Title: New Delhi


1
  • Engineering Services


New Delhi
17.01.07
2
Presentation Sequence
  • Company Profile
  • Engineering Services, ONGC
  • Assets Created
  • Typical Offshore Facilities
  • Assets under Creation/Renewal
  • Assets Creation Under Tendering
  • Asset Creation Future Plan

Contd . .
3
Company Profile

MSP
4
ONGCs Strategic Vision 2001-2020
  • To focus on core business of EP
  • Doubling reserves (i.e. accreting 6 billion
    tonnes of OOEG) by 2020 out of this 4 billion
    tonnes are targeted from the Deep-waters.
  • Improving average recovery from 28 to 40.
  • Equity Hydrocarbon from abroad.

SH
5
Financial Status (2005-06)
  • ONGC posted a net profit of Rs. 14431 Crores, the
    Highest by any Indian Company.
  • Practically zero debt Corporate.
  • Contributed over Rs. 23376 Crores to the
    exchequer.
  • Highest ever Dividend of Rs. 6417 Crores by any
    Indian Corporate.

6
Recognition in Last 12 Months
  • ONGC became the NO. 1 EP Company in the World
    and 20th among leading Global Energy majors as
    per Platts Top 250.
  • ONGC became the first Central Public Enterprise
    to receiver the designated national authority for
    its clean development mechanism under the Kyoto
    Protocol.
  • ONGC was conferred the Golden Peacock Award for
    Corporate Social Responsibility in Emerging
    Economics, 2006.

7
Recognition in Last 12 Months
  • ONGC secured the NDTV Profit Business Leadership
    Award in the Oil and Gas Category, handed over by
    the Honble Prime Minister of India.
  • ONGC was awarded the highest-ever Credit Rating
    for any Indian corporate by the International
    Credit Rating Agency Moodys Investor Services.
  • FY06 performance of ONGC has been rated
    Excellent by the Department of Public
    Enterprises.
  • ONGC has become the first PSU to get ISO
    9001-2000 Certification from DNV for Internal
    Audit.

8
Engineering Services
  • ONGC

9
Engineering Services, ONGC
  • Engineering Services is responsible for creating
    facilities for exploitation transportation of
    hydrocarbons.
  • To meet the above objectives, Engineering
    Services undertakes following activities-
  • Engineering
  • Construction
  • Facility Renewal
  • Marine Surveys

MSP
10
Engineering Services, ONGC
Activities
  • Works(ISO-9001-2000 Certified)
  • Tendering Award of EPC Contract
  • Contract Execution including Project Management
  • Engg. Construction related Surveys.
  • Design(ISO-9001-2000Certified)
  • Engineering Consultancy
  • Facility Optimization
  • Technological Upgradation
  • Maintenance Management

11
Engineering Services, ONGC
  • Offshore
  • Process Platforms
  • Well Platforms
  • Clamp-on structures on existing Platforms
  • Submarine Pipelines (trunk line, in-field lines)
  • Offshore Power Generation/Submarine cabling etc.
  • Onshore
  • GGS/GCS
  • CTF
  • ETP
  • Mini Refineries
  • Pipelines
  • Power Generation

BHS
SA PF
12
Projects Execution Strategy
Major Works Centers of Engg. Services
Western Region
North Eastern Region
Assets Ahmedabad, Ankleshwar, Mehsana
Assets Assam, Tripura
Mumbai Region
Central Region
Assets Mumbai High, Bassein Satellite,
Neelam Heera Engineering Services
Southern Region
Assets Karaikal, Rajamundary
13
Projects Execution Strategy
Major Works Centers of Engg. Services
Western Region
North Eastern Region
Assets Ahmedabad, Ankleshwar, Mehsana
Assets Assam, Tripura
Mumbai Region
Central Region
Assets Mumbai High, Bassein Satellite,
Neelam Heera Engineering Services
Southern Region
Assets Karaikal, Rajamundary
14
Assets Created
15
Assets Created
(upto pre-monsoon06)
  • Western Offshore
  • Process Platforms 34
  • Well Platforms 146
  • Clamp-on 66
  • Submarine P/L (Kms) 4500
  • Eastern Offshore
  • Well Platforms 4

Neelam Process Complex
Contd . .
16
Growth of Process Platforms
Nos.
IC Complex
For one year
17
Growth of Well Platforms
Nos.
For one year
18
Growth of Clamp on Structures
Nos.
19
Growth Of Pipelines
Kms.
For one year
20
Typical Offshore Facilities

