Deployment Adavatages Physical Test Apps Configure hardware Install OS Configure OS & Tools Assign IP Addr Configure Network 20-40 hrs of work 4-6 week lead time – PowerPoint PPT presentation

Number of Views:99
Avg rating:3.0/5.0
Slides: 29
Provided by: Leena6
Category:

less

Transcript and Presenter's Notes

Title: Deployment Adavatages


1
Deployment Adavatages
Physical
Test Apps
Configure hardware
Install OS
Configure OS Tools
Assign IP Addr
Configure Network
20-40 hrs of work 4-6 week lead time
lt1 hr of work 1-2 days lead time
Deploy from Template
Power on VM
Virtual
  • Provisioning time reduced to minutes, not days to
    weeks!

2
From server boot to running VMs in Minutes
?
  • Power on server and boot into hypervisor
  • Configure Admin Password
  • (optional) Modify network configuration
  • Connect VI Client to IP Address
  • Or manage with VirtualCenter

?
?
?
3
ESX Server (Single Server Deployment)
  • Deploy multiple virtual machines on a single
    physical server
  • Market leading

ESX Server
  • Performance
  • Stability
  • Scalability
  • Cross-platform support

Physical Server
4
ESX Server (Multiple Server Deployment)
5
VirtualCenter Capabilities
Centralized Management
What's new
6
The Virtual Infrastructure Stack Today
Infrastructure Optimization
SW Lifecycle
Desktop Management
Business Continuity
Resource Mgt
Security
Availability
Mobility
  • ESX Server
  • VMFS
  • Virtual SMP

17
7
Guided Consolidation
DISCOVER
  • Automatically discovers physical servers
  • Analyzes utilization and usage patterns
  • Converts physical servers to VMs placed
    intelligently based on user response

ANALYZE
CONVERT
Recommended for smaller environments
8
Non-Disruptive Capacity on Demand
9
VMware VMotion
73 of VMware customers have implemented VMotion
in production
  • Live migration of virtual machines
  • Zero downtime

10
VMware DRS
67 of VMware customers use DRS in production
Business Demand
  • Dynamic and intelligent allocation of hardware
    resources
  • Ensure optimal alignment between business and IT

Resource Pool
11
Ensure High availability with VMware HA
  • VMware HA automatically restarts virtual machines
    when a physical server fails

X
Resource Pool
12
Distributed Power Management
Minimize power consumption while guaranteeing
service levels
  • Consolidates workloads onto fewer servers when
    the cluster needs fewer resources
  • Places unneeded servers in standby mode
  • Brings servers back online as workload needs
    increase

Business Demand
Power Off
Resource Pool
13
Storage VMotion
Storage VMotion minimizes planned downtime for
storage
  • Storage independent live migration of virtual
    machine disks
  • Zero downtime to virtual machines
  • LUN independent
  • Supported for Fibre channel SANs

14
VMware Update Manager
  • Eliminates manual tracking of patch levels of ESX
    Server hosts and virtual machines
  • Automates enforcement of patch standards
  • Reduces risk through snapshots and offline
    virtual machine patching

OFFLINE
Update Manager
Note RHEL guests can only be scanned, not
remediated
15
Non-disruptive ESX Server Patching with Update
Manager and DRS
  • Update Manager patches entire DRS clusters
  • Each host in the cluster enters DRS maintenance
    mode, one at a time
  • VMs are migrated off, host is patched rebooted
    if required
  • VMs are migrated back on
  • Next host is selected

Update Manager

VMotion
VMotion
16
Protect data with VMware consolidated backup
Centralized file level backup enables easy
reliable data protection
  • What is it?
  • Centralized agentless backup for virtual
    machines
  • Move backup out of the virtual machine
  • Eliminate backup traffic on the local area
    network
  • Pre-integrated with major 3rd-party backup
    products

CENTRALIZEDDATA MOVER
BACKUPPROXY
BACKUP DISK
17
ESX Server 3i
Next generation, thin hypervisor integrated in
server systems
  • Integrated in server systems
  • Easiest way to deploy and manage virtualization
  • Hardware is certified and ready-to-run
  • Intuitive start up experience that dramatically
    reduces deployment time
  • Optimized for remote management
  • Thin architecture
  • Unparalleled security and reliability
  • Compact 32MB footprint
  • Only OS-independent design focused on
    virtualization

