Unprecedented Workload Increase
FY10 15.9B
Nov 06 Projected Workload
MILCON (DOD)
Programs Since 2004 - ARRA - OCO - GoJ Guam
- USMC Guam - USMC GTF - IVAN/ KATRINA
MPN/RPN
FY08 13.8B
ARRA
KATRINA
MC GUAM
GOJ GUAM
MC GTF
ERN
BRAC
OCO
MILCON (MC)
IVAN
BILLIONS
MILCON (NAVY)
NAVY OTH
DOD OTH
NWCF
BOS/SRM
FY
3
4MIDLANT Business Volume
Workload -- Operations FY09 FY10 FY11
- Capital Improvements
- Work-In-Place (WIP)
1.050B 1.279B 1.608B - Design-In-Place (DIP)
1.612B 1.558B 1.341B - Public Works
- Facilities-In-Place (FIP) 175.2M
182.4M 180.2M - Facilities Sustainment 104.1M
122.1M 124.4M - Utilities 354.4M 371.9M 378.9M
- BSVE 92.7M 97.0M 99.6M
- Environmental
- Environmental Services (In-House) 12.3M
10.2M 10.1M - Compliance (Salary s excluded) 5.1M
5.4M 5.9M - ERN 59.2M 56.6M 57.7M
- BRAC 12.1M 16.2M 13.0M
- Asset Management
- Real Estate-In-Place (RIP) 13.5M 15.0M
15.5M
5NAVFAC MIDLANT Area Of Responsibility
NORTHEAST IPT Staff
1,196 Business (FY10) 494M
MCRCs 48 Locations
NOSCs 40 Locations
NSU Saratoga Springs, NY
HAMPTON ROADS IPT Staff
1,646 Business (FY10) 1,074M
NSY Portsmouth Kittery, ME
PWD Maine
PWD Newport
NS Newport, RI
JRB Willow Grove, PA
NSA Mechanicsburg, PA
SUBASE New London, CT
PWD New London
NSA Philly
PNBC Annex (Navy Yard)
PWD Earle
NWS Earle, NJ
NAES Lakehurst, NJ
PWD PA
Wallops Island
Sugar Grove, WV
PWD Norfolk
Norfolk Naval Base, VA
NORTH CAROLINA IPT Staff 178
Business (FY10) 1,529M
Cheatham Annex
PWD NSA
NSA Norfolk, VA
NWS Yorktown, VA
Fort Story NAB Little Creek, VA
PWD Yorktown
PWD Little Creek
NAS Oceana, VA
PWD Oceana
Dam Neck Annex
PWD Portsmouth
NNSY Portsmouth , VA
Camp Lejeune, NC
ROICC Cherry Point
MCAS Cherry Point, NC
OICC Camp Lejeune
6NAVFAC Execution Goals
- Drive toward Sustainable Infrastructure
Renewable Energy! - Push beyond LEED Silver
- Implement Low Impact Development (LID)
- Early Contract Involvement (USACE call it
Integrated Design-Bid-Build) - Determining pilot project for HR
- Benefits of DB and DBB for technically complex
projects - Zero safety mishaps
- Proactive involvement
- Accountability
- Turnkey approach with FFE
- Meet DOD Small Business Goals and Push 75 of
Requirements to Design-Build
7MIDLANT Public Works Energy Program
- Navy Energy Saving Contracting Opportunities
- Energy Conservation Investment Program (ECIP)
- Part of MILCON program, projects btwn 300K - 4M
- Must be renewable (solar, wind, etc)
- Financed Energy Projects (Projects must pay for
themselves from savings) - Energy Saving Performance Contracts (ESPC)
- Contracts with Energy Service Companies (ESCOs)
- Guaranteed savings, usually include OM
throughout repayment term - Utility Energy Savings Contracts (UESC)
- Utility sponsored programs
- Quicker to implement than ESPC, typically
smaller in scope - Navy energy website https//energy.navy.mil
- POC Arnold Agustin, (757) 341-1205
8FY12/13 Energy Special Project Program
- Program Amounts
- 295M planned for FY12
- 312M planned for FY13
- Scope considerations
- Financial benefits (Include current work around
costs, current repair costs and future
replacement costs) - Energy savings /MBTU
- Include new retro and/or re-commissioning
projects - Incorporate energy audit projects into program
submission - Include roof and HVAC replacements
- Focus on building envelope projects
- Criteria weighting
- financial benefits (39)
- shore consumption reduction (9)
- reliable energy for critical infrastructure
(26) - regulatory compliance/stakeholder expectations
(13) and - development of enabling infrastructure (13)
