3Company Overview
- THIS SLIDE AND THE NEXT SHOULD PRESENT RATHER
GENERAL, HIGH LEVEL INFORMATION - IT SHOULD NOT BE PERCEIVED AS A MARKETING PITCH
- THIS IS A BIG HOT BUTTON FOR THE LAB
4Company Overview (Contd)
- Quantitative and Strategic Analysis
- Operations Research
- Statistical Analysis
- Business Process Reengineering
- Cost/Benefit Analysis
- Functional Economic Analysis
- Information Technology
- Systems Analysis and Design
- Software Development
- Database Management
Modeling and Simulation
- Process Modeling
- Analytical Decision
- Support Tools
- Logistics Simulations
5Technical Approach Problem Identification
- No near real time, secure, web-enabled means for
data exchange and display - Need to obtain visibility of status of space
system assets for accurate decision making and
reporting - Need to capture logistics and operations
processes, policies, and systems as they evolve - Need an architectural solution to support EAF,
cross-functional C2 objectives - Scaleable
- Interoperable
6Technical Approach Users/Customers
- HQ AFSPC/LGZ/LGX/LGM/LGS/SC
- 14 AF/LG
- Det 11SSMs
- SMC/AX
- OO-ALC/LH
- HQ AFMC/DR
7Technical Approach Goals/Objectives
- Improved visibility of operational and logistical
status through advanced information composition - Architecture to support near and long-term
solutions - Legacy and evolving systems
- AF Logistics/C2 requirements (current and future)
8Technical ApproachTechnical Challenges
- Access to data systems, interfaces and databases
- Access to key system users (experts)
9Technical Approach to Solution
- Iterative, spiral development techniques used
- Develop CONOPS (high level)
- Depict VSLRC functional, system and reporting
requirements - Data system and process analysis
- Questionnaires used for in-depth focus
- Interviews with SMEs
- Det 11 interviews
- Identify holes/buckets
- Will work with UDRI on recommendations
- Technological infrastructure overview
- Size,scale and scope of operations
10Technical Approach to Solution (Contd)
- Develop CONOPS (Contd)
- ROI Analysis
- Jointly define metrics and cost elements
- Describe non-tangible benefits of VSLRC
- Identify strengths, weaknesses, risks
- Validate with AFSPC
- Balanced Scorecard Approach (BCA)
- Identify applicability to requirements
- Identify performance measurements/mgmt objectives
- Recommendations for incorporation into VSLRC
11Technical Approach to Solution (Contd)
- Functional requirements managed with Rational
Requisite Pro - Requirements Traceability Matrix (RTM)
- Use Cases
- Map within documentation requirements
12Technical Approach to Solution (Contd)
- Requirements Traceability Matrix
13Technical Approach to Solution (Contd)
14Technical Approach to Solution (Contd)
- Documented Requirements and Mapping
15Technical Approach to Solution (Contd)
- Conceptual Demonstration
- Slide presentation (only) to avoid resource drain
- Data representation
- Functional requirements representation
- Maximize efficiencies
- Cross functional
- IT architecture/recommendation
- Consistent and interoperable w/AF and DOD
standards
16Technical Approach Major Milestones
- Functional Requirements Identification
- Technological Alternatives
- Return on Investment (ROI)
- Final Program Review
- Conceptual Demonstration
- Final Technical Report
17Technical ApproachProgress Measurement
- MS Project detailed baseline schedule
- Program Reviews
- Monthly Status Reports (MSRs)
- Funds and Man-Hour Expenditure Report
- Internal contract progress/status reviews by
Corporate Leads
18Technical Approach Exit Criteria
- Requirements Traceability Matrix (RTM)
- Baseline Cost of Work Performed (BCWP)
- Conceptual Demonstration
19Planned Travel
- DC to Dayton KickOff Mtng
- DC to LA Data Collection
- Dayton to LA Data Collection
- DC to OO-ALC Site Survey
- Dayton to CO Data Collection and Progress
Review - DC to CO (2 trips) Data Collection and Progress
Review - Further travel requirements will be performed
within contract cost/funding provided
20Risks
- Management
- Cost
- Schedule
- Technical
- Data Access Requirements
- Access to personnel (SMEs) for interviews
- Risk Abatement Strategy
- Leverage off of already existing studies/reports
- Use management tools to monitor progress
- Report any shortfalls in receiving access to data
required to AFRL/HESS and associated impact to
effort
21Major Unresolved Issues
22Potential Benefits/Payoffs
- First iteration in depicting VSLRC rqmnts
(CONOPs) - Data system reduction
- Advanced technological infrastructure
- Improve Supply Chain Management (SCM) and LRC
objectives - Performance Management/ Measurement goals
identified and implemented - Conceptual demonstration of possibilities
- Return On Investment (ROI)
- Sound business case for marketing of VSLRC
concept to senior leadership
23Programmatics Schedule
24Programmatics Man-Hours and Types
- Type Hours
- Project Mgr 19
- Sr. Analyst Manager I 879
- Sr. Analyst Manager II 304
- 1,202
25ProgrammaticsDeliverables
- Type Due Date
- Monthly Status Report 15th day of each month
- Funds and Man-Hour Rpt 15th day of each month
- Presentation Material As Required
- Technical Report (Draft) 7.5 MAC (Apr 03)
- Technical Report (Final) 9.5 MAC (Jun 03)
- All deliverables will be presented in contractor
format