18
Introducing VMware Site Recovery Manager
Site Recovery Manager leverages VMware
Infrastructure to transform disaster recovery
  • Simplifies and automates disaster recovery
    workflows
  • Setup, testing, failover, failback
  • Provides central management of recovery plans
    from VirtualCenter
  • Turns manual recovery processes into automated
    recovery plans
  • Simplifies integration with 3rd-party storage
    replication

19
DR Challenges Today
Challenges of Traditional DR Recovery Process
Prod
DR
Boot Pray
cd, tape or ghost image
WAN
Application
Application
OS
OS
x86
x86
OS files
OS files
local storage
local storage
Repl process OS Images App Data-Replication
SW SAN-SAN, OS based
Storage
Storage
Just Tier 1!
  • Complex to physically recover OS, applications
    data
  • Separate processes for system and application
    data
  • OS applications have dependencies on hardware
    configuration
  • Tier 2 3 applications left unprotected, adding
    to Tier 1 RTO risk

Slow and Unreliable Process
20
Replication with VMware Array-Based Replication
DR SITE
PRIMARY
WAN or Dark Fiber
Target VMFS
Source VMFS
SLAs High
21
Disaster Recovery
Recovery Site
Primary Datacenter
Host-based replication
30 miles
  • RPO of 15 minutes and RTO of 24 hours
  • Reduced TCO by 50
  • Saw ROI of 600 in four months

22
Customer Example Infrastructure Optimization
1200 Servers on 100 Physical Chassis
  • Utilization up to 80
  • 121 consolidation ratio
  • 201 Space reduction
  • 60 of x86 environment virtualized
  • Staffing not increased in 2.5 years
  • Provisioning reduced to hours from weeks

23
Software Lifecycle Automation
  • Developer Productivity
  • gt75 reduction in server-to-staff ratio
  • 10X reduction in system config time
  • 20 acceleration of software lifecycle
  • Software Quality
  • Assists defect capture and resolution in
    pre-production
  • 816,000 saved over 3 years
  • 21.6 days reduction per release cycle

24
Virtual Desktops
  • Benefits
  • Central Management, Security, Compliance
  • Business Continuity
  • Standard PC management model and isolation
  • Eliminated need to buy PCs
  • Reduced time to add a new PC image to lt10 min
  • Administer all desktops worldwide centrally with
    VirtualCenter

25
VI Transforms Key I.T. Metrics
Return on Assets
Overall Business Impact of IT
  • Reduce Response times by gt 90
  • Save gt30 of Budget allocate to strategic
    projects
  • Reduce Capex by gt 50
  • Increase Server Utilization by 3-4X
  • Reduced Opex by gt 70
  • Reduce Cost of Power Cooling by gt 85
  • Reduce Admin cost and Time by gt 80
  • Recovery Time down to minutes!
  • gt 90 of Apps assured of gt99.9 availability
  • 100 Apps now under DR plan

Operational Expenses
Uptime, Service Levels
26
State of Infrastructure Today Physical
Power Cooling
Server Sprawl
  • 38 m physical servers by 2010 - 700 increase in
    15 years
  • 140 bn in excess server capacity - a 3-year
    supply
  • 50c for every 1 spent on servers
  • 29 bn in power and cooling industry wide

Operating Cost
Space Crunch
  • 8 in maintenance for every 1 spent on new
    infrastructure
  • 20-30 1 server-to-admin ratio
  • 1,000 /sqft
  • 2,400 / server
  • 40,000 / rack

Source IDC
27
Virtualization Increases Hardware Utilization
Before VMware
Virtualization enables consolidation of workloads
from underutilized servers onto a single server
to safely achieve higher utilization
28
State of Infrastructure with Virtualization
Servers 1000 80 5,816 (per server removed)
HBAs 500 160 290
SAN Switches 22 8 na
Network Switches 84 10 296
Power (kWh) 407 52 759
Cooling (kWh) 509 64 949
Real Estate (Sq ft) 2053 257 431(3yr)
Total Savings(Over 3 years) 8,541 (per server)
Note Savings include estimated cost of VMware