9USMC Guidance on Roof/Solar
- Projects with complete roof replacements will
incorporate roof-top solar thermal and/or
photovoltaic systems - Reflective roof products shall be used in
combination unless cost prohibitive or not
technically feasible - Vegetative roofing systems considered on a
case-by-case basis - Ground mounted PV systems considered with limited
roof area and/or improper orientation
10Sustainable Systems Integration ModelExample
JEB LC-FS Mandated Reductions
22,320 MTCo2eq/Yr 4,500 cars off the road
34
26
30
59 MGY Nearly 1/3rd Olympic Swimming Pool/day
38 GWhr/Yr Power for 900 homes
Area 2212 acres GFA 4.4 M sf Facilities 404
Buildings Population 12,464
11Capital Improvement Highlights MILCON BRAC
Hampton Roads 305M FY08-11
- Virginia - Hampton Roads
- Special Operations Command 1 Projects 19M
- MCON - 20 Projects 263M
- NATO 1 Project 3M
- Specials, Demo, Energy 9 Projects 20M
- POC CAPT(s) Eric Aaby, Patrick McCormack, 757-
341-1501/1502
12MILCON Program Highlights
- MIDLANT Hampton Roads
- Approximately 282M
- Design Level
- 23 DB (3 projects)
- 77 DBB (10 projects)
- Acquisition
- 38 Stand Alone (5 projects)
- 23 Admin/General/Industrial MACC (3 projects)
- 38 8A MAC (5 projects)
- Program Allocation
- NAVSTA Norfolk (7 projects)
- NAS Oceana (1 projects)
- NAVPHIBASE Little Creek (2 projects)
- Naval Weapons Station (NWS) Yorktown (2 projects)
- NSA Norfolk (1 projects)
13Hampton Roads HighlightsFY11
P-835 Replace Fuel Pier, NAVSTA Norfolk
P835 Replace Fuel Pier, NAVSTA Norfolk (58M) P8
28 Piers 9 10 Upgrade, NAVSTA Norfolk
(2.4M) P862 Pier 1 Upgrades, NAVSTA Norfolk
(10M) P743 Ordnance Cargo Logistics Trng,
MWS Yorktown (21.4M)
14MILCON Construction Acquisition Tools
Milestones
P No. Project Name Activity Project Dollar Amount Design Level Acquisition Method Acquisition Tool Issue IFB/RFP Current Projected Award Date
Q773 SOF SUPPORT ACTIVITY (SUPPACT) OPERATIONS FACILITY N61414 NAVPHIBASE LITTLE CREEK VA 18,669,000 Design Build RFP - BVSS (One Step) MAC - General 7/6/10 11/16/10
838 E-2D FACILITIES UPGRADE N62688 NAVSTA NORFOLK VA 6,402,000 Design Bid Build RFP - LP MAC - General 8/27/10 12/17/10
743 NAVY ORD CARGO LOGISTICS TRAINING COMPLEX N69212 NAVAL WEAPONS STATION YORKTOWN 21,346,000 Design Build RFP - BVSS (One Step) MAC - General 9/22/10 2/25/11
879 NORFOLK HARBOR CHANNEL DREDGING N62688 NAVSTA NORFOLK VA 42,830,000 Design Bid Build IFB/ICB Stand Alone Construction Contract 12/8/10 2/28/11
101 ROAD IMPROVEMENTS CAMP ALLEN AREA N57095 NAVSUPPACT NORFOLK VA 1,700,000 Design Bid Build RFP - LP MAC - 8A 6/24/10 2/28/11
516A SHIP REPAIR PIER REPLACEMENT INC 2 OF 3 N62688 NAVSTA NORFOLK VA 100,000,000 Design Bid Build RFP - BVSS (One Step) Stand Alone Construction Contract 5/27/10 3/31/10
828 DDG 1000 UPGRADES TO PIERS 9 AND 10 UPGRADE N62688 NAVSTA NORFOLK VA 2,400,000 Design Bid Build RFP - BVSS (Two Step) MAC - 8A 1/24/11 5/4/11
15MILCON Construction Acquisition Tools
Milestones
P No. Project Name Activity Project Dollar Amount Design Level Acquisition Method Acquisition Tool Issue IFB/RFP Current Projected Award Date
202 RIVERINE SQUADRON THREE BOAT STORAGE BUILDING N69212 NAVAL WEAPONS STATION YORKTOWN 1,920,000 Design Bid Build RFP - BVSS (One Step) MAC - 8A DB 3/1/11 5/19/11
132 SOF CAFETERIA N60191 NAS OCEANA VA 14,170,000 Design Build RFP - BVSS (Two Step) MAC - 8A DB 2/3/11 7/8/11
835 REPLACE FUEL PIER N62688 NAVSTA NORFOLK VA 58,000,000 Design Bid Build RFP - BVSS (One Step) Stand Alone Construction Contract 11/9/10 7/11/11
