Title: DWAF FIVE-YEAR REVIEW
1DWAF FIVE-YEAR REVIEW Service delivery a five
year review 2004 to date Ms PAM
YAKO Director-General 21 OCTOBER 2008
2CONTENT
- 5-Year Overview Achievements and Challenges
- Annual Review Programme 1 Administration
- Annual Review Programme 2 Water Resources
Management - Annual Review Programme 3 Water Services
- Annual Review Programme 4 Forestry
3FIVE-YEAR OVERVIEW
- ACHIEVEMENTS
- FINANCIAL OVERVIEW
- CHALLENGES
4OVERVIEW OF ACHIEVEMENTS
- Water Allocation Reform
- Water Conservation and Water Demand Management
Strategy finalised and published - Water Pricing Strategy revised and implemented
- National Dam Safety Programme Management
- Water Use Authorisation Licence tracking system
deployed countrywide - Local government support
- Access to basic services
- Legislation (National Water Act Forestry Laws
Amendment Act)
5OVERVIEW OF ACHIEVEMENTS (2)
- Launch of Womens Organisation
- Improved systems for monitoring water drinking
quality (Award Won) - Development and Signing of Forest Sector BBBEE
Charter - Approval of policy to transfer indigenous forests
- Conclusion of lease agreements for State
Plantations (Amathole, MTO) - Successful greening Million Trees Project
- Tabling the State of the Forests 2007 Report
- Transfer of Knysna to SanParks
- Fire Protection Associations Regulations
published
6OVERVIEW OF ACHIEVEMENTS (3)
- Commissioning of new national infrastructure
projects such as Berg Water VRESAP and Nandoni
implemented - Dam safety rehabilitation programme implemented
to address shortcomings of all DWAF dams - Full asset verification and validation process to
the approximate value of R90 billion - Several construction projects completed
7OVERVIEW OF ACHIEVEMENTS (4)
- Construction works completed
- Mooi Mgeni Transfer Scheme Phase I
- Morgenstond-Jericho Emergency Pumpstation part of
Usutu-Vaal Scheme - Rehabilitation of Nuwejaarspruit downstream of
Sterkfontein Dam - DSRP Bulskoek
- Lower Olifantsriver balancing dam for the Water
Users Association - Bergriver Dam Access Road
- La Motte Village Services
- Berg River Supplement Scheme
8OVERVIEW OF ACHIEVEMENTS (5)
- International Relations
- Ratification of the SADC Forestry Protocol
- Conclusion of MoUs with Lesotho and Mozambique
- Nominating as a bidding country for World Water
Forum 2012 - SADC Chairmanship of Water Ministerial Committee
- Preparation to take over AMCOW
- African Sanitation Conference Ethekwini
Ministerial Declaration on Sanitation 2008
9OVERVIEW OF ACHIEVEMENTS (6)
Service Backlog in 2004/05 Achieved Achieved Achieved Achieved Total Served since 2004
Service Backlog in 2004/05 2004/05 2005/06 2006/07 2007/08 Total Served since 2004
Water 10,6 m people 1,51 m people 1 m people 1.25 m people 1,27 m people 5.03 m people
Sanitation 17,3 m people 1,3 m people 800 000 people 940 000 people 1,2 m people 4.24 m people
Bucket Eradication 252 254 units 0 62 206 units 71 747 units 95 218 units 228 991 units
Free Basic Water 14.8m people 300 000 people 2.46m people 490 000 people 4.95 m people 8,2 m people
10STRATEGIC REVIEW - MAIN
The current year
DWAF Allocation for 2008/09
Total Exchequer Allocations
R586 million
R3 238 million
R2 427 million
R446 million
Water Resource Management
Water Services
Forestry
Admin
Augmentation to WTE
R1 615 million
R320 million
Current
Capital
11EXPENDITURE TRENDS FROM 2004 - MEA
Year Actual R000 Budget R000
2003/04 4,182,087 4,639,180
2004/05 3,776,946 3,823,112
2005/06 3,717,088 3,935,636
2006/07 4,305,650 4,660,303
2007/08 5,835,461 5,862,513
12FINANCIAL OVERVIEW - MAIN
PAST Performance
Expenditure trends for the Department over the
past five years
13EXPENDITURE TRENDS FROM 2004 - WTE
Revenue and expenditure trend
Year Revenue R000 Expenditure R000
2002/03 3,273,625 3,269,023
2003/04 3,787,155 5,000,361
2004/05 3,894,734 7,379,148
2005/06 4,756,504 5,293,020
2006/07 2,403,588 3,798,230
2007/08 1,921,759 4,181,024
13
14CHALLENGES
- Water quality issues
- Water losses in the municipalities
- Impact of land reform on commercial forestry
- Financing mechanisms on forestry enterprise
development - Capacity of local government to deliver (skills,
finances) - Sustainability (e.g. ageing) of infrastructure
asset management - Project implementation of new national
infrastructure - Impact of fires on timber supply
15CHALLENGES
- Legislative
