Technology Solutions, LLC MU-20007 April Thompson Project Manager Neera Desai Operations Advisor Charles Lively Technical Advisor Background Technology ... – PowerPoint PPT presentation

Number of Views:82
Avg rating:3.0/5.0
Slides: 12
Provided by: Darrell103
Category:

less

Transcript and Presenter's Notes

Title: Technology Solutions, LLC MU-20007


1
Technology Solutions, LLC MU-20007
  • April Thompson Project Manager
  • Neera Desai Operations Advisor
  • Charles Lively Technical Advisor

2
Background
  • Technology Solutions, LLC is a full service
    Information Technology Company
  • Services Provided
  • Consulting
  • Internet Setup, Filtering and Monitoring
  • Troubleshooting
  • Networking

3
Problem
  • Goal
  • Assist Mercer in becoming one of the best
    engineering institutions in the country.
  • Upgrade existing facilities to better accommodate
    instructional technology.
  • Scope Of Work (SOW)
  • Equip and configure rooms 102 and 111A to
    provide Internet, network and printing access for
    at least 20 laptops in each room.

4
Technical Plan
  • Maintain Existing Network Structure
  • Implement Wireless Technology
  • Five Phase Technical Plan
  • Restructure Room Layout

5
Five Phases of the Tech Plan
  • Phase 1 Cleaning out the rooms
  • Phase 2 Wireless Network
  • Phase 3 Furnishing the rooms
  • Phase 4 Installation/Troubleshooting
  • Phase 5 Training

6
Room Layouts
Rm 102
Rm 111A
7
Operations
  • Budget

8
Operational Plan
  • Quality Control
  • Training Materials
  • Hiring Assistants

9
Management Structure
                               
Charles Lively
  • Project Manager
  • Main point of contact and over viewer
  • Operations Advisor
  • Scheduling and operational procedures,
    procurement of materials
  • Technical Advisor
  • Technical support, design and troubleshooting

10
Management Strategies
  • Integration
  • Scope
  • Time
  • Cost
  • Procurement
  • Quality
  • Human Resource
  • Communications
  • Risk

11
Summary
  • In achieving the central goal in providing
    excellent teaching and learning facilities, our
    solution provides the necessary components.
  • Grant request for 220,000
  • Qualified Project Management Team
  • Detailed Technical Plan
  • Organized Operations Structure