Kent Route Director Andrew Munden - PowerPoint PPT Presentation

About This Presentation
Title:

Kent Route Director Andrew Munden

Description:

Agenda Introduction Network Rail s Role Network Capacity Network Constraints Timetable Development Process London Bridge Station ... in Greater London TfL has ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 8
Provided by: Cmat55
Category:

less

Transcript and Presenter's Notes

Title: Kent Route Director Andrew Munden


1
Kent Route DirectorAndrew Munden
  • November 2008

2
Agenda
  • Introduction
  • Network Rails Role
  • Network Capacity
  • Network Constraints
  • Timetable Development Process
  • London Bridge Station
  • Station Improvements
  • Questions

3
Network Rail
  • Network Rail Does
  • Operate, maintain, renew and enhance the network
  • Co-ordinate the production of RUSs
  • Allocate timetable slots according to route
    capacity constraints
  • Operate the 18 largest stations on the network
  • Network Rail Does Not
  • Specify train services including destination,
    frequency or rolling stock
  • Operate train services
  • Operate stations other than the 18 largest
    stations on the network

4
Network Constraints
5
Timetable Development Process
  • DfT specifies the timetable through franchise
    awarded to the train operator, in Greater London
    TfL has options to request enhancement to
    services
  • TfL, and other transport bodies and other
    affected passenger and freight operators are
    consulted on changes
  • TOC submits bids and Network Rail consults on
    operability of the base timetable with affected
    parties
  • Network Rail undertakes Timetable modelling
  • TOC publishes the detailed timetable

6
Station Improvements Considered
  • Queens Road Peckham
  • East Dulwich
  • Denmark Hill

7
Thank you
  • Any questions?