600 HOST NATION INFRASTRUCTURE NC1002 Z/VARLOCS 2,700,000 Design Bid Build RFP - BVSS (One Step) Stand Alone Construction Contract 7/10/09 9/30/11
862 PIER 1 UPGRADES TO BERTH USNS COMFORT N62688 NAVSTA NORFOLK VA 10,035,000 Design Bid Build RFP - BVSS (One Step) Stand Alone Construction Contract 4/22/11 10/25/11
201 RIVERINE SQUADRON TWO BOAT VEHICLE MAINTENANCE FACILITY N61414 NAVPHIBASE LITTLE CREEK VA 1,890,000 Design Bid Build - - 4/4/11 6/15/11
TOTAL 282,062,000 TOTAL 282,062,000 TOTAL 282,062,000 TOTAL 282,062,000
16FY12 MILCON Program Highlights
- MIDLANT (Hampton Roads) POM12 OSD Submit
(tentative until Congress Authorizes and
Appropriates) - Approximately 366M
- 67 DB (4 projects)
- 33 DBB (2 projects)
- Program Allocation
- NS Norfolk (2)
- NAB Little Creek (2)
- NNSY (1)
- NAS Oceana (1)
17MIDLANT Summary
- Robust construction programs continuing
- Energy program increasing
- Sustainable Behavior - LEED/LID Emphasis
- Focus on safety, quality speed
- Contract Acquisition Strategies
- Mostly full and open MACC applicability
reviewed - Small Business applicability reviewed for all
acquisitions - Use of Design/Build vs Design/Bid/Build where
appropriate - Interest in energy enhancements and other
betterments - Stakeholders jointly find Quality, Best-value
solutions
18Questions
19Back-Up SlidesHampton Roads IPT
20MIDLANT Summary
- Solicitation Award Venues
- FEDBIZOPs address www.fbo.gov
- NECOs (Navy Electronic Commerce Online) address
www.neco.navy.mil - NAVFAC Portal under Business Opportunities
address www.navfac.navy.mil - POC Acquisition Office, 757- 341 - 0098
21NAVFAC MIDLANT Organization
- Field Offices
- Public Works Departments 11 Installations
- Officer in Charge of Construction Camp Lejeune,
NC - Resident Officer in Charge of Construction
Cherry Point, NC - Integrated Product Teams
- Hampton Roads VA, WV
- North Carolina NC
- Northeast PA, NJ, CT, RI, ME, NY, NH, VT, MA,
MD, DE - Business/Support Lines
- Capital Improvement
- Public Works
- Environmental
- Asset Management
- Contingency Engineering
- Acquisition, Financial Management, CIO, Counsel
22Design/Acquisition Planning
- Strategic Program Guidelines
- Design Strategy
- Determine in-house capacity for RFP/design
development - Construction Acquisition Strategy general
guidelines - gt30M Stand Alone Full and Open
- lt30M Consideration for MACC applicability
- Small Business set-aside consideration given to
all acquisitions, but generally applies to
projects lt15M - Planning becomes more tactical when the program
is authorized - Variation from Design-Build when upfront design
required due to - Project complexity/Specific Design control
Required - Client desires
- Permitting requirements
- Need for IH design experience
- Variations in Acquisition Strategy include
- Small Business goals and available capability
- MACC capacity and scope applicability
- Use Stand Alone where MACCs do not offer
specialization (Piers/Airfields) - Project packaging due to proximity of projects
- Timing of multiple solicitations
23Typical Acquisition Approach
- Full and Open Competition
- Full and Open Set-Aside for Small Business
- Multiple Award Construction Contracts (As many as
6 contractors selected) - Small Business set-aside within MACC
- Full and Open within MACC
- Indefinite Delivery Indefinite Quantity AE
Contracts - Follow-on Task Orders are negotiated
- Indefinite Delivery Indefinite Quantity
Construction Contracts - Paving, Fencing, Roofing, Painting, Utility
Distribution - Facility Support Service Contracts
- Vehicle Rental, Maintenance, Custodial, Grounds,
etc.
