1First United Methodist Church Katy, Texas Master
Plan Presentation December 8, 2009
2DISCUSSION
NOTE BECAUSE THE INTENT IS TO NOT DISPLACE THE
SCHOOL FOR THE 12 TO 14 MONTH CONSTRUCTION
DURATION, AT THE CONCLUSION OF THE DISCUSSION THE
COMMITTEE AGREED TO PURSUE ONLY THE OPTIONS
WHICH ALLOWED THE EXISTING CLASSROOM BUILDING TO
REMAIN IN OPERATION DURING CONSTRUCTION. AS A
RESULT, THE FOLLOWING TWO (2) VARIATIONS OF
OPTION 1 ARE BEING PRESENTED HEREWITH ALONG
WITH ASSOCIATE PROS AND CONS FOR EACH.
3- PROS
- ALLOWS EXISTING CLASSROOM BUILDING TO REMAIN
DURING CONSTRUCTION - ALLOWS FELLOWSHIP HALL TO REMAIN
- ALLOWS FLEXIBILITY AS FUTURE BUILDINGS COM
ON-LINE - PRESERVES PERIMETER TREES
- ALLOWS SHARED DROP-OFF
- WAYFINDING IMPROVED
- PARKING IS EVENLY DISTRIBUTED
- PHASE 1 BUILDING FOOT PRINT IS MAXIMIZED, WHICH
REDUCED CONSTRUCTION COST AND REDUCES ENGERGY
CONSUMPTION. - FOOT PRINT MAXIMIZES ADDITIONAL AVAILABLE LAND
- PLAYGROUND COULD BE LOCATED BELOW TREES CANOPY AT
SOUTHEAST CORNER OF PROPERTY UNTIL FUTURE WORSHIP
CENTER IS BUILT. - ALLOWS THE MAJORITY OF TREES IN SOUTHEAST CORNER
OF THE SITE TO REMAIN IN PHASE 1.
OPTION 1A
DASHED RED OUTLINE INDICATES EXTENT OF TWO STORY
PHASE 1
VEHICLE DROP-OFF
PLAY GROUND
- CONS
- LIMITED TREE REMOVAL (HOWEVER, ONLY TWO (2) MORE
THAN OPTION 1B).
4- PROS
- ELIMINATES THE POSSIBILITY OF BUILDING A NEW
WORSHIP CENTER AT THE SOUTH EAST CORNER (FACING
DOWNTOWN) IN THE FUTURE. - INCREASES BUILDING COST AND INCREASES ENERGY
USAGE DUE TO MAXIMIZING PERIMETER WALL / BUILDING
ENVELOPE. - ALLOWS A MAXIMUM OF TWO (2) ADDITIONAL TREES
(MORE THAN OPTION 1A) TO REMAIN - ALLOWS FELLOWSHIP HALL TO REMAIN
- DOES NOT ALLOW FLEXIBILITY FOR FUTURE MASTER
PLANNING OPTIONS. - FOOT PRINT MINIMIZES ADDITIONAL AVAILABLE LAND
FOR FUTURE DEVELOPMENT
OPTION 1B
VEHICLE DROP-OFF
PLAY GROUND
DASHED RED OUTLINE INDICATES EXTENT OF TWO STORY
PHASE 1
- CONS
- LOCATES THE PLAYGROUND AT THE FRONT DOOR ADJACENT
TO THE MAIN DROP-OFF - VEHICULAR DROP-OFF IS FARTHER FROM THE WORSHIP
CENTER - LIMITED TREE REMOVAL
5Agenda
- Review Owner Comments
- Present Options / Issues w/o Alley
- The purpose of presenting these Options is to
establish consensus for a final solution, which
will be the basis for detailed Schematic Design. - Discussion
6- PROS
- ALLOWS EXISTING BUILDINGS INCLUDING CLASSROOM
BUILDING TO REMAIN IN OPERATION DURING
CONSTRUCTION - ALLOWS FELLOWSHIP HALL TO REMAIN
- ALLOWS FLEXIBILITY FOR LOCATING FUTURE
BUILDINGS. - ALLOWS SHARED DROP-OFF WITH FUTURE BUILDINGS
- WAYFINDING IMPROVED
- PARKING IS EVENLY DISTRIBUTED
- PHASE 1 BUILDING FOOT PRINT IS CONDENSED, WHICH
REDUCED CONSTRUCTION COST AND REDUCES ENGERGY
CONSUMPTION. - FOOT PRINT MAXIMIZES ADDITIONAL AVAILABLE LAND
- PLAYGROUND COULD BE LOCATED BELOW TREES CANOPY AT
SOUTHEAST CORNER OF PROPERTY UNTIL FUTURE WORSHIP
CENTER IS BUILT.