- Water Services Act Section 78 Reimbursement of
Water Boards - Forestry Act,
- National Water Act Regulatory Framework not
integrated - Institutions
- Oversight
- Establishment
- Sustainability
- Finance
- SAP Large system that requires proper
implementation and post implementation
refinements long term, user requirements - Inadequate capacity (lack of skilled resources)
- Segregation between Exchequer and Trading Entity
functions, staff issues - Extensive infrastructure assets magnitude,
spatial distribution/location Auditable asset
plans needed - Rehabilitation and refurbishment of ageing
national infrastructure
16 ANNUAL REVIEW 2007/08 PROGRAMME 1
ADMINISTRATION
17ADMINISTRATION FUNCTIONS / BRANCHES
- Corporate Services
- HR
- IT
- Communications
- Finance
- ODG
- Ministry
18ACHIEVEMENTS CORPORATE SERVICES 2007/08
Targets Achievements
HR turnaround strategy 60 elimination of backlogs in HR transaction work 200 pension withdrawal cases finalised 70 of injury on duty cases completed
HR Efficiency improvements Business map for recruitment and selection developed organisational structure validated and verified Training on performance management provided to all SMS
Learning Academy intake of 60 graduates An intake of 145 graduate trainees MoU signed with 13 Higher Learning Institutions (215 bursaries allocated to engineering, technical and scientific fields)
18 Learner interns enrolled 17 larner interns enrolled and completed experiential learning programme
19ACHIEVEMENTS CORPORATE SERVICES 2007/08
Targets Achievements
50 of policies and strategies developed Strategic framework on women empowerment and gender equality developed 50 of strategies and policies reviewed and developed
Strategic considerations DWAF staff trained on gender mainstreaming
Learning Academy intake of 60 graduates An intake of 145 graduate trainees MoU signed with 13 Higher Learning Institutions (215 bursaries allocated to engineering, technical and scientific fields)
Learnership no of interns enrolled 17 learner interns enrolled and completed experiential learning programme
20ACHIEVEMENTS CORPORATE SERVICES 2007/08
Targets Achievements
Business enabling Information Services Architecture created Business Continuity Plan for SAP, Disaster Recovery Plan for Flood Management System completed
Branding outlook improved 5 new branding interventions implemented 5 new branding interventions implemented
21ACHIEVEMENTS FINANCE 2007/08
Targets Achievements
Restructuring of Finance Branch and regional components Segregation of Main Account and Water Trading activities Finance structure indicating the segregation between the Main Account and Water Trading Entity has been approved A policy document on the linking of functions to either the Main Account or Water Trading Entity has been developed
Restructuring of Finance Branch and regional components 80 target achieved with populating finance structures The placement of key SMS members in Finance CFO, 3 CDs and 7 Directors Structures for regions have been finalised Change management meetings held in all 9 provinces Migration plan developed to link staff to either Main Account or Trading Entity
22ACHIEVEMENTS WTE 2007/08
Targets Achievements
100 of all revenue due collected and banked Project Siyanqoba launched in 2007 to assist with reduction of outstanding debtors Top 20 clients accounts reconciled
100 implementation of SAP SAP implemented
Implementation of effective supply chain management system 100 compliance Committees established in line with National Treasury practice notes
23HISTORY OF AUDIT OUTCOMES
- 2003/04 Annual Report. Adverse opinion as the
department did not comply with S40(1)(b) of the
PFMA - 2004/05. Audit report contained various items
that led to emphasis of matter - 2005/06 annual report- financial statements
prepared on accrual basis. Disclaimer as material
items did not meet the required reporting
standards.
24HISTORY OF AUDIT OUTCOMEScont
- 2006/07 Audit Report qualified opinion
- terms of the treatment of assets,
- independent checks and reconciliations and the
BAS reconciliation and an incomplete commitment
register and - an emphasis of matter in relation to compliance
with PFMA and performance monitoring - 2007/08 Audit Report qualified opinion
- mainly due to the incomplete asset register,
- treatment of the suspense account and
- the disclosure of loans and receivables.
