Background - PowerPoint PPT Presentation

1 / 44
About This Presentation
Title:

Background

Description:

Background Lake County 24 x 20 mi area Population 690,000 52 municipalities Congestion No freeways Limited 4-lane arterials Transportation controversies PASSAGE Goals ... – PowerPoint PPT presentation

Number of Views:90
Avg rating:3.0/5.0
Slides: 45
Provided by: Sta7376
Category:
Tags: background | lake

less

Transcript and Presenter's Notes

Title: Background


1
(No Transcript)
2
Background
  • Lake County
  • 24 x 20 mi area
  • Population 690,000
  • 52 municipalities
  • Congestion
  • No freeways
  • Limited 4-lane arterials
  • Transportation controversies

3
PASSAGE Goals
  • Countywide
  • 1. Improved signal system coordination
  • 2. Enhanced real time traffic monitoring
  • 3. Improved incident/event management

4
Benefits
  • Time savings to motorists from
  • Improved signal system coordination
  • Get more greens
  • Better real time traffic monitoring
  • Drivers have better information
  • Improved event management
  • Someone takes corrective action

5
Two Opportunity Factors
  • Lake Countys good fortune
  • Institutional Arrangements
  • Funding

6
Institutional Arrangements
  • Measured by number of signals
  • 435 IDOT
  • 144 County
  • 82 Municipal (12 of 52)
  • 661 signals total

7
Institutional Arrangements
  • Existing and proposed signals
  • LDOT
  • Econolite 144
  • IDOT
  • Econolite 186
  • Eagle 96
  • Unknown or Proposed 153
  • Local Municipalities
  • Econolite 51
  • Eagle 15
  • Other 16
  • 661 signals total

8
Institutional Arrangements
  • Two major players
  • IDOT
  • County
  • Only 12 supplemental players

9
Funding
  • Phase 1A cost 6.3 million
  • 42 federal ITS earmarks
  • 16 special federal earmark
  • 42 county local match
  • In-kind state assistance
  • IDOT
  • ISTHA
  • GCM Corridor

10
What is in Lake County PASSAGE?
  • i.e. What Intelligent Transportation System
    Technologies are being used?

11
ITS Technologies
  • Briefly, Phase 1A includes

12
ITS Technologies
  • 1 Fiber optic network
  • 2 Connect traffic signals
  • 3 Install TSS
  • 4 Initiate HAR
  • 5 CAD
  • 6 Video camera
  • 7 GCM link
  • 8 DMS
  • 9 ATMS
  • 10 Event management
  • 11 Congestion management
  • 12 Traveler info
  • 13 Maintenance management

13
1. Fiber Optic Network
  • Start fiber backbone network (79 miles)
  • Gigabit Ethernet
  • Mesh topology
  • Redundant paths
  • Fault tolerant
  • Fill in existing gaps (14 mi new)

14
2. Traffic Signals in Phase 1A
  • On the backbone
  • 95 IDOT
  • 44 County
  • 6 Municipal
  • 145 Total
  • Others remain dedicated or dialup
  • Normal project network expansion

15
4. Initiate Highway Advisory Radio
  • 3 sites to start
  • I-94 focus
  • (at interchanges)
  • Synchronized
  • Automated message generation
  • Text-to-speech conversion
  • HAR signs- 1620 AM

16
4. Initiate Highway Advisory Radio
17
5. Initial CAD interface
911
  • Sheriff Computer Aided Dispatch system
  • 911 cellular calls
  • Filters applied

18
5. Initial CAD interface
19
6. Expanded Video Camera Use
  • Incorporating 27 PTZs on backbone
  • Adding 5 new PTZs
  • Others remain dialup
  • Normal project video expansion

20
7. Initiate Dynamic Message Signs
  • 3-Portable, side road mounted
  • Use for some incidents
  • Automated message generation

