Capability Maturity Model - PowerPoint PPT Presentation

About This Presentation
Title:

Capability Maturity Model

Description:

Title: personal software process Author: david gustafson Last modified by: dag Created Date: 8/30/1997 12:20:26 PM Document presentation format: On-screen Show – PowerPoint PPT presentation

Number of Views:73
Avg rating:3.0/5.0
Slides: 13
Provided by: davidgu64
Category:

less

Transcript and Presenter's Notes

Title: Capability Maturity Model


1
Capability Maturity Model
  • Software Engineering Institute
  • www.sei.cmu.edu

2
CMM
  • 5 level assessment of a software development
    organizations capabilities
  • Promoted by DoD
  • Level 3 required

3
CMM has multiplied
  • There are now many different maturity models from
    SEI

4
CMM levels
  • 5 optimizing
  • 4 managed
  • 3 defined
  • 2 repeatable
  • 1 initial (everyone else)

5
KPA
  • Key Process Areas
  • Requirements for achieving a maturity level
  • Table 1 p 67

6
SEI Capability Maturity ModelsImpact on
Contractors
  • Hossein Saiedian and Richard Kuzara
  • Computer 1995
  • Pp65-75

7
CMM
  • CMM is based on the premise that major
    software-development problems and, hence, causes
    for project failures are managerial rather than
    technical. p 68

8
Other models
  • Caper Joness model
  • ISO 9001

9
Cost of CMM
  • Hughes SE Division
  • Level 2 to level 3
  • 2 years
  • Cost of 400, 000
  • Savings of 2 million

10
Achieving Higher SEI Levels
  • Michael Daskalantonakis
  • Computer 94
  • Pp85-92

11
Motorolas CPI
  • SEI Progress Assessment
  • Scoring each KPA activities

12
Kiviat Diagram e.g. fig 4 p89
Write a Comment
User Comments (0)
About PowerShow.com