administrative data, Surveys and
Censuses, Respondent and Interviewer burden,
Optimum Coordination of the SSS
15TERMS OF REFERENCE FOR DESIGN TEAMSCORE TEAM
TOR-3
- Based on the Road Map, Cost the NSDS 2010-2014
- Conduct all activities following naturally from
the above-mentioned, which are in line with Core
team membership.
16TERMS OF REFERENCE FOR DESIGN TEAMSAlternates/Ass
istants TOR-1
- Collecting, processing and organizing data and
documentation for the benefit of the NSDS Core
Design Team, as well as archiving data and
documentation - Conduct visits and all other activities in
connection with the diagnosis and assessment of
the SSS - Conduct the Customer Satisfaction Survey(s)
17TERMS OF REFERENCE FOR DESIGN TEAMSAlternates/Ass
istants TOR-2
- Assist with budgeting the NSDS 2010-2014
- Stand in for a relevant Core Design Team member
when absent - Conduct all activities following naturally from
the above-mentioned, which are in line with
Alternate/Assistant team membership
18Estimated Design Cost(To be paid by Ministry of
Planning)
- In the estimated design cost we reckoned mainly
with - Office materials and accessories, cost of
advertisements, cost of Customer Satisfaction
surveys (pick-up / drop-off), assessment work
visits, a small compensation for the design teams
and a Presentation Workshop, all amounting to
circa - 52,000 USD.
19Estimated Design CostImportant note
- It was made clear to everybody that this is a
minimum budget, applying only to the design phase
as participating institutions will certainly have
to bear some of the actual design cost. It was
also emphasized that the actual NSDS cost will be
a multitude of the Design Cost, as for instance
for the GBS only we would have to reckon at least
with cost for strengthening capacity, 2011 Census
and the 2012/2013 Household Budget Survey.(p.s.
we shall include LAMP)
20Estimated Design CostImportant notes
- Reliable Statistics are important we need them
for Developing and Monitoring Policy, for
adequate Planning purposes and for Research. The
importance of Statistics is often acknowledged in
wide circles but still, when times come for
budgetary cuts, Statistical Offices are among the
first to suffer! - When the reasoning may point in the direction of
budgetary cuts in statistics that is precisely
the time when we need the figures to guide us out
of our economic and social problems that
challenge the level of living of our countries
(Busby, 1996)
21TIME TABLE
22THE INITIATING LAUNCH AT A PRESS CONFERENCE
- On 25 June 2009, there was a Press conference
with invitees from - Parliament (Standing Committee for Planning and
Development Cooperation), Private Sector,
Government institutions, Autonomous and
semi-autonomous bodies, NGOs, Trade Unions,
International Organizations, the Press.
23THE INITIATING LAUNCH AT A PRESS
CONFERENCE(continued)
- Registration took place between 8.30 and 9.00 and
at 9.05 the MC issued her welcome remarks. - From 9.10 to 9.30 the Director of Statistics had
a short presentation entitled Enige Opmerkingen
over Strategic Statistical Planning met nadruk op
CARICOM en SIDS. - Translation (Some remarks concerning Strategic
Statistical Planning with an emphasis on CARICOM
and SIDS).
24THE INITIATING LAUNCH AT A PRESS
CONFERENCE(concluded)
- From 9.30 to 9.45 the Minister of PLOS made his
remarks regarding the importance of Statistics
(for Policy, for Planning, for efficient and
effective allocation of means, for Research),
Sources for Statistics, and the importance of a
proper mix between sources as well as the
indispensable role an NSDS has to play in this
process. The minister also referred to why the
launch was taking place in that particular
period, called upon the press to guide the
process critically but constructively so that
within 15 year (Hopefully, Surinames 3rd NSDS
round), the SSS may proudly rank among the top in
the world. He finally stated that he had
officially initiated the process towards the
development of Surinames NSDS 2010-2014
25CURRENT STATE OF AFFAIRS IN SURINAME-1
- Although the Minister of PLOS sensitized his
colleagues and other Stakeholders on this matter,
after the letter inviting the organizations to
formalize their nominations were sent out between
29 June and 3 July 2009, stipulating Wednesday 15
July 2009 as the deadline for nominations, by
Friday 17 July 2009 the Ministry of PLOS had only
received a small subset of the nominations.
26CURRENT STATE OF AFFAIRS IN SURINAME-2
- It seems, as happens ever so often, that we are
again confronted with lip service, resistance to
change and extremely slow movement. - We shall prevail!!!!!
27TH??? !!!
- THANK YOU FOR YOUR ATTENTION AND PARTICIPATION.