Transcript and Presenter's Notes

Title: Panhandle CREZs and Transmission Plans


1
(No Transcript)
2
Panhandle CREZs and Transmission Plans
  • SPP 4500/2700 Plan Leverages Existing 69 to 345
    kV SPP Infrastructure Approved Expansion Plans
  • Collects 4,500 MW nameplate capacity from best
    Texas CREZs
  • Delivers 3,150MW with 2,700 MW into ERCOT North
    via HVDC ties to three strong 345 kV ERCOT nodes

3
Another SPP CREZ Alternative
  • Comparable to Panhandle Loop Project in terms of
    wind development in Panhandle CREZs, e.g., 4,200
    MW vs. 4,500 MW.
  • Builds upon SPP 4,500 MW conceptual plan but is
    modified to deliver significant amounts into
    ERCOT via 3 large HVDC stations into ERCOT at
    Bowman (1,200 MW), W Denton (1,200 MW) and
    Pittsburg/Kiowa (300 MW).
  • Does not capitalize on all of the latent capacity
    in the existing Kiowa outlet lines or planned
    Hugo 2 generator 400 MW HVDC and associated 345
    kV outlet into SPP and ERCOT

4
SPP 4500/2700 Plan
  • Collects 4,500 MW of nameplate wind farm capacity
    in best Texas Panhandle CREZs
  • Delivers 3,150 MW of wind energy out of the
    Panhandle with 2,700 MW into ERCOT North via
    double circuit 345 kV lines interconnected at
    existing SPP Lawton Eastside, Sunnyside and
    Pittsburg 345 kV substations

5
SPP 4500/2700 Plan 1.13B
  • Direct costs associated with new DC ties 820M
  • Draper Sunnyside 345 kV - 60M
  • DC ties - 540M (2,700 MW _at_ 200k/MW)
  • Lawton Eastside Bowman 345 kV double circuit -
    100M
  • Sunnyside W. Denton 345 kV double circuit -
    120M
  • Advancements/Other Upgrades (86 or 2700/3150
    Prorata share) 310M
  • Mooreland Wichita 345 kV - 100M
  • Mooreland Northwest 345 kV - 80M
  • Briscoe Co Lawton Eastside 345 kV - 130M

6
Cost Estimates Notes
  •  
  • Values are preliminary and conservative.
  • 1.3M double circuit 345 kV line cost/mile based
    on ERCOT's study Table 4, Page 23.
  • None of the above figures include any costs for
    added Var support or reactive compensation on the
    lines.

7
Conclusions
  • SPP 4500/2700 Plan is an alternative that
    warrants serious consideration in the PUCT CREZ
    proceedings. This plan does not take advantage
    of all of the existing latent capacity in
    existing infrastructure between SPP and ERCOT,
    e.g, Kiowa 345 kV lines are rated in excess of
    2,000 MVA.
  • The SPP 4500/2700 Plan leverages existing and
    planned infrastructure to provide efficient
    delivers across SPP into 3 strong 345 kV nodes in
    ERCOT North which does not require any
    significant ERCOT expansion, unlike the Panhandle
    Loop Project.
  • With the SPP 4500/2700 Plan and additional HVDC
    ties associated with Entergy QPR, Hugo 2, and W
    Texas reliability/economic opportunities, HVDC
    interconnection capacity between SPP and ERCOT
    could increase from 800 MVA to almost 5,000 MVA.
  • Regardless of CREZ developments, significant
    amounts of HVDC ties may be economically
    justified between SPP in Oklahoma and ERCOT North
    given current LMPs. As a result of the SPP
    4500/2700 Plan, ERCOT North congestion costs are
    expected drop significantly, thereby reducing
    ERCOT customer bills by 100-200 million per
    year.

8
Panhandle Loop Project
  • Proposed 1.5B 800 mile high capacity 345 kV
    double circuit E-Plan to accommodate 4,200 MW
    of Panhandle CREZs and access to 3,800 MW of
    existing and potential cogenerators and other
    fossil-fueled resources in SPP to ERCOT.
  • Appears to interconnect with the ERCOT system at
    existing Oklaunion and Morgan Creek substations,
    plus an new substation in Haskell County.
  • Significant improvements internal to ERCOT are
    needed to provide deliverability for the
    Panhandle Loop Project to ERCOT loads. Electric
    Transmission Texas is proposing a 2 phase 345 kV
    3.2B transmission expansion to integrate W Texas
    and Panhandle into the ERCOT network.