21
Typical Well Platform Requirements
  • Structural Steel
  • 2000 to 3000 tonnes
  • Submarine Pipelines
  • 15-20 Km (4 to 18) WF/WI/GL
  • Other Items

Valves Vessels Batteries Line Pipes CP Systems Shutdown Systems Composite Materials Solar Power Systems Life Support Systems Personal Safety Systems Fire Detection Protection Systems Electrical, Instrumentation Fiber Optic Cables.
22
Typical Process Platform Requirements
  • Structural Steel - 4000 to 5000 tonnes
  • Line Pipe - 40 to 50 Km from interconnecting

  • WF/WI/GL
  • Cables (Elect. Instt.) - 200 Km
  • Other Items

Pipes Valves Vessels DCS PLC UPS Batteries HVAC Systems CP Systems HT Panels LT Panels Composite Material Pipeline Coatings CCTV Systems Paging Intercoms Gas Turbine Generator Process Gas Compressor MOL Pumps Water Injection Pumps Air Compressors Solar Power Systems Fire Detection Protection Systems Produced Water Treatment Systems Life Support Personal Safety System Electrical, Instt. Fiber Optic Cables.
23
Assets Under Creation / Renewal
24
Asset Under Creation
  • Facilities
  • Process Platform 2 (BCP-B2 Vasai East )
  • Well Platforms 16 (Heera Re-Development,
  • C-Series, WPP-1 2)
  • Submarine Pipelines 267 Kms
  • Value US 1844 M
  • (Rs. 8378 Crores)

25
Asset Under Creation
Sl. No. Project Description Value Completion
1 BCP-B2 Gas Compressor Platform US 283 M (Rs. 1300 Crs.) 29.02.2008
2. Vasai East Process-cum Booster Compressor Platform Well Platform US 456 M (Rs. 2117 Crs.) 02.04.2008
3. WPP-I Well Platform US 239 M (Rs. 1000 Crs.) 04.04.2007
4. WPP-2 Well Platform US 189 M (Rs. 866 Crs.) 19.04.2007
5. C-Series Well Platforms US 388 M (Rs. 1791 Crs.) 20.04.2008
6. Heera Re-development Well Platforms Pipelines US 289 M (Rs. 1304 Crs.) 30.04.2008

26
Asset Under Renewal
  • Facilities
  • Process Platform 1 (SH-RC)
  • Well Platforms 26
  • Pipelines 239 Kms
  • Awarded Cost US 639 M
  • (Rs. 2855 Crores)

27
Asset Under Renewal
Sl. No. Project Description Value Completion
1. 26 Well Platforms Revamp of un-manned platforms in Mumbai High US 71 M (Rs. 330 Crs.) 30.04.2007
2. SH Revamp Revamp of SHP Platform US 42 M (Rs. 194 Crs.) 15.04.2007
3. PRP Replacement of Old Pipeline US 526 M (Rs. 2330 Crs.) 30.04.2008
28
Asset Creation (Under Tendering)
29
Project under Tendering
  • Facilities
  • Process Platforms 1 (New MHN)
  • Clamp-on Project 1
  • Pipeline 24 Kms. (UTG)
  • Estimated Cost US 904 M
    (Rs. 4160 Crores)

30
New MHN Process Platform
  • Process Platform having following facilities-
  • Oil Handling 48000 BOPD
  • Gas Handling 6.8 MMSCMD
  • Water Handling 215000 BOPD
  • Living Quarters For 220 Persons
  • Flare Jacket
  • Pipeline 100 Kms
  • Modification of Existing 14 Nos.
  • Platforms
  • Estimated Cost US 821 M
    (Rs. 3776.6 Crores)
  • Schedule Completion April, 2010

31
20 Gas Line between Uran Trombay
  • Laying of 20 pipeline between Uran Plant and
    Trombay Terminals
  • Total Length 24 Kms
  • Onshore Area 8.1 Kms
  • Offshore Area 8.4 Kms
  • Marshy Area 7.5 Kms
  • Estimated Cost US 52.4 M
    (Rs. 235 Crores)
  • Schedule Completion 31.05.2008

