Title: LAND SUBSIDENCE AND EARTH FISSURES IN ARIZONA
1LAND SUBSIDENCE AND EARTH FISSURES IN ARIZONA
Ching Sheng, Seah (ID 4147549)? Melanie Poller
(ID 2106795)? Nhu Quynh Thi Nguyen (ID
4112793)?
2- Content
- Problems
- Geological Aspects
- Solutions
3Earth fissure damage to residence in
Nevada (photo by John Bell)?
4Fissure gully near Picacho, Arizona (Photo by
S.R. Anderson, USGS)
5Fissure gully crossing below above-grade pipe at
a mine facility in Nevada (photo by AMEC
presented in 2004 ADOT workshop)?
Central Main Lateral Canal of the CAP crossing
the Picacho earth fissure (photo by Michael
Carpenter)?
6SUMMARY OF THE PROBLEMS
- Increasing of all water use
- Warming climate
- RESULTS
- Cracking of buildings
- Damage to roads, railway, storm sewers,
underground pipelines,canals, etc. - Cracks without advance warning
7SUBSIDENCE
- Groundwater withdraw from aquifers in sedimentary
basin - Bowl-shaped depression
EARTH FISSURES AND FISSURE GULLIES
- Cracks, seams or separations
- The sediment properties and stresses results in a
subsurface rupture or separation - Fissure Gullies erosive forces move sediment
downward
8CRACK FORMATION
SUBSIDENCE
A
B
D
C
COMPRESSION
E
F
(Herman Bouwer - Land Subsidence and Cracking Due
to Ground Water Depletion)
- Withdrawal of groundwater in the center
- Clay beds and other formations -thickest in the
center - thinner toward the edges - Overlying alluvium rotate
9CRACK FORMATION
SUBSIDENCE
CRACK
COMPRESSIBLE BEDS
COMPRESSION
(Herman Bouwer - Land Subsidence and Cracking Due
to Ground Water Depletion)
- Groundwater withdrawal - ridge - alluvial
materials - thicker - Linearly increasing subsidence
- Overlying slabs rotate
10MONITORING AND POST CONSTRUCTION REMEDIAL ACTION
11SUBSIDENCE MONITORING
- Geographic Information System (GIS)
- Close Range Photogrammetric System
12- Global Positioning System (GPS)
- Management tool
- Schedule
- Identify
- Evaluate
13POST CONSTRUCTION REMEDIAL ACTION
- Keep Water Path Away from earth fissures
- Sealing of surface earth fissures
Diversion of Drainage - Prevent erosion of surface flows -large gullies
- Solution
- Clay Bentonite mixed with soil Soil cement
- (Good in treating Enlarged fissures)
- Filling with Gravel
- (less succesfull)
14- Using Cutoff Wall
- Sheet Piling Cutoff Walls
- Water Path Earth Fissure deep stability
- (Successful but hairline cracks developed)
- Geotextile Cutoff Barriers
15THANK YOU!!