Peter Trachtenberg - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Peter Trachtenberg

Description:

WIRELESS INFRASTRUCTURE REPORT AND ORDER Peter Trachtenberg Deputy Chief Spectrum and Competition Policy Division Wireless Telecommunications Bureau – PowerPoint PPT presentation

Number of Views:74
Avg rating:3.0/5.0
Slides: 8
Provided by: Maira
Category:

less

Transcript and Presenter's Notes

Title: Peter Trachtenberg


1
Wireless Infrastructure Report and Order
  • Peter Trachtenberg
  • Deputy Chief
  • Spectrum and Competition Policy Division
  • Wireless Telecommunications Bureau

2
Summary of the Report and Order 1. Section
6409(a) 2. Shot Clock Clarifications
3. National Environmental Policy Act (NEPA)
Review Processes 4. National Historic
Preservation Act (NHPA) Review Processes
5. Temporary Towers Notification Exclusion
3
  • 1. SECTION 6409(A)
  • Defines key terms
  • existing wireless tower or base station
  • substantial change
  • Localities may require documentation
    reasonably related to determining if 6409(a)
    applies
  • 60 day period of review
  • Deemed grant remedy
  • Disputes resolved in local court, not at the
    Commission

4
  • 2. Shot Clock Clarifications
  • Tolling shot clock for incompleteness
  • DAS and small cell deployments are
    covered by the shot clock
  • The shot clock runs regardless of any local
    moratoria
  • No deemed granted remedy
  • Preferences for siting on government property
    not per se unlawful

5
  • 3. NEPA Review Processes
  • Exclusions from environmental review
  • Collocations on existing structures, including
    associated equipment and interior collocations
  • New deployments in utility rights-of-way that are
    in active use
  • These exclusions do not exempt deployments
    from review for effects on historic properties

6
  • 4. NHPA Review Processes
  • Exclusion of deployments on utility poles and
    transmission towers outside of historic
    districts
  • Subject to size limit and no new disturbance
  • Exclusion of deployments on other non- historic
    structures outside of historic districts
  • Must be near pre-existing antenna
  • Visibility restrictions, other conditions

7
  • 5. Temporary Towers
  • Codifies the public notice waiver for
    temporary towers
  • Exemption applies to towers that
  • In place for 60 days or less
  • Do not require marking or lighting
  • Less than 200 feet in height
  • Minimal or no ground excavation
  • Do not require environmental assessment
Write a Comment
User Comments (0)
About PowerShow.com