Title: Internal Quality Audits (4.14)
1Internal Quality Audits (4.14)
- - ISO 15189 Requirements for Internal Audits
- - The Audit Process
- - Templates for Meeting Requirements
2Requirements for Internal Quality Audits
- All elements 15 management and 8 technical of ISO
15189 should be audited during a calendar year. - Must have a procedure for planning and
implementing internal quality audits so as to
verify the elements and systems of the quality
management system are implemented and effective.
3Requirements for Internal Quality Audits
- Audits should be planned and performed by the
Quality Manager/ Officer or nominee - You cannot audit your own activities
- The procedure for internal audits should define-
- - Audit types vertical/ horizontal to be
performed - - Frequency of these audits (schedule)
-
4Requirements for Internal Quality Audits
- The procedure for internal audits should define-
- - Methodology for performing the audit
including reporting and close out processes - - Corrective action/ preventative action must
be documented and taken within an agreed time
frame - Results of internal audits form part of the
Quality Management System review process
5The Audit Process
- What is an audit?
- It is a planned or documented activity planned
- in accordance with written procedures and
- checklists, to verify by examination and
- investigation of objective evidence, that
- applicable elements of a quality programme or
- plan have been developed, documented and
- effectively implemented in accordance with
- specified requirements.
6The Audit Process
- Depth of Audit
- Horizontal audit (system audit)
- Will verify that each element of the quality
- management system are described,
- implemented and effective e.g.
- 4.1 to 4.15 15
- 5.1 to 5.8 8
- Total of 23 elements
7The Audit Process (Depth of Audit)
- Vertical Audit
- - Will review in detail the testing
departments in a laboratory. - - All testing departments should be audited
over the course of 12 months. - - A vertical audit is designed to cover
activities from procurement of specimen to
issue of results. - - The audit uses the details of 2 known
specimens
8The Audit Process (Depth of Audit)
- Vertical Audit
- The auditors must consider-
- Man (trained, competent, motivated)
- Materials (traceable, correct type, passed
incoming inspection, correctly used, cleaned
etc.) - Machine (calibrated, validated, maintenance QC)
- Method (clear, up to date, correct version)
- Mileau (temperature, particulate count, humidity
etc.)
9The Audit Process (Depth of Audit)
System audit e.g. 4.1 (horizontal)
Vertical audit e.g. haematology
Which has more depth horizontal or vertical?
10The Audit Process
- Audit process (same for internal, supplier or
- extrinsic audits)-
- Preparation and planning
- Performance of the audit
- Exit meeting
- Audit report
- Follow up
11The Audit Process
- Audit Planning
- Audit schedule (12 month plan) horizontal and
vertical is issued to Laboratory Management - Appoint trained personnel to perform the audits
lead auditor (independent) - Notify the auditee at least 1 week in advance.
Confirm in writing the timetable and personnel
involved
12The Audit Process (Planning)
- Identify, obtain and review all relevant
documentation prior to the audit relevant to the
scope of the audit. - - previous audit reports (follow up)
- - quality manual
- - procedures
- Develop audit checklist or have them pre prepared
for horizontal or vertical audits. The audit
checklist controls the continuity and depth of
the audit.
13The Audit Process (Performance)
- Entry meeting (2 mins)-
- - Introductions
- - Confirm purpose/ scope
- - Timetable including time for exit meeting
- - Confirm escorts for duration of the audit
14The Audit Process (Performance)
- 1 hour to 1 day
- Obtain objective evidence to verify compliance/
non compliance and document same on checklist
documentation. - Questions should be asked to illicate full
response. - Following completion of the audit and before the
closing meeting the audit team will meet to
evaluate the evidence and agree on non
conformances found and their classification. - A list of non compliances is then made.
15The Audit Process (Performance)
- Exit Meeting (5 mins)
- The lead auditor controls the exit meeting.
- The exit meeting will focus on-
- - the outcome of the audit
- - ensure the auditee understands and accepts
the findings. - - agree date for the final release of the audit
report. - - agree dates for close out of non conformances
16The Audit Process
- Audit Report
- The formulation of the audit report must
contain- - - cover sheet.
- - a report sheet with corrective action report
and agreed action and close out dates. - - non conformances (corrective action requests)
including classification. -
17The Audit Process
- Audit Report contd
- General observations should be noted including-
- areas audited
- activities found satisfactory
- activities with concerns
18The Audit Process
- Follow up
- Quality Assurance Manager/ Officer/ Nominee
verifies actions are closed out within an agreed
time frame. - Upgrade to major if not closed out within the
agreed time frame.
19The Audit Process
- Characteristics of a Good Auditor
- Good knowledge of the activity being audited
- Communication skills (articulate)
- Objective (stick to the facts)
- Open minded
- Good listener
- Observant
- A process approach
- Meticulous
20The Audit Process
- Characteristics of a Good Auditor contd
- Impartial
- Professional
- Diplomatic
- High degree of integrity
- Patient
- Self driven and disciplined
- The auditor should never be aggressive no matter
what happens
21The Audit Process
- Characteristics of a Good Auditor contd
- Summary
- A good auditor should be a guide, philosopher
and a friend.
22The Audit Process
- Number of Trained Auditors
- At least one per discipline
- Auditors must write their own reports and
- follow up the close out of corrective actions
23Templates for Meeting Requirements
- Templates provided are-
- Template 1 Internal Quality Audit Schedule
- Template 2 Internal Audit Report Lead
- Sheet
- Template 3 Checklist for Vertical Audit
- Template 4 Checklist for Horizontal Audit