Title: New Developments in VISSIM
1New Developments in VISSIM
- Lukas Kautzsch, PTV AG PTV Vision Users Group
Meeting USA 2008
2VISSIM 5.0 Main areas of work
- SUMSIM Second generation of VISUM-VISSIM
integration - Ring-Barrier Controller (RBC) to replace NEMA
- New Build, Setup and Update system
- Car2Car Communication
3Car-to-Car-Communication (C2C, C2X, VII)
- Vehicles can communicate
- with each other
- with the infrastructure
- Technology used
- WLAN (802.11p)
- GSM, UMTS etc.
- Applications
- Warning, e.g. road works
- Travel time measurement
- Virtual speed funnel
- Weaving assistance
- Hard shoulder usage
- Route guidance
4New Programming Interface in VISSIM for C2C
.dll
5Example Application
incident area
if veh.v lt v_warn then send_to_all (SpeedAlert,
veh.pos) if receive (SpeedAlert (warn_pos))
then if relevant (warn_pos) then
veh.color red veh.speed 50
km/h if (Distance lt dx_grenz)
then send_to_all (SpeedAlert, warn_pos)
6VISSIM 5.0 More Improvements
- Graphics
- Link display types
- Sketch Up import through V3DM
- Resolution of background images user definable
- Network Editor
- Editing of segment nodes
- Completion of broken routes much faster
- Nodes for dynamic assignment and evaluation
separated - Various improved details in the VISSIM Analyzer
- Many additional access functions in the COM
interface - Hyperlinks to hotline support form and FAQ in
info dialog
7Graphics Link Display Types
8Editing of segment nodes
9VISSIM 5.1 Main areas of work
- New pedestrian model
- Multi-Threading
- SUMSIM improvements
- Conflict area behaviour
10Multi-Threading
- Speedup on multi-core processor and
multi-processor computers - Shared memory
- Speedup depends on network and number of vehicles
11VISSIM 5.1 Conflict Area Parameters
- Vehicle-class dependent gaps and safety distance
factor - Stop line distance
- Avoid blocking (percentage)
- Observe adjacent lanes
- Anticipate routes (percentage)
12VISSIM 5.1 More Improvements
- Vehicle-class dependent prohibition of lane
change (per direction) - New signal time table editor for fixed time
controllers - Dynamic Assignment Use of real path travel times
- Complete unicode support for filenames (for
Russian, Chinese, Japanese) - HOT lane modeling
- Handling of large background images (Tiling)
- New 3D model selection dialog
- Handling of 3D objects (grouping, moving in 2D)
- Direct import of Sketch Up models into VISSIM
(without V3DM)
13Future development
- Technical issues
- Further work on multi-threading
- 64-bit version?
- Modeling issues
- Further work on pedestrian simulation
- Usability of dynamic assignment
- Better parking model improved multi-lane
drop-off