Defining The Need - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Defining The Need

Description:

Defining The Need AM Standard Operating Procedure Defining the Need * Critical Items Data from a random sampling of latest unit reviews critical items from 27 ... – PowerPoint PPT presentation

Number of Views:11
Avg rating:3.0/5.0
Slides: 21
Provided by: KerryLT
Category:
Tags: carrier | defining | need

less

Transcript and Presenter's Notes

Title: Defining The Need


1
Defining The Need
  • AM Standard Operating Procedure

2
Critical Items
  • Data from a random sampling of latest unit
    reviews critical items from 27 districts
  • 250 offices
  • 1621 routes
  • Level 20 and above offices

3
Unit Layout
  • UNIT LAYOUT
  • YES NO
  • ARE BOTH DOCK AND WORKROOM FLOOR LAYOUTS 57
    43 EFFICIENT?
  • IS THE UNIT FREE OF HAZARDOUS CONDITIONS? 85
    15
  • ARE THE CARRIER CASE CONFIGURATIONS IN 48
    52 U SHAPE LAYOUT?
  • IS THE SUPERVISOR WORK STATION LOCATED FOR 62
    38 CLEAR OBSERVATION OF LETTER CARRIERS?
  • HAS THE UNIT MINIMIZED CASING EQUIPMENT? 38
    42 (20 OF OFFICES DID NOT ANSWER THIS
    QUESTION)

4
Office Performance
  • Office Performance
  • YES NO
  • ACTUAL ARRIVAL TIMES CONSISTENT WITH 43
    57 SCHEDULES?
  • CURRENT MAIL VOLUMES MATCH MAIL 39 61
    ARRIVAL PROFILE?
  • 80 OF AM CASEABLE MAIL AVAILABLE? 46
    54
  • FINAL MAIL ARRIVAL RECEIVED IN TIME TO 39
    61 ALLOW FULL ASSESSMENT BY SUPERVISOR?
  • IS MAIL FLOW FROM DOCK TO CARRIER 57 43
    UNIT EFFICIENT?

5
Office Performance
  • Office Performance
  • YES NO
  • ACCOUNTABLE TIME KEPT TO 6 MNUTES OR LESS 56
    44 PER ROUTE?
  • WITHDRAWAL TIME KEPT TO 5 MINUTES OR LESS? 28
    72
  • OFFICE BREAKS WITHIN SPECIFIED TIME 43
    57 LIMITS?
  • THROWBACK CASE MAIL PROPERLY PROCESSED 41
    59 AND DISPATCHED DAILY?
  • HOT CASE CLEARED BY CARRIERS? 77 23

6
Office Performance
  • Office Performance
  • YES NO
  • CARRIER START TIMES COORDINATED WITH MAIL
    64 36 ARRIVAL?
  • SUPERVISORS MEASURE AND RECORD ALL MAIL 73
    27 PRIOR TO CARRIERS ARRIVAL?
  • IS VOLUME RECORDED ACCURATELY BY ROUTE? 47
    53
  • IS ALL VOLUME RECORDED EARLY ENOUGH FOR 37
    63 EFFECTIVE DECISION MAKING?
    (CONTRADICTS PREVIOUS ANSWER)
  • VEHICLE INSPECTIONS COMPLETED WITHIN 3 MINUTES?
    27 73

7
Office Performance
  • Office Performance
  • YES NO
  • IS THE USE OF OT, PENALTY OT, 61 39
    AUX ASST MONITORED AND
    CONTROLLED?
  • ARE CONTROL FORMS, 3996, 1571, 54
    463997/DOIS DAILY ASSIGNMENT, DOIS
    DAILY PERFORMANCE REPORTS,1017-A B USED
    PROPERLY ?
  • DO CARRIERS BEGIN CASING 35 65
    IMMEDIATELY?

8
Office Performance
  • Office Performance
  • YES NO
  • DO CARRIERS CASE LETTERS FLATS EFFICIENTLY? 52
    48
  • IS TIME SPENT AWAY FROM WORK AREAS 52
    48 NECESSARY AND PRODUCTIVE?
  • DO CARRIERS LEAVE FOR THE STREET AS 27
    73 SCHEDULED AND/OR PROJECTED?
  • ARE CARRIERS PROPERLY SUPERVISED DURING 37
    63 ENTIRE P.M. OFFICE PERIOD?

9
Lakeland - Flats
10
Lakeland - Letters
11
Lakeland - DPS
12
Lakeland Street Efficiency
13
Lakeland Office Efficiency
14
Lakeland Office Hours
15
Gateway - Flats
16
Gateway - Letters
17
Gateway - DPS
18
Gateway - SEI
19
Gateway - OEI
20
Gateway Office Hours
Write a Comment
User Comments (0)
About PowerShow.com