-
25WTE SPECIFIC REORGANISATION INITIATIVES
- Background
- Trading entity was established in 1983 .
- Water Services and Working for Water was moved
from the Trading Entity to Main Account. - One consolidated Trading Account (Water Trading
Entity and Equipment Trading Entity was merged . - Turnaround financial situation from loss to
profit operation efficiency drive - Financial systems development and implementation
- SAP
26PROJECTS UNDERTAKEN - WTE
- The following are the projects implemented to
ensure an unqualified audit opinion - Khanya
- - HR turnaround project
- Sakhile
- Infrastructure verification project
- Resulted in Asset Register for Infrastructure
assets that complies with minimum requirements - Improved asset management processes
- Siyanqoba
- Approved Asset Management, Revenue Management,
and other business processes and policies - Hlanyisa
- Moveable asset register project
- Moveable asset register developed that complies
with minimum requirements - SAP super users and trainers
26
27OVERVIEW OF ANNUAL EXPENDITURE
2006/07 R000 2007/08 R000 Increase/ (Decrease)
WTE(accrual-based) 3 798 231 4 181 024 10
Main- Cash-based 4 305 650 5 385 396 25
Total 8 103 881 9 566 420 18
28 EXPENDITURE PER PROGRAMME 2007/08
Budget R000 Actual R000 spent
Administration 602 849 601 719 100
Water Resources Management 2 912 352 2 465 674 85
Water Services 1 874 007 1 866 926 100
Forestry 469 607 451 077 96
29OVERVIEW OF ANNUAL FINANCIAL STATEMENTS - MEA
2006/07 R000 2007/08 R000 Increase/Decrease
Administration 526 729 601 719 14
Water Resources Management 1 872 479 2 465 674 32
Water Services 1 454 758 1 866 926 28
Forestry 441 240 451 077 2
30REASONS FOR UNDERSPENDING - MEA
- Administration Under spending is mainly
attributed to the transfer of staff to
municipalities which could not be completed due
to protracted negotiations with receiving
municipalities and funds will be rolled over to
2007/08 financial year. Insignificant under
expenditure. - Water Resources Under spending is mainly
attributed to the De Hoop Dam Project that could
not commence as planned as a result of delays in
finalising the Environmental Impact Assessment - Water Services Under spending is mainly due to
delays in finalising transfer agreements with
local government in respect of transfer of
schemes. Insignificant under expenditure. - Forestry There was a delay in the implementation
of the BE charter. Insignificant under
expenditure
31OVERVIEW OF WTE
- Operating revenue and expenditure analysis
32OVERVIEW OF WTE
33OVERVIEW OF WTE
34 2006/07 AUDITOR-GENERAL REPORTS
Exchequer Trading Forestry Trust
Disclaimer X
Qualification X
Emphasis of matter X
Unqualified X
352007/08 AG REPORT
Exchequer Trading Forestry Trust
Disclaimer
Qualification X X
Emphasis of matter X X
Unqualified X
36KEY HIGHLIGHTS FROM AG REPORT- 2007/08
- Unsubstantiated additions to the asset register
- Unverified biological assets
- Unverified accounts receivable-WTE
- Immovable assets- scientifically valued but more
refinements required later - Non-compliance/No adherence to policies and
procedures wrt to Debtors and DoRA - Lack of staff skills- capacity
- Management monitoring and reviews of transactions
37ACTION CURRENT PROJECTS
- Sakhile Immovable asset management project
- Moveable asset management project to be
finalised in March 2009 - SAP implementation (system, training etc.)
- Accounting firm resources (capacity needs) in
regions - Siyanqoba-Revenue function reorganisation
project addressing process issues around revenue
management - WTE- Operational Efficiency Drive
- Implementation of approved Finance structures for
Regions
Clean Audit March 2009
38WTE SPECIFIC REORGANISATION INITIATIVES
- Background
- Trading entity was established in 1983 .