24Hampton Roads HighlightsFY10
852175 Replace Minimart-Gas Station, NAVSTA
Norfolk
852175 Replace Minimart-Gas Station, NAVSTA,
Norfolk (3.3M) P838 E-2D Facility Upgrades,
NAVSTA Norfolk (6.4M) Q773 SOF Support
Activities Operations, Little Creek (19M) 852176
Replace Minimart-Gas Station, Little
Creek (5.2M) P132 SOF Cafeteria,
Oceana (14M)
25Special Projects Demolition Acquisition Tools
Milestones
Client Project Number Project Name Activity Project Dollar Amount Design Level Acquisition Method Acquisition Tool Issue IFB/RFP Current Projected Award Date
RM09-0389 SP- REPAIR LOWER BASE FLOOD GATES. N00129 NAVSUBASE NEW LONDON CT 1,200,000 Design Bid Build Sole Source MAC - Admin 9/6/10 12/31/10
RM09-0623 DD-2 RPL STOP LOGS WITH MOTORIZED SLUICE GATES N32443 NSA NORFOLK NAVY SHIPYARD 2,948,000 Design Bid Build RFP - BVSS (One Step) - 12/21/10 3/17/11
RM09-0648 DRYDOCK 2 - REPAIR CAISSON 2 N32443 NSA NORFOLK NAVY SHIPYARD 4,696,000 Design Bid Build RFP - BVSS (One Step) - 3/17/11 7/8/11
DE375-08 DEMO ST.J. BLDGS 13 46 N32443 NSA NORFOLK NAVY SHIPYARD 923,000 Design Bid Build Sole Source Stand Alone Construction Contract 6/23/10 12/31/10
DE187-08 DEMO SJCA BLDGS (39, 41, 90 M-4) N32443 NSA NORFOLK NAVY SHIPYARD 1,064,000 Design Bid Build Sole Source Stand Alone Construction Contract 6/23/10 12/31/10
DE134-07 DEMO VARIOUS FACILITIES, BLDGS 117,118,178,703,238,1511 M-23 N32443 NSA NORFOLK NAVY SHIPYARD 1,109,000 Design Bid Build Sole Source Stand Alone Construction Contract 8/3/10 12/31/10
DE10-8888 A128 DEMOLITION N62688 NAVSTA NORFOLK VA 6,432,640 Design Bid Build - - 5/23/11 7/12/11
TOTAL 18,372,640 TOTAL 18,372,640 TOTAL 18,372,640 TOTAL 18,372,640
26Energy Projects Acquisition Tools Milestones
Project No. Project Name Activity Project Dollar Amount Project Type Design Level Issue IFB/RFP Current Projected Award Date
P1030 Solar Ventilation Preheat JEB Little Creek/Ft. Story 774,000 ECIP FY11 FY11
P1201 GSHP and Solar Wall NAS Norfolk 1,253,000 ECIP FY11 FY11
TOTAL 2,027,000 TOTAL 2,027,000 TOTAL 2,027,000 TOTAL 2,027,000
27MIDLANT Environmental Restoration
- Large Environmental Restoration Contracts
- CLEAN (Comprehensive Long-term Environmental
Action, Navy) - 2 contracts (CH2M Hill and TetraTech NUS)
awarded in FY 08 by NAVFAC Atlantic. Current
option expires MAY 2012 1 option year
remaining. - COR Lee Anne Rapp, (757) 322-4814
- RAC (Removal Action Contract)
- 2 contracts AGVIQ (small business) and Shaw
Environmental (large business) awarded in FY 08
by NAVFAC Atlantic. Current option expires MAY
2012 1 option year remaining. - COR Zane Perry, (757) 322-4777
- Upcoming Removal Actions ( 1M) that will use
above contracts - ABL, WV- Sites 1, 5, 10, SWMU 27 Portsmouth NSYD,
NH DRMO - Calverton, NY Site 6a Cutler, ME Site 2
- Bedford, MA Site 4 St Juliens Creek, Va
Site 21 - Camp Lejeune, NC Site 73 Naval Station
Norfolk Site 18 - Mechanicsburg, PA Storm Ditch Camp Lejeune, NC
Site 35
POC Nina Johnson (757) 341-2015
28MIDLANT Environmental Contracts Under
Development