OPTION 1A New Education Building
DASHED RED OUTLINE INDICATES EXTENT OF TWO STORY
PHASE 1
VEHICLE DROP-OFF
PLAY GROUND
- CONS
- SIX (6) TREES LOST, HOWEVER, PRESERVES THE
MAJORITY OF PERIMETER TREES
SEQUENCE
7OPTION 1A Partial Demolition
VEHICLE DROP-OFF
PLAY GROUND
RED HATCH INDICATES EXTENT OF PARTIAL DEMOLITION
TO ACCOMMODATE PHASE 1
SEQUENCE
8OPTION 1A New Admin. Infill Building
VEHICLE DROP-OFF
PLAY GROUND
ADMINISTRATION INFILL GATHERING ADDITION PHASE 1
SEQUENCE
9OPTION 1A Demolish Existing Bldg.
VEHICLE DROP-OFF
PLAY GROUND
EXISTING EDUCATION BUILDING DEMOLISHED
SEQUENCE
10OPTION 1A Future Build-out
FUTURE BUILDING LOCATION
VEHICLE DROP-OFF
PLAY GROUND
POTENTIAL FUTURE RENOVATION / CONVERSION OF
EXISTING BUILDING TO MEETING SPACE
SEQUENCE
11OPTION 1A PHASE 1
AERIAL VIEW FROM CORNER OF 4TH STREET AND AVENUE A
12PHASE 1
AERIAL VIEW FROM CORNER OF 5TH STREET AND AVENUE B
13PHASE 1
VIEW FROM CORNER OF 4TH STREET AND AVENUE A
14OPTION 1A EXPANDED PHASE 1
15OPTION 1A New Education Building
AREA TREES WILL BE LOST IN PHASE 1A
16- PROS
- ALLOWS EXISTING BUILDINGS INCLUDING CLASSROOM
BUILDING TO REMAIN IN OPERATION DURING
CONSTRUCTION - ALLOWS FELLOWSHIP HALL TO REMAIN
- WAYFINDING IMPROVED
- PARKING IS EVENLY DISTRIBUTED
- PHASE 1B BUILDING FOOT PRINT IS ELONGATED, WHICH
INCREASES CONSTRUCTION COST AND INCREASES ENGERGY
CONSUMPTION.
OPTION 1B New Education Building
DASHED RED OUTLINE INDICATES EXTENT OF TWO STORY
PHASE 1
VEHICLE DROP-OFF
- CONS
- SAME NUMBER OF TREES LOST IN PHASE 1 ADDITIONAL
TREES, SIMILARLY PRESERVES THE MAJORITY OF
PERIMETER TREES - ALLOWS FLEXIBILITY FOR LOCATING FUTURE
BUILDINGS. - FOOT PRINT LIMITS ADDITIONAL AVAILABLE LAND.
PLAY GROUND
17OPTION 1B New Education Building
DASHED RED OUTLINE INDICATES EXTENT OF TWO STORY
PHASE 1
18OPTION 1A New Education Building
AREA TREES WILL BE LOST IN PHASE 1B
19OPTION 1B EXPANDED PHASE 1
20OPTION 1B PHASE 1
AERIAL VIEW FROM CORNER OF 5TH STREET AND AVENUE A
21OPTION 1B PHASE 1
AERIAL VIEW FROM CORNER OF 4TH STREET AND AVENUE A
22OPTION 1B PHASE 1
AERIAL VIEW FROM CORNER OF 4TH STREET AND AVENUE A
23ALT. OPTION
- CONS
- THERE IS NOT ADEQUATE SQUARE FOOTAGE AVAILABLE TO
ACCOMMODATE THE SCHOOLS ACCREDITATION
PROGRAMMATIC REQUIREMENTS. - FOR THAT REASON, IT IS NOT A FEASIBLE OPTION.
- ADDITIONALLY, REQUIRES A VARIANCE FROM THE
INTERNATIONAL BUILDING COSDE DUE TO LESS THAN
MINIMAL PROXIMITY TO EXISTING BUILDING. - COST OF CONSTRUCTION IS IMPACTED DUE TO PROXIMITY
TO EXISTING BUILDING AND LIMITED WORK AREA.