- Water Services and Working for Water was moved
from the Trading Entity to Main Account. - One consolidated Trading Account (Water Trading
Entity and Equipment Trading Entity was merged . - Turnaround financial situation from loss to
profit operation efficiency drive - Financial systems development and implementation
- SAP
39AUDIT OUTCOME 2007/08 (FIFTH YEAR)
39
40 ANNUAL REVIEW 2007/08 PROGRAMME 2 WATER
RESOURCES MANAGEMENT
41WATER RESOURCES MANAGEMENT BRANCHES
- Policy and Regulation
- Regions
- National Water Resources Infrastructure
42EQUITABLE AND SUSTAINABLE SUPPLY
ACHIEVEMENTS 2007/08
Targets Achievements
Approval of financial assistance to Resource Poor Farmers (RPFs) Subsidies granted to five groups of farmers (130) Regulations for financial support to RPFs approved Submission for approval for financial assistance application processed and amount to approx 100 of budget of R27m spent Subsidised tariffs billed correctly
Water Allocation Reform (WAR) Validation of registered water use completed in Mokolo, Olifants, Inkomati, Jan Diesels and Mhlatuze Verification is taking place in Jan Diesels, Mhlathuze and the Upper Vaal WMAs. A Water Allocation Plan has been developed for Mhlathuze and Frameworks for Water Allocation for Inkomati and Jan Dissels.
Water Use Authorization. Water use licenses applications evaluated and use authorized 90 Licenses Issued (2007/8)
43EQUITABLE AND SUSTAINABLE SUPPLY
ACHIEVEMENTS 2007/08
Targets Achievements
National Strategies developed to reconcile water availability and use 12 pre-feasibility and feasibility studies on reconciliation solutions completed Studies to set up water resource models for 2 catchments completed and 4 more well advanced Reconciliation strategies developed for 2 large systems, 2 more well progressed. Feasibility studies completed for Mooi-Mgeni. Transfer Scheme Phase II Spring Grove Dam and Olifant River WR development projects (De Hoop Dam) Clanwilliam Dam raising implementation completed Support given to all joint River Basins studies Support offered on all joint River Basin Studies Joint plan for Lower Orange River between RSA, Lesotho, Namibia, Botswana)
44PROTECTION POLICIES AND MEASURES
ACHIEVEMENTS 2007/08
Targets Achievements
Classification of water resources Draft position paper done and stakeholder workshop conducted for consultation Draft regulations completed
Reserve Determination concluded 25 Rapid level Reserves completed determined to facilitate ad hoc license applications A desk-top Reserve methodology for estuaries finalized Comprehensive Reserve for compulsory licensing completed and implemented in Letaba and Inkomati, Olifant Doorn and Komme/Seekole WMAs
45ACHIEVEMENTS 2007/08
NATIONAL WATER RESOURCES INFRASTRUCTURE
Targets Achievements
Berg Water Project supplement scheme completed Pumpstations, abstraction works, Irrigation release and various pipelines at 99(100) completion
De Hoop dam and Associated works Detail design 90(93) Realignment of road at 35(45) Dam construction 12(15)
Hluhluwe Regional Water Scheme Treatment plant, resevoirs pipelines 91 88
Vhembe district water treatment plant 95 93
Rehabilitation of 4 dams 4 Dams rehabilitated
46ANNUAL REVIEW 2007/08 PROGRAMME 3 WATER
SERVICES
47WATER SERVICES BRANCHES
- Policy and Regulation
- Regions
48ACHIEVEMENTS 2007/08
Basic sanitation and water services provision
Targets Achievements
100 buckets eradicated in formal settlements 80.4 (95218) of buckets eradicated Geotechnical problems caused delays in EC, Northern Cape and Freestate
100 clinics provided with access to water supply sanitation 100 clinics provided with access to water supply and adequate water supply 92 of clinics provided with adequate sanitation
300 000 households provided with basic sanitation 1.12 million people served
Access 2 water 1.27 million people served
Schools backlog eradicated with 5 69 out of 96 schools provided with water services 51 out of 86 schools provided with access to sanitation
49ACHIEVEMENTS 2007/08
- National transfers 97 of targeted schemes have
been transferred remaining 3 in final stages - Regional Bulk Infrastructure R1.4b allocated
over three years, R300m for 2007/08 - Sector Policies, Regulations, Guidelines and
Strategies - Draft National Water Services Regulation Strategy
- Revised draft Revised Water Services Bill
- Facilitation of the adoption and approval of a
joint National Water Services Sector Support
Strategy - Draft Institutional Reform Strategy
- Infrastructure Asset Management Strategy
- Draft Intergovernmental Relations Framework
- Good Practice Report on Free Basic Water, billing
systems, meter reading and tariff structures - Draft guideline for Debt Management of Water
Boards
50ACHIEVEMENTS 2007/08
- Masibambane
- Financing agreement Masibambane 3 amounting to
R68 billion signed - Masibambane 3 Water for growth and development,
integrates water services and water resources - Draft concept document for Water for growth and
development - Local government support
- Planning support development of key performance
indicator structure reports for each Water
Service Authority (WSA) as part of IDP review
process development of backlog eradication
strategies for each WSA - Technical assessment of all new Municipal
Infrastructure Grant (MIG) projects for water
