Question - PowerPoint PPT Presentation

1 / 3
About This Presentation
Title:

Question

Description:

Question There are three factories on the Momiss River. Each factory emits two types of pollutants into the river. If the waste from each factory is processed, the ... – PowerPoint PPT presentation

Number of Views:202
Avg rating:3.0/5.0
Slides: 4
Provided by: asb4
Category:
Tags: question

less

Transcript and Presenter's Notes

Title: Question


1
Question
  • There are three factories on the Momiss River.
    Each factory emits two types of pollutants into
    the river. If the waste from each factory is
    processed, the pollution in the river can be
    reduced.
  • It costs 15 to process a ton of waste from
    factory 1, and each ton of factory 1 waste
    processed will reduce the amount of pollutant 1
    by 0.10 ton and will reduce the amount of
    pollutant 2 by 0.45 ton.
  • It costs 10 to process a ton of waste from
    factory 2, and each ton of factory 2 waste
    processed will reduce the amount of pollutant 1
    by 0.20 ton and will reduce the amount of
    pollutant 2 by 0.25 ton.
  • It costs 20 to process a ton of waste from
    factory 3, and each ton of factory 3 waste
    processed will reduce the amount of pollutant 1
    by 0.40 ton and will reduce the amount of
    pollutant 2 by 0.30 ton.
  • The state wishes to reduce the amount of
    pollutant 1 in the river by at least 30 tons, and
    the amount of pollutant 2 in the river by at
    least 40 tons.
  • Formulate an LP that will minimize the cost of
    reducing pollution by the desired amounts.

2
  • Variables-
  • P1 amount of pollutant 1 in the waste give out
    by factory 1
  • Q1 amount of pollutant 1 in the waste given out
    by factory 2
  • R1 amount of pollutant 1 in the waste given out
    by factory 3
  • P2 amount of pollutant 2 in the waste given out
    by factory 1
  • Q2 amount of pollutant 2 in the waste given out
    by factory 2
  • R2 amount of pollutant 2 in the waste given out
    by factory 3

3
  • Objective -
  • Minimize cost of reducing pollution by the
    desired amount
  • Z 15(P1P2)10(Q1Q2)20(R1R2)
  • Constraints -
  • - 0.10P10.20Q10.40R1 gt30
  • - 0.45P20.25Q20.30R2 gt 40
  • - P1,P2,Q1,Q2,R1,R2gt0