Contract Type Scope Location of Work Contract Capacity/ Duration Type Projected IFB/RFP Projected Award Date
Restoration Services EMAC remediation system operation, removal actions Hampton Roads 80M/ 5 yrs Small Business Sources Sought Jan10 Nov 10
TOTAL TOTAL TOTAL 80 M
- POCs
- Sean Heaney - (757) 341-0370 (Compliance)
- Bob Schirmer (757) 341-0392 (Restoration)
- Dave Noble (757) 341-0490 (NEPA)
29Asset Management (Planning)
- Products and Services
- Shore Infrastructure Plans (SIP), special
studies, and project development - Regional Integration Plans, Regional Shore
Infrastructure Plans, Installation Master Plans,
Special Studies - Anti-Terrorism Traffic/parking Installation
Appearance Plans (IAP) - Project development (1391s), Business Case
Analysis, COAs and siting studies - Base-wide Asset Evaluations (AE) and Basic
Facilities Requirements (BFR) with Facility
Planning Document (FPD) update and Planning
Actions - Encroachment Studies
- Assessments of encroachment threats to
military bases, ranges and military air training
routes Encroachment Action Plans (EAP) - AICUZ/RAICUZ
- May lead to Encroachment Partnering
- Contracts
- Continue to use 2 ongoing local 5- year 5 - 10 M
IDIQ Planning contracts, held by LANT)
30 MIDLANT Asset Management (PPV)
- Public Private Ventures (PPV)
- Navy leverages private developer expertise
debt placement - Construction, renovations, asset and property
management for military families and
unaccompanied (bachelor) service members - DoNs private partners own and operate the
inventory and contract for all services,
including design/build. For design/construction
opportunities, must contact private partners. - Refer to OSD PPV website for existing project
info www.acq.osd.mil/housing - Ongoing Housing PPV projects
- Mid-Atlantic, Lincoln Property Company, 5,857
homes - Hampton Roads Bachelor Housing, Hunt/ACC, 3,682
beds - Northeast, Balfour Beatty, 3,121 homes
- Camp Lejeune/Cherry Point, Actus Lend Lease,
8,059 homes - Mid-Atlantic San Diego, Location DC, MD, Lincoln
Property Company, 259 homes - Mid-Atlantic Phase III/Camp Lejeune Phase IV,
Lincoln Property Company, 200 homes - Future Housing PPV projects
- Mid-Atlantic Phase IV/Camp Lejeune Phase V,
Lincoln Property Company 4Q FY10 - Camp Lejeune Phase VI 2Q FY11
- POC Dawn Baronner, (757) 322 - 4139
31Asset Management (Planning)
PWD Desired Engr/Planning Studies/Hiring Desired Start
PWD New London Small Craft Boat Basin Concept Study 1Q FY11
PWD Norfolk NS Norfolk Traffic and Parking Study 1Q FY11
PWD NSA Norfolk Roof Study - LRA 2Q FY11
PWD Maine Master Plan for the USS Constitution 2Q FY11
PWD NSA Norfolk Multi-Purpose Trail Study 4Q FY11
PWD Pennsylvania Space Consolidation Analysis 3Q FY11
32 MIDLANT Asset Management (Real Estate)
- Enhanced Use Leasing (EUL)
- Navy leverages private developer expertise debt
placement - Construction, repair, improvements and
maintenance in exchange for entitlements to Navy
Real Estate - Navy EUL Web Site for current status
www.navyeul.com - Multiple sites now under Phase I development.
