OPERATIONAL RISK MANAGEMENT - PowerPoint PPT Presentation

1 / 34
About This Presentation
Title:

OPERATIONAL RISK MANAGEMENT

Description:

What this means is we want to optimize the NJROTC experience by instilling a sense of citizenship, respect, ... – PowerPoint PPT presentation

Number of Views:1498
Avg rating:3.0/5.0
Slides: 35
Provided by: cod53
Category:

less

Transcript and Presenter's Notes

Title: OPERATIONAL RISK MANAGEMENT


1
OPERATIONAL RISK MANAGEMENT
2
(No Transcript)
3
Why have ORM for NJROTC?
  • Summer Camp
  • Drill
  • PRT
  • NJROTC picnic
  • Orientation trip
  • AMI
  • Sword Teams

4
What well cover today
5-Step ORM Process Causes of Risk 4 ORM
Principles 3 Levels of ORM Risk Assessment
Matrix
5
Operational Risk Management
  • ORM is the process of dealing with risk
    associated with NJROTC Unit operations, which
    includes risk assessment, risk decision making,
    and implementation of effective risk controls.

6
ORM
  • A Decision Making Tool
  • Should we do this or not?
  • Increases Ability to Make
  • Informed Decisions
  • Reduces Risks to Acceptable
  • Levels

7
ORM Goal
  • The goal of ORM is to optimize operational
    capability and readiness by managing risk to
    accomplish the mission with minimal loss.

8
ORM Terms
9
ORM Terms
Hazard A condition with the potential to cause
personal injury or death, property damage, or
mission degradation.
10
ORM Terms
  • Risk
  • An expression of possible loss in terms of
    severity and probability.

11
ORM Terms
Severity
The worst credible
consequence which can occur as a result of a
hazard.
12
ORM Terms
Probability The likelihood
that a hazard will result in a mishap or loss.
13
Physical Training Example
Hazard
Risk
Bad Weather
Slipping on track
Chance of muscle strain
Improper Stretching Before Exercise
Chance of knee injury
Running on Hard Pavement
14
ORM Terms
Control A method for reducing risk for an
identified hazard by lowering the probability of
occurrence, decreasing potential severity, or
both.
15
ORM Terms
  • Risk Assessment
  • The process of detecting hazards and assessing
    associated risks.

16
ORM Process
1. Identify Hazards
2. Assess Hazards
3. Make Risk Decisions
4. Implement Controls
5. Supervise
17
Causes of Risk
  • Change - The Mother of Risk
  • Resource Constraints
  • New Technology
  • Complexity
  • Stress

TEENAGERS!!!!
18
Causes of Risk
  • Societal Constraints
  • Environmental Influences
  • Human Nature
  • Speed/Tempo of Operation
  • High Energy Levels

19
Four ORM Principles
  • 1. Accept risk only when the benefits outweigh
    the probable costs.
  • 2. Accept no unnecessary risk.
  • 3. Anticipate and manage risk by planning.
  • 4. Empower and train subordinates to make risk
    decisions at the right level.

20
ORM Levels of Application
1. Time-critical - On the run
consideration of the 5 Steps 2. Deliberate -
Application of the complete 5-Step
Process 3. In-depth - Complete 5-Step
Process with Detailed Analysis
f
21
Risk Assessment Matrix
  • When conducting a risk assessment, you must
    factor in the severity of the hazard, the
    probability of occurrence, and assign a risk
    assessment code to determine the risk level.

22
Risk Assessment Matrix
  • Severity
  • Category I (Critical)
  • Hazard may cause death, loss of facility/asset
    or result in grave damage to national interests.

23
Risk Assessment Matrix
  • Severity
  • Category II (Serious)
  • Hazard may cause severe injury, illness,
    property damage, damage to national or service
    interests or degradation to efficient use of
    assets.

24
Risk Assessment Matrix
  • Severity
  • Category III (Moderate)
  • Hazard may cause minor injury, illness, minor
    property damage, minor damage to national,
    service or command interests or minor degradation
    to efficient use of assets.

25
Risk Assessment Matrix
  • Severity
  • Category IV (Minor)
  • Hazard presents a minimal threat to personnel
    safety or health, property, national, service or
    command interests or efficient use of assets.

26
Risk Assessment Matrix
  • Probability
  • Sub Category A
  • Likely to occur immediately or within a short
    period of time. Expected to occur frequently to
    an individual item or person or continuously to a
    group.

27
Risk Assessment Matrix
  • Probability
  • Sub Category B
  • Probably will occur in time. Expected to occur
    several times to an individual item or person or
    frequently to a group.

28
Risk Assessment Matrix
  • Probability
  • Sub Category C
  • May occur in time. Can reasonably be expected
    to occur some time to an individual or several
    times to a group.

29
Risk Assessment Matrix
  • Probability
  • Sub Category D
  • Unlikely to occur.

30
Risk Assessment Matrix
  • Risk Assessment Code (RAC)
  • The RAC is an expression of risk which combines
    hazard severity and mishap probability. Using
    the matrix, the RAC is expressed as a single
    number that can be used to help determine hazard
    abatement priorities.

31
Risk Assessment Matrix
PROBABILITY OF OCCURENCE
Likely Probably May
Unlikely
A B C
D
S E V E R I T Y
Critical
1
1
2
3
Serious
1
2
3
4
Moderate
2
3
4
5
3
4
5
5
Minor
32
ORM vs. Non-standard Approach
Systematic Random, Individual-Dependent
Proactive Reactive
Safety As After-thought Once Plan is Done
Integrates All Types of Risk Into Plan
Common Non-standard Process Terms
Conscious Decision Can Do Regardless of
Risk Based on Risk Benefit
33
The Benefits of ORM
gt Reduction in Mishaps
gt Improved Mission Effectiveness
34
Questions??
Write a Comment
User Comments (0)
About PowerShow.com