supply and sanitation - Eight technical experts deployed to relevant
municipalities - A water services authority legislative handbook
been published as a tool that will be an enabler
for regulatory support and reinforcement of
regulations and compliance
51ACHIEVEMENTS 2007/08
- Provision of Basic Services
- 84 of South African population have access to
Free Basic Water - 97.6 of WSAs implementing Free Basic Water
programme - Vuna Awards
- Effective and best support to local government
Vuna Award given to DWAF by the Centre of Public
Service Innovation - 2010 FIFA World Cup
- Water sector business plan and implementation
strategy which covers adequate water and
sanitation services, public toilets and greening
in host cities, has been developed - All host cities have water safety and security
plans
52ANNUAL REVIEW 2007/08PROGRAMME 4FORESTRY
53FIVE YEAR REVIEW 2003/2004
- Policy on transfer of natural forests and state
forest land (e.g. nurseries) finaliZed - Fire Protection Association regulations gazetted
- Fire Danger Rating System notice issued
- SADC Forestry Protocol ratified by Parliament
- Criteria and Indicators (for SFM) published
piloted in various forest types and scales
542004/2005
- Conclusion of lease agreements for state
plantations (Amathole MTO) - FinaliZation of delegation of the management
control of indigenous forests to SANPARKS in the
Southern Cape and Tsitsikama areas. - Amendment of NFA and NVFFA
- Forestry incorporated into the PGDSs of both
Limpopo and E Cape Provinces - Audits of leased plantations conducted
552005/2006 i
- Forestry BBBEE Charter process launched and
Steering Committee members appointed - Charter development process launched at the
Forestry Indaba in April 2005 Steering
Committee established - During 2005/06 a draft Charter was developed
- Consultative workshops took place specific
workshops for women to ensure their participation
involvement - Signing of agreement with the Russian Federation
on Forestry (exchange of expertise and
information agreed on) - 59 Fire Protection Association registered
- Criteria and Indicators manual, checklist and
guidelines (for sustainable forest management)
produced - MoU with South African Weather Services signed to
communicate dangers of fires
562005/2006 ii
- Forest Enterprise Development
- Central to governments poverty eradication
agenda and key component of BBBEE in Forest
Sector - Initiatives include Transfer of State Forests
afforestation strategy for EC KZN and
inclusion of forestry as key sector in PGDSs - Support establishment of community projects R 2
million spent from the Community Facilitation
Fund - Access to benefits from State Forests
- Participatory Forestry Projects initiated to
promote sustainable job opportunities
socio-economic upliftment
572006/2007 i
- The Champion Trees and Protected Tree species
list approved by Minister and gazetted - Partnership with Working on Fire for the
roll-out of Firewise Campaign - Forests and woodlands symposium held in Port
Elizabeth - EC Strategic Environmental Assessment completed
for Water Management Area 12 (Mzimkhulu and
Mzimvubu Catchments) - Law enforcement policy approved in October 2006
582006/2007 ii
- Forestry BBBEE Charter
- SC approved Draft Charter and recommended the
initiation of the final stakeholder consultation - Forest Enterprise Development Livelihood
Development - Continued projects initiated during 2005/06
- Afforestation roles clarified afforestation
guidelines and development protocols produced - Continued support to community projects
- Studies conducted to identify further FED
opportunities Bee-keeping forage mapping and
the potential of essential oils in enterprise
development - National Greening Strategy
- Revised National Greening Strategy approved and
provincial local government greening strategies
drafted - Transfer of Assets
- Initiatives launched to convert plantations into
more viable forestry business packages
implement a strategy aimed at ensuring
transferred packages that will contribute to
social and economic development (MM transfer
formalized)
592007/2008
- Regulations in place for forest management
- Draft Regulations reviewed and finalized
- National list of Champion Trees revised and
updated for gazetting - Mapping of Kathu forest completed and proposal
for gazetting Kathu as protected woodland
submitted - Red Data natural forest species listed for
biodiversity protection purposes - Forest sub type classification for three forest
types completed
602007/2008
- State of Forests Report
- The 2006 State of Forestry Sector was compiled
and reported to Parliament
612007/2008
- Transformation/BBBEE Charter Targets
- Charter Steering Committee finalised text of the
Charter - Final Charter text submitted for third party
analysis - Preparations for gazetting and signing the
Charter underway - Minister appointed the Charter Council and the
Chairperson - Implementation plan finalised based on comments
received from Regions - Forest Charter Implementation Units role and
functions finalized and process to establish unit
initiated - Negotiations with the Industrial Development
Cooperation (IDC) have been initiated, regarding
the disbursement of FED funds
622007/2008
- Community development
- In Mpumalanga 2 projects are supported (i.e.