Additional sites are under consideration for
future opportunities. - 2 sites in Phase II process
- Active Procurements
- SUBASE New London, CT 43,500 SF parcel of land
- SUBASE New London, CT SE Corner Retail, 4 acres
- NAVSTA Norfolk, Norfolk, VA South Depot Annex,
12 acres - Upcoming RFQs
- NAB Little Creek, VA Approx 8 Acre parcel of
land - POC Mitch Cooperman, (757) 341-0222
33Hampton Roads IPT MACCs
- Hampton Roads area Current Term Expires
-
- Hampton Roads 8(a) Design/Build MAC AUG 11
- Chesapeake Contractors JV, LLC
- Bay Electronic Company, Inc.
- Arriba Corporation
- York River Electric
- THR Enterprises, Inc.
34Hampton Roads IPT MACCs
- Hampton Roads area Current Term Expires
- Hampton Roads General MAC DEC 11 2 Options
- Hourigan Construction Corp.
- Centennial Contractors Enterprises, Inc.
- M. A. Mortenson Company
- Archer Western Contractors, LTD
- Sauer Incorporated dba Sauer Southwest
- Tesoro Corporation
- Virtexco Corporation
- W. M. Jordan Company, Inc.
35Hampton Roads IPT MACCs
- Mid-Atlantic area Current Term Expires
- MIDLANT Hangar/Industrial JUN 11 1 Options
- Vanguard Contractors
- M. A. Mortenson
- American Bridge Co
- Hourigan Construction
- Coakley Williams Construction
- MIDLANT Administrative Design/Build MAC SEP
11 2 Options - John C. Grimberg Co.
- The Haskell Company
- M. A. Mortenson
- Archer Western
- Hourigan Construction Corp
36Hampton Roads IPT A/E Contracts
- Current Term Expires
- Personnel Support Administrative Facilities
Virginia SEP 11 - HR, Virginia Area and Part of North Carolina
- Cederquist, Rodriquez, Ripley, PC
- BDA Rodriquez, Ripley, Maddux, Motley
- Civil Design Engineering Services MAY 11
- MIDLANT AOR
- R. Kenneth Weeks Engineers
- Repairs and Alterations to Petroleum
Storage MAR 11 - MIDLANT AOR
- Austin Brockenbrough Associates, LLP
37Hampton Roads IPT A/E Contracts
- Current Term Expires
- Structural/Waterfront Design and Engineering
Services NOV 10 2 Options - HR, Virginia Area and Part of North Carolina
- DBA - NRW Engineering, PC K. Roomsburg
- Architectural Design Engineering Services OCT
11 2 Options - HR, Virginia Area and Part of North Carolina
- HBA HA Joint Venture
- Civil/Structural/Waterfront Services SEP 11
2 Options - MIDLANT AOR
- Transystems Corp
- Architectural Design Engineering Services MAR
11 - MIDLANT AOR
- HBA Architecture Interior Design, Inc
- Architectural Design Engineering
Services APR 11 3 Options - HR, Virginia Area and Part of North Carolina
38Hampton Roads IPT Construction IDIQs
- Hampton Roads area Current Term Expires
- Painting and Vinyl Coating Wall Covering MAR 11
- Taylor Enterprises
- Hampton Roads Roofing MAR 11 1 option
- Construction Cabling Specialists, Inc
39Hampton Roads Facility Support Contracts
- Contracts are Performance Based SBA Programs
are utilized wherever possible - Pending Solicitations Issue RFP Award
- Annual Tank and POL Lines Services DEC 10
APR 11 - Maintenance of Direct Digital NOV 10 MAR 11
- Annual Diving Services NOV 10 FEB 11
- Regional Custodial MAY 11 SEP 11
-
40MIDLANT A/E Contracts
- Current Term Expires
- Personnel Support, Administrative Training
Facilities SEP 11 1 Option - MIDLANT AOR
- Civil Design Engineering Services MAY 11
- MIDLANT AOR
- Architectural Design Engineering Services MAR
11 - MIDLANT AOR
- Repairs and Alterations to Petroleum
Storage MAR 11 - MIDLANT AOR
- Industrial/Operations Facilities FEB 11
- MIDLANT AOR
POC Acquisition Office (757) 341-0098