Title: IEEE DASC Co-Sponsorship of UPF Working Group
1IEEE DASC Co-Sponsorshipof UPF Working Group
- Proposal prepared by
- Stephen Bailey
- Chair, Accellera UPF Technical Subcommittee
2Agenda
- Request for DASC co-sponsorship of WG
- Background of UPF-TSC
- UPF from start to finish
- IEEE and Accellera relationship
- Working group
- IEEE Timeline
3Background for UPF-TSC
4Industry Need
- Power has become the dominate factor in the
design of todays electronic systems - Explosion in battery operated systems
- Many (most) non-portable designs are also
constrained by power consumption requirements - Heat generation and dissipation
- Practical power supply management
- Current state is a hodge-podge of commercial and
ad hoc solutions - SAIF, GAF, etc.
- Specification of power aware design
characteristics - Often done late at gate-level and ad hoc
- Need to verify correctness of power-aware
functionality - Done sooner and with higher correlation to design
intent
5Demonstrated Need
- DAC 2006
- TI and Nokia organized a meeting on the topic of
an open standard for low power design flows - The 4 top EDA vendors attended
- Plus Atrenta
- Broad, significant user representation including
- TI
- Nokia
- ARM
- ST
- Philips
- Sun
- Shrenik Mehta represented Accellera
- Demand for Open, Fast, Inclusive standard
6Mission of Accellera Low Power Flow TSC
- The accelerated development of an open,
comprehensive standard for the specification of
power-aware requirements, design intent and
implementation, verification and analysis across
all design abstraction levels.
7Proposed Timeline
Week Of Milestone
28 Aug 06 Accellera TSC formation
11 Sep 06 Accellera/Si2 Sponsored Workshop
18 Sep 06 Design Objectives Document Weekly meetings start
30 Oct 06 First drafts available for review
30 Nov 06 Submission to Accellera Board for Approval
31 Jan 07 Hand-off to IEEE and/or other suitable standards organizations
8UPF from Start to Finish
- August 28, 2006 January 23, 2007
9Actual Timeline
Week Of Milestone
28 Aug 06 Accellera TSC formation
18 Sep 06 Frequent telecon and face-to-face meetings commence
25 Sep 06 Design Objectives Document
05 Oct 06 Accellera/Si2 Sponsored Workshop
23 Oct 06 All donations accepted
6 Dec 06 Prospective UPF WG previewed at CAG meeting
27 Dec 06 First draft available for review
10Actual Timeline
Week Of Milestone
19 Jan 07 Final draft available for review
23 Jan 07 Final draft completion
23 Jan 07 Accellera TSC approval
24 Jan 07 Submission to Accellera Board for Approval
26 Jan 07 Proposal for DASC co-sponsorship
P 9 Feb 07 Submit PAR for NesCom consideration
P 22 Feb 07 Accellera Board approval of UPF
P 23 Mar 07 NesCom approvalAccellera UPF donation to IEEE
P planned
11Highlights
- Openness demonstrated throughout
- Everyone invited and allowed to participate in
TSC - Accellera membership not required to join
- Documents available to all TSC members
- Fast
- Merely 5 months from start to finish
- Inclusive
- Unprecedented donations from 8 companies
- EDA suppliers and users donated
- Members and non-members of Accellera
12IEEE and Accellera Relationship
13Accellera and IEEE
- Accellera has long-standing relationship with
IEEE - Accellera Technical Committee Policies,
Procedures, Guidelines - All established Accellera standards are
eventually planned for IEEE standardization to
speed worldwide acceptance of such standards. - Specification format, strawman donation and any
other ownership documents follow or exceed IEEE
rules and guidelines. - Plan of record is to transfer UPF to IEEE when
complete - Since inception of IEEE Corporate Standards
Program, Accellera Board recommends all standards
be entity-based - SystemVerilog, PSL, OCI, UPF
14CAG/DASC UPF Working Group
15UPF Working Group
- Submit draft PAR to DASC Chair for SC review and
comment NLT 31 Jan 07 - Sponsor PAR jointly with CAG
- Draft PAR presented to CAG 6 Feb 07
- Entity-based
- Open to everyone
- Initial WG chair Stephen Bailey
- Conduct elections within DASC required 6 month
period for all WG officers - Follow prior precedent of operating procedures
for jointly sponsored WGs
16IEEE Timeline
17IEEE Timeline
Date Milestone
26 Jan 07 DASC approval of co-sponsorship (With opportunity of SC to comment on PAR before CAG consideration)
06 Feb 07 CAG approval of joint sponsorship for PAR
09 Feb 07 PAR submission
22 Mar 07 NESCOM approval of PAR
23 Mar 07 Formation of working group and call for contributions
18Request approval of DASC-SC for UPF Working Group
Co-Sponsorship
19On Convergence
- The UPF WG is willing
- To accept more than one technology donation
- Provide the forum for converging multiple
industry formats into a single standard - Change the name of the resulting standard
- Conditions
- Only one All donations for consideration must
be submitted quickly