21
8. Initial GCM link
  • Gary-Chicago-Milwaukee Gateway
  • Regional link
  • Via IDOT fibers along Tollway
  • IDOT Offices

22
9. Advanced Transportation Management System
  • ATMS central software brains
  • Makes everything work together

23
9. ATMS
  • Integrated congestion management
  • Operator interface
  • GIS integration
  • Failure management
  • Maintenance management
  • Signal internal paging (staff)
  • Integrated incident management
  • Web page broadcast
  • Arterials Tollway

24
9. ATMS
  • Map-based Operations
  • Monitor real-time traffic conditions from the map
  • Light, medium, heavy or alarm heavy traffic
  • Display traffic signal system and ITS devices
    with active status
  • Dynamic layering
  • Click on icon to control field devices

25
9. ATMS
  • Field Device Control
  • Signal system interface
  • CCTV control
  • HAR
  • DMS
  • Monitor RWIS

26
10. Event Management
  • Incidents
  • Planned lane closures
  • Unplanned lane closures
  • Special events
  • Weather events

27
11. Congestion Management
  • Real-time
  • Signal timing changes
  • Real-time traveler information (DMS and HAR)
  • Advanced congestion management
  • Support for timing optimization
  • Data collection and interface to Synchro capacity
    software
  • Support capacity analysis

28
13. Maintenance Management
  • View and log signal system failures
  • View and log ITS device failures
  • Provide logging of maintenance activities
  • Track open maintenance items
  • Page maintenance personnel

29
12. Traveler Information
  • Provide for real-time web map display
  • Include incidents and planned events
  • Provide interface to the GCM gateway
  • Traffic data
  • Event details
  • Eventually signal coordination

30
ITS Technologies
  • All housed in Traffic Management Center (TMC) in
    Libertyville
  • Building addition
  • One story, 4400 sq ft
  • Houses traffic section

31
TMC Facility
32
TMC Staffing
  • Phase 1A
  • 2 TMC operators
  • 530 am 800 pm coverage
  • Hands on peak periods Monday thru Friday
  • Actively monitor traffic conditions and status
  • 630 - 900 am
  • 300 - 630 pm
  • IDOT Office Space

33
ITS Technologies
  • Caveats
  • Phase 1A still under development-80 paid out
  • Phase 1A coverage
  • Not the whole county
  • Not equivalent coverage areas
  • Other Phases to follow

34
Thanks to
  • County Engineer
  • Martin Buehler P.E.
  • Consultant
  • NET Joseph Brahm, P.E.
  • IDOT
  • ISTHA
  • Federal Reps and FHWA

35
Questions?

36
Direct Fiber Communication
  • Equipment used

37
Direct Fiber Communication
  • Equipment used

38
The Name
  • Lake County PASSAGE
  • Program for Arterial Signal Synchronization and
    TrAvel GuidancE
  • Implementation Phasing Plan (IPP) completed
  • Phase 1A underway

39
Lake County Board Strategic Plan
  • Enhance the development and expansion of an
    efficient and effective transportation system
  • .Also a Federal initiative

40
Consequences of No Action
  • Loss of opportunity to provide yearly time
    benefits to motorists through
  • Improved signal system coordination
    12.3million/year
  • Better real time traffic monitoring
    4.7million/year
  • Improved event management
    million/year

  • 17 million/year

41
1. Fiber Optic Network
  • Phase 1 (AB) Deployment
  • 1 million investment in fiber infrastructure
  • 1 million investment in electronics
  • Mesh topology 4 redundant paths and spurs

42
10. Event Management
  • ATMS will support three methods of generating a
    response plan
  • System-generated
  • Select from a plan library
  • User-generated

43
TMC Facility
44
Benefits Lake County Passage
  • Time savings to motorists from
  • Improved signal system coordination
  • get more greens
  • Better real-time traffic monitoring
  • ... drivers have better information
  • Improved event management
  • someone takes corrective action
Write a Comment
User Comments (0)
About PowerShow.com