Salique Forestry land released and technical
support to communities provided) - Injaka Business development and institutional
arrangements - Gauteng Nursery cooperative initiated and in
process of registration. Project/ business plan
developed. Marula utilisation programme
initiated. - KZN Sokhulu Multipurpose Nursery Concept
document developed for the nursery - Indigenous Aloe nursery in Empangeni Task team
including the local municipality formed to
develop a project plan and help drive the project
632007/2008
- Community development
- North West Mooifontein plantation Produced a
turn around strategy with local government which
includes planting of hybrid Eucalyptus - Eastern Cape Nqabhara Establishing Community
Forestry Agreement bestowing rights and
responsibilities for management and use the
forest - Limpopo Morebeng Land Reform Project MoU in
place with LIBSA, FSA and DWAF - Vhembe and Mopani Small growers Established and
registered a cooperative - Northern Cape 2 nurseries
- Conversion of wattle jungle continued with
Ithemba Trust
642007/2008
- Transfers and land management
- Assignment of DWAFs IFM function to the
Provincial Government - KZN Transfer of Mtunzini and Sokhulu plantations
not finalized due to land reform process not
being finalized - Mpumalanga Transfer of Injaka plantation
- Limpopo Transfer of Rossbach plantation
- Compliance audits were conducted in MTO, Singisi,
SiyaQhubeka lease packages - Rentals collected from MTO, SQF, Singisi and AFC
leases - Manzengwenya and Mbazwana transfer model approved
652007/2008
- Fire governance and regulation
- A total of 34 FPAs registered in high to extreme
fire risk areas covering an area of 6 million
hectares - Three FPA registered in low to medium veldfire
risk areas - NVIS being used to capture fire incidents and
modified to allow capturing of fire incidents
outside FPA areas - Full implementation of the National Fire Danger
Rating System not achieved
662007/2008
- Management of state plantations
- Total of 16 audits on commercial plantations
completed and 3 on Indigenous forest estates - Corrective Actions Required are being taken in
plantations indigenous forest areas - Annual Plans of Operations were implemented and
management on plantations progressed as planned - Updated the growing stock management plans and
stock maps - Updated 41 maps for Category B Commercial
plantations and 38 Category C plantations - Total area planted in this year is 4849 ha,
constitute 30 of the unplanted area - Fire protection plans were developed and refined
- A total of 105 fires damaged or destroyed 2373 ha
of planted area, constituting 4 of the planted
estate
672007/2008
- Greening and community development
- 501 000 Fruit trees planted
- 145 000 Ornamental indigenous species planted
- Only Gauteng and Mpumalanga has reached the
provincial targets - 2010 World Cup interventions
- DWAF plan in place including water and forestry
- DWAF greening plan amalgamated and aligned to
DEAT GREEN plan - Plan communicated to host cities
682007/2008
- Greening and community development
- Local government has developed and aligned
greening plans (all Metros, Rustenburg, Midvaal,
and Ngaka Modiri Molema district municipality) - Million Trees Programmed (Other initiatives)
- Draft MoUs negotiated with DALA in Mpumalanga,
GDACE and Department of Health in Gauteng - Joint greening project with Department of
Agriculture in the Western Cape at Villiersdorp. - Developing an integrated Clean and Green
Programme with Ethekwini Metro - In the Regions 105 Arbor week events were
organised and successfully executed - In total 22 Eduplant events were supported
- Mpumalanga hosted the Arbor City Award program
this year and Mkhondo local municipality was
awarded the title
69Challenges
- Impact of land claims on commercial forestry
- Governance (transfer of indigenous forests to
other state institutions) - Negative impact of fires on timber supply
- Financing mechanisms for forestry enterprise
development - Post settlement support
70