Speaking a Different Language? - PowerPoint PPT Presentation

About This Presentation
Title:

Speaking a Different Language?

Description:

Title: Speaking a Different Language? Author: aeip0790 Last modified by: aeip0790 Created Date: 5/12/2006 9:13:32 AM Document presentation format – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 37
Provided by: aeip6
Category:

less

Transcript and Presenter's Notes

Title: Speaking a Different Language?


1
Speaking a Different Language?
  • Andy Ekinsmyth
  • West Sussex County Council

2
This talk will cover
  • The key outputs of our street scene and Household
    Survey consultations
  • How the public and engineers speak a different
    language
  • How we might align delivery to meet public
    aspirations

3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
Basic Difference
  • The function i.e. what it does
  • Whether it looks and feels right
  • Contradiction between whether the design is for
    form or function.

7
Objectives
  • Safety statutory obligation, user needs
  • Serviceability availability, integrity,
    reliability, condition.
  • Sustainability costs, value to the community,
    environmental contribution

8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
Parking Issues
Not Good
Good
20
What do our customers think?
21
What do our customers think?
22
Engineer Speak - Roads
  • Cracking
  • Crazing
  • Spalling
  • De-lamination
  • Edge breaks
  • Pot holes
  • Rutting
  • Thrust
  • Heave
  • SCRIM
  • Deflection
  • Fatting up

23
Everybody Else
  • Good
  • Bad
  • OK
  • And others phrases!

24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
Our Other Problem

The lack of it!
31
Improvements During Maintenance Work?
  • 47 of respondents indicated that street scene
    should be improved whilst 53 did not.

32
What are we doing?
  • Roads and footways timing of works, choice of
    materials, addressing funding issues (prudential
    borrowing)
  • Grass cutting increased frequency
  • Co-ordination of roadworks TMA, road works
    database, work with utilities, long term
    planning.

33
What are we doing?
  • Parking effective enforcement / parking zones,
    TMA
  • Trees and hedges a difficult one but we are
    working on it

34
Service Delivery
  • Match our service type and level to customer
    needs
  • Maintain a record of what materials are suitable
    in specific locations
  • Keep a stock of those materials for use
  • Determine where a 2nd visit to emergency response
    is warranted.
  • New contract arrangements to achieve this

35
(No Transcript)
36
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com