Title: Deployment Adavatages
1Deployment Adavatages
Physical
Test Apps
Configure hardware
Install OS
Configure OS Tools
Assign IP Addr
Configure Network
20-40 hrs of work 4-6 week lead time
lt1 hr of work 1-2 days lead time
Deploy from Template
Power on VM
Virtual
- Provisioning time reduced to minutes, not days to
weeks!
2From server boot to running VMs in Minutes
?
- Power on server and boot into hypervisor
- Configure Admin Password
- (optional) Modify network configuration
- Connect VI Client to IP Address
- Or manage with VirtualCenter
?
?
?
3ESX Server (Single Server Deployment)
- Deploy multiple virtual machines on a single
physical server - Market leading
ESX Server
- Performance
- Stability
- Scalability
- Cross-platform support
Physical Server
4ESX Server (Multiple Server Deployment)
5VirtualCenter Capabilities
Centralized Management
What's new
6The Virtual Infrastructure Stack Today
Infrastructure Optimization
SW Lifecycle
Desktop Management
Business Continuity
Resource Mgt
Security
Availability
Mobility
- ESX Server
- VMFS
- Virtual SMP
17
7Guided Consolidation
DISCOVER
- Automatically discovers physical servers
- Analyzes utilization and usage patterns
- Converts physical servers to VMs placed
intelligently based on user response
ANALYZE
CONVERT
Recommended for smaller environments
8Non-Disruptive Capacity on Demand
9VMware VMotion
73 of VMware customers have implemented VMotion
in production
- Live migration of virtual machines
- Zero downtime
10VMware DRS
67 of VMware customers use DRS in production
Business Demand
- Dynamic and intelligent allocation of hardware
resources - Ensure optimal alignment between business and IT
Resource Pool
11Ensure High availability with VMware HA
- VMware HA automatically restarts virtual machines
when a physical server fails
X
Resource Pool
12Distributed Power Management
Minimize power consumption while guaranteeing
service levels
- Consolidates workloads onto fewer servers when
the cluster needs fewer resources - Places unneeded servers in standby mode
- Brings servers back online as workload needs
increase
Business Demand
Power Off
Resource Pool
13Storage VMotion
Storage VMotion minimizes planned downtime for
storage
- Storage independent live migration of virtual
machine disks - Zero downtime to virtual machines
- LUN independent
- Supported for Fibre channel SANs
14VMware Update Manager
- Eliminates manual tracking of patch levels of ESX
Server hosts and virtual machines - Automates enforcement of patch standards
- Reduces risk through snapshots and offline
virtual machine patching
OFFLINE
Update Manager
Note RHEL guests can only be scanned, not
remediated
15Non-disruptive ESX Server Patching with Update
Manager and DRS
- Update Manager patches entire DRS clusters
- Each host in the cluster enters DRS maintenance
mode, one at a time - VMs are migrated off, host is patched rebooted
if required - VMs are migrated back on
- Next host is selected
Update Manager
VMotion
VMotion
16Protect data with VMware consolidated backup
Centralized file level backup enables easy
reliable data protection
- What is it?
- Centralized agentless backup for virtual
machines - Move backup out of the virtual machine
- Eliminate backup traffic on the local area
network - Pre-integrated with major 3rd-party backup
products
CENTRALIZEDDATA MOVER
BACKUPPROXY
BACKUP DISK
17ESX Server 3i
Next generation, thin hypervisor integrated in
server systems
- Integrated in server systems
- Easiest way to deploy and manage virtualization
- Hardware is certified and ready-to-run
- Intuitive start up experience that dramatically
reduces deployment time - Optimized for remote management
- Thin architecture
- Unparalleled security and reliability
- Compact 32MB footprint
- Only OS-independent design focused on
virtualization
18Introducing VMware Site Recovery Manager
Site Recovery Manager leverages VMware
Infrastructure to transform disaster recovery
- Simplifies and automates disaster recovery
workflows - Setup, testing, failover, failback
- Provides central management of recovery plans
from VirtualCenter - Turns manual recovery processes into automated
recovery plans - Simplifies integration with 3rd-party storage
replication
19DR Challenges Today
Challenges of Traditional DR Recovery Process
Prod
DR
Boot Pray
cd, tape or ghost image
WAN
Application
Application
OS
OS
x86
x86
OS files
OS files
local storage
local storage
Repl process OS Images App Data-Replication
SW SAN-SAN, OS based
Storage
Storage
Just Tier 1!
- Complex to physically recover OS, applications
data - Separate processes for system and application
data - OS applications have dependencies on hardware
configuration - Tier 2 3 applications left unprotected, adding
to Tier 1 RTO risk
Slow and Unreliable Process
20Replication with VMware Array-Based Replication
DR SITE
PRIMARY
WAN or Dark Fiber
Target VMFS
Source VMFS
SLAs High
21Disaster Recovery
Recovery Site
Primary Datacenter
Host-based replication
30 miles
- RPO of 15 minutes and RTO of 24 hours
- Reduced TCO by 50
- Saw ROI of 600 in four months
22Customer Example Infrastructure Optimization
1200 Servers on 100 Physical Chassis
- Utilization up to 80
- 121 consolidation ratio
- 201 Space reduction
- 60 of x86 environment virtualized
- Staffing not increased in 2.5 years
- Provisioning reduced to hours from weeks
23Software Lifecycle Automation
- Developer Productivity
- gt75 reduction in server-to-staff ratio
- 10X reduction in system config time
- 20 acceleration of software lifecycle
- Software Quality
- Assists defect capture and resolution in
pre-production
- 816,000 saved over 3 years
- 21.6 days reduction per release cycle
24Virtual Desktops
- Benefits
- Central Management, Security, Compliance
- Business Continuity
- Standard PC management model and isolation
- Eliminated need to buy PCs
- Reduced time to add a new PC image to lt10 min
- Administer all desktops worldwide centrally with
VirtualCenter
25VI Transforms Key I.T. Metrics
Return on Assets
Overall Business Impact of IT
- Reduce Response times by gt 90
- Save gt30 of Budget allocate to strategic
projects
- Reduce Capex by gt 50
- Increase Server Utilization by 3-4X
- Reduced Opex by gt 70
- Reduce Cost of Power Cooling by gt 85
- Reduce Admin cost and Time by gt 80
- Recovery Time down to minutes!
- gt 90 of Apps assured of gt99.9 availability
- 100 Apps now under DR plan
Operational Expenses
Uptime, Service Levels
26State of Infrastructure Today Physical
Power Cooling
Server Sprawl
- 38 m physical servers by 2010 - 700 increase in
15 years - 140 bn in excess server capacity - a 3-year
supply
- 50c for every 1 spent on servers
- 29 bn in power and cooling industry wide
Operating Cost
Space Crunch
- 8 in maintenance for every 1 spent on new
infrastructure - 20-30 1 server-to-admin ratio
- 1,000 /sqft
- 2,400 / server
- 40,000 / rack
Source IDC
27Virtualization Increases Hardware Utilization
Before VMware
Virtualization enables consolidation of workloads
from underutilized servers onto a single server
to safely achieve higher utilization
28State of Infrastructure with Virtualization
Servers 1000 80 5,816 (per server removed)
HBAs 500 160 290
SAN Switches 22 8 na
Network Switches 84 10 296
Power (kWh) 407 52 759
Cooling (kWh) 509 64 949
Real Estate (Sq ft) 2053 257 431(3yr)
Total Savings(Over 3 years) 8,541 (per server)
Note Savings include estimated cost of VMware