Title: Safety Assessment
1Safety Assessment
The European Organisation for the Safety of Air
Navigation
2Safety Assessment is an EC1035/2011
requirement EC1034-2011 helps understanding
which changes require a formal assessment that
needs NSA review Experience has shown that the
Safety Consideration Process provides good
understanding of the changes
3The Only acceptable means of compliance to ESARR4
(EC1035/2011) as of today is SAM (with
limitations)
SAM is a toolbox mainly known for its
FHA-PSSA-SSA processes - Functional Hazard
Assessment - Preliminary System Safety
Assessment - System Safety Assessment
SAM most suitable for hardware changes for which
we can have an influence on the design, usage
much more difficult for many other changes,
procedures, airspace etc
4eSAM
- eSAM V2.1 helps navigating through the
documentation set of "ANS Safety Assessment
Methodology" - http//www.eurocontrol.int/safety/public/site_pref
erences/display_library_list_public.html17
5Safety considerations
Brainstorming
First attempt to construct Safety Argument (high
level)
Initial safety argument
Translation of initial argument into required
activities
Safety Plan
Conduct of activities
Production of the report
6Safety considerations process
7Safety considerations
What are the needs for change? What are the new
system boundaries? (OPS Concept) Are there
(initial) assumptions? (OPS Concept) Are
(Initial) Safety requirements realistic? Will it
be possible to build an argument? What evidence
could be provided? Would it feasible and
beneficial to quantify? How shall the new
system/change be operated? What are the
interfaces? What impact foreseeable? How and
who will assess hazards? In what way is the
proposed operational concept different from
current one?
No operational concept Scope unclear Missing
assumptions Safety requirements unrealistic Bad
arguments Little or no evidence Errors in
calculations No concept of operations Impact at
boundaries not addressed Hazards classification
questionable SAFETY BENEFITS OF NORMAL
OPERATIONS?
8How did we do things so far?
What we used to do
We have trained the staff
We have a fall-back system
We have temporary procedures
We have Revised procedures
What we concluded
Decision to go operational
9What are we asked to do today?
10Initial safety argument
Arg0
We need to demonstrate that change will be safe
How are we going to do that?
Arg4
Arg1
Arg2
On-going operations will be safe
Arg3
Safe after implementation
Safe to migrate operations
Safe by design
How are we going to do that?
How are we going to do that?
How are we going to do that?
Life cycle
How are we going to do that?
Safety Plan
11Safety Assessment for DQR
- DQR-REQ-300 The safety assessment process to
support the establishment of new or updated data
quality requirements shall be documented and
include all the necessary steps to derive the
data quality requirements to ensure data of
sufficient quality are provided to meet the
intended use for each data item under
consideration, as a minimum
12Safety Assessment for DQR
- Identify all relevant uses for the aeronautical
data item or dataset. - Conduct Hazard Identification and Analysis.
- Determine accuracy and resolution requirements
taking into consideration - The functionality, performance and availability
required by the intended use to achieve an
acceptable level of safety. - The inherent limitations in originating the data
item or dataset. - Determine the data integrity level, based on the
results of step 1 and step 2, for the most
stringent use. - Consider the necessity to assign requirements
for the ability to determine the origin of the
data, other than the ones already defined in
Annex I Part C of Commission Regulation (EU)
73/2010. - Consider the necessity to assign requirements
for the level of assurance that the data is made
available to the next intended user prior to its
effective start date/time and not deleted before
its effective end date/time, other than the ones
already defined in Article 7(3) and Article 7(4)
of Commission Regulation (EU) 73/2010.
13Initial safety argument
Lets have a look at the MS-Visio figures
14(No Transcript)
15(No Transcript)
16QA
The European Organisation for the Safety of Air
Navigation