d-Au Status - PowerPoint PPT Presentation

About This Presentation
Title:

d-Au Status

Description:

Fri 16 Nov: First collisions; 800 Hz. Sun 18 Nov: 37x37, 90%, 18 kHz. Mon 26 Nov: Physics ... Wed 26 Dec: 0.7 m beta-star in blue and yellow. Wed 2 Jan: Phenix ... – PowerPoint PPT presentation

Number of Views:57
Avg rating:3.0/5.0
Slides: 18
Provided by: CADepa
Category:
Tags: status

less

Transcript and Presenter's Notes

Title: d-Au Status


1
d-Au Status Chronology
  • 29 January 2008

Kip Gardner
2
b4-q89 trip
Yellow collimator limit switch
APEX
APEX
3
Ring to ring synchro
Vernier scans
Yellow dipole feedback setup
Injection Drift comp
Test Coll on ramp
IR waist knobs
IR Waist knobs
4
Revert to wed
5
FEC went down
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
Chronology
  • Mon 22 Oct d at full energy in Booster.
  • Tue 30 Oct d to W dump.
  • Thur 1 Nov Blue cool-down begins.
  • Sat 3 Nov Au79 to W dump. Mode switching
    established.
  • Mon 5 Nov Blue cool-down complete.
  • Tue 6 Nov Yellow cool-down complete.
  • Fri 9 Nov d captured in blue.

16
Chronology (contd)
  • Sun 11 Nov Au injected into yellow with good
    lifetime.
  • Mon 12 Nov Blue ramp efficiency 54.
  • Wed 14 Nov Blue ramp efficiency 81 yellow 55.
  • Fri 16 Nov First collisions 800 Hz.
  • Sun 18 Nov 37x37, 90, 18 kHz.
  • Mon 26 Nov Physics declared at 4 pm.
  • Fri 30 Nov Stochastic cooling operational.

17
Chronology (contd)
  • Wed 19 Dec 0.8 m beta-star in yellow.
  • Wed 26 Dec 0.7 m beta-star in blue and yellow.
  • Wed 2 Jan Phenix magnets reversed.
  • Tue 8 Jan 160 kHz.
  • Wed 23 Jan 175 kHz.
  • Sat 26 Jan 200 kHz.
  • Sun 27 Jan d-Au run ends at 8 pm.
Write a Comment
User Comments (0)
About PowerShow.com