9
Transmission Maps
  • Maps only show networked 69 kV facilities in
    SPP and 345 kV in ERCOT.
  • Maps are incomplete with regards to existing
    transmission infrastructure in SPP. Extensive
    radial 69 and 115 kV lines in SPP Panhandle are
    not shown Texas
  • Existing 345 kV in ERCOT are lightened.
  • Maps are intended to show the extensive existing
    infrastructure in SPP which can effectively and
    efficiently be used as a collector system for
    CREZ developments in the Panhandle.
  • Maps show CREZ 4500/2700 Plan compared to the
    Panhandle Loop Project and Electric Transmission
    Texas proposed 345 kV expansion plans.

10
Panhandle Loop Project ETTs Phase I II
11
SPP Infrastructure CREZ 4500/2700 Plan
12
Panhandle CREZs and 345 kV Options
13
SPP Expansion Plans
  • SPPs approved expansion plans include the
    western half of the X Plan is needed to address
    reliability needs in the Panhandle.
  • Capacity of the X Plan can effectively be
    double counted given potential CREZ deliveries
    out of the Panhandle.
  • Transmission expansion in SPP, in general, and
    OK, in particular, is much easier than that in
    Texas

14
ERCOT and CREZs in the News
  • RESTRUCTURING TODAY March 13, 2007
  • Lead Story Headline Barry Smitherman warns
    marketers in Texas
  • At KEMA meeting last week in San Antonio, FERC
    Commissioner Smitherman warned Texans against
    market power abuses and stated that If you do
    it, well come down on you like a ton of bricks.
    The article continues with He defined predatory
    pricing as the ability to control prices or to
    exclude competition.
  • Page 1 Headline 2 New transmission for wind to
    save Texans 10 billion
  • BP, Shell and Goldman Sachs lined up to invest in
    CREZs. Susan Sloan of AWEA Texas Operations says
    that The competitive energy market in Texas lets
    developers build a large wind farm and easily
    find buyers for the power. Article concludes
    with a Sloan quote that An ERCOT study found
    investing 1 billion in new transmission for wind
    power would clear the path for 6 billion worth
    of new wind generation. Once that capacity is
    built, Texans would save 10 billion in fuel
    costs and cut 100 million tons of greenhouse gas
    emissions.
  • Page 2 Headline PUC finds TXU may have abused
    market power in 2005
  • Page 2 Headline Barton fears TXU buyout may mess
    with Texas
  • ERCOT isnt under FERCs jurisdiction now since
    its doesnt buy power from other states and
    its located within Texas -- but Barton believes
    that needs to change. The article continues
    with a quote from Rep Joe Barton (R-TX) regarding
    the TXU buyout stating that ERCOTs independence
    is being used as a weapon against ratepayers.

15
SaskPower(pending)
16
Texans like things big, right?
  • Bigger is Better - SPP provides access to the
    500,000 MW Eastern Interconnection via extensive
    AC interconnections, as well as the 200,000 WECC
    system via DC ties.
  • SPP is performing an EHV Overlay Study now to
    develop a blueprint for the long range (2030)
    transmission system in and around SPP which will
    likely include extensive 500 and 765 kV
    transmission expansion to support major wind
    development in the TX, NM, OK and KS region for
    national renewable portfolio standards, etc.

17
February 24, 2007 Wind Event is Key
  • Aggressive wind development in ERCOT needs to
    consider implications given wind event which
    occurred in ERCOT on February 24th. Strong winds
    caused wind generation levels to drop from 2200
    MW to 500 MW in a time period of 90 minutes.
    Performance characteristics of different machines
    were noteworthy. Similar affects, albeit
    significantly less, were seen within SPP given
    the larger geopraphic diversity of wind farms in
    SPP. No impact seen on SPP wind farms in KS.
  • ERCOT is big, but SPP provides access to the
    Eastern Interconnection which is a significantly
    larger system and market compared to ERCOT. SPP
    in conjunction with the Entergy ICT provides
    transmission planning and OATT administration
    services for the non-ERCOT sections of Texas in
    the 500,000MW Eastern Interconnection. SPP also
    provides access to the WECC via 3 DC ties now.
  • Proposed new DC ties from SPP to ERCOT buffer
    ERCOTs system and customers from intermittent
    nature of wind resources and allows dynamic
    scheduling capabilities to improve performance of
    existing ERCOT system.

18
Next Steps
  • SPP will file testimony to support CREZ 4500/2700
    Plan at the PUCT in the next couple weeks.
  • SPP is considering alternatives regarding
    injection points into ERCOT North shown in the
    CREZ 4500/2700 Plan to better integrate with
    ETTs 345 kV project between Valley Spring
    Oklaunion which would be designed/built for 765
    kV operation.
  • Absent a special agreement, SPP must follow its
    OATT with regards to the provision of
    transmission service and system expansion.

19
Jay CasparyDirector, Engineering501-614-3220jca
spary_at_spp.org
Questions?