32
6 Clamp-on Project
  • Installation of Clamp-on Structure alongwith
    Modification works in Mumbai High Well Platforms.
  • WA Platform
  • WB Platform
  • WI-6 Platform
  • IN Platform
  • IP Platform
  • Estimated Cost US 31 M
    (Rs. 148.5 Crores)
  • Schedule Completion 29.02.2008

33
Asset CreationFuture Plans
34
Future Business Plan
  • Offshore
  • Project - 11 Nos.
  • Indicative Cost - US 3986 M
  • Onshore
  • Project - 9 Nos.
  • Indicative Cost - US 2284 M

35
Asset Creation Future Plans - Offshore
Sl. No. Project Description Indicative Cost Completion
1. B-22 Platforms Well-cum Process Platform, Well Platform, Pipelines Modifi. US 360 M (Rs. 1650 Crs.) 28.02.2010
2. B-193 Platform Well-cum Process Platform, Well Platform, Pipelines Modifi. US 406M (Rs. 1870 Crs.) 01.03.2010
3. B-Series Gas (MH) Platform Well Platform Pipeline US 290 M (Rs. 1330 Crs.) 30.04.2010
36
Asset Creation Future Plans-Offshore
Sl. No Project Description Indicative Cost Completion
4. Grid Inter Connectivity Grid Inter connectivity of 26 Well Platforms with Process Platforms US 175 M (Rs. 850 Crs.) 30.04.2010
5. Conversion of Sagar Samrat Conversion of Sagar Samart to MOPU US 75 M (Rs. 345 Crs.) 01.03.2009
6. Pipeline Replacement Project Rolling Plan for replacement of old pipelines US 450 M (Rs. 2025 Crs.) 31.03.2011
7. Re-Re-Devlop plan of MH Process Well Platforms in Mumbai High US 1340 M (Rs. 6164 Crs.) Not yet firmed up
37
Future Revamp ProjectsOffshore
Sl. No. Project Description Indicative Cost Completion
1. 30 PLF. Revamp Revamp of 30 well head platforms in MH N and H US 85 M (Rs. 400 Crs.) 30.01.2010
2. Revamp of WIN, WIS, ICW SHW PLF. Revamp of Water Injection Platforms of Mumbai High US 400 M (Rs. 1840 Crs.) 30.04.2010
3. Revamping Well-head of PLF. 3rd Phase of revamp of Well-head Platforms US 85 M (Rs. 400 Crs.) 30.04.2009
4. Revamp of Neelam Heera Platforms Revamp of NLM,HRG HRA Process Platforms and 13 Well Platforms US 320 M (Rs. 1470 Crs.) 15.05.2009
38
Future Business Potential Onshore
Sl. No. Project Description Indicative Cost Completion
1. Assam Renewal Project Revamp of existing facilities in Assam Asset US 550 M (Rs. 2500 Crs.) 30.01.2010
2. Western Onshore Renewal Revamp of existing facilities in Western onshore Asset US 650 M (Rs. 3000 Crs.) 30.12.2010
3. Tripura Power Plant 1000MW Power Plant in Tripura US 870 M (Rs. 4000 Crs.) -
4. GCS and Trunk Pipeline GCS and Trunk pipeline in Tripura Project US 40 M (Rs. 180 Crs.) 31.12.2008
5. Refinery and new facilities Refinery and new facilities at Rajahmundry US 31.5 M (Rs. 148 Crs.) 31.05.2009
39
Future Business Potential Onshore
Sl. No. Project Description Indicative Cost Completion
6. Cauvery Asset New Facilities at Karikal US 31 M (Rs. 145 Crores) 31.03.2010
7. Ahmedabad Asset Construction of 3 GGS US 25 M (Rs.120 Crores) 31.05.2009
8. Mehsana Asset Construction of 4 GGS and 1 ETP US 40 M (Rs. 185 Crores) 31.05.2009
9. Ankelashwar Asset Construction of GGS, ETP, CPF etc. US 47 M (Rs. 225 Crores) 30.04.2010
40
Expectation from the Industry
  • Competitive and Clean bids.
  • All BEC requirements to be addressed.
  • Proven Technology
  • No deviations
  • Functional specifications are given in ONGC
    Tender, ONGC expects bidders to use this
    flexibility to provide-
  • Cost effective solution
  • Optimized Design
  • New generation of equipment
  • ONGC is following Three Tier Safety System during
    Offshore Construction, it expects all statutory
    SHE considerations/ requirements are followed
    during execution for
  • Crew
  • Vessel
  • Equipment
  • Procedure

41