2Financial Physical Performance (2010-11)
Allocation of Funds under IAY Rs. 10053.70 cr
Central Releases Rs. 10139.45 cr
Total Available Funds Rs. 17902.70 cr
Utilization Rs. 13406.52 cr (74.89)
Physical Target 29.08 lakh
Physical Achievement 26.96 lakh (92.69)
No. of houses sanctioned in 2010-11 33.40 lakh (114.86)
No. of houses sanctioned to SC/ST 17.95 lakh (53.74)
No. of houses sanctioned to Minorities 4.26 lakh (12.75)
3Districts which have not availed Instalments of
Funds for 2010-11
State 1st 1st (Part) Installment 2nd Installment
Arunachal Pradesh - Papumpara Lower Subansiri
Assam - Dhubri, Karimganj, N.C.Hills Sonitpur
A N Islands Nicobar Nicobar
Bihar Araria Purnia Araria, Punia, Saran Supul (4)
Chhattisgarh - Janjgir-champa
Daman Diu - Daman Diu
Dadra N. Haveli - Dadra N. Haveli
4Districts which have not availed Installments of
Funds for 2010-11
State 1st 1st (Part) Installment 2nd Installment
JK - Ganderbal, Kathua, Kishtwar Srinagar
Manipur Thobal Thobal, Bishnupur, Chandel, Churachandpur, Imphal West
Orissa Jagatsinghpur Jagatsinghpur, Rayagada
Puducherry Puducherry Puducherry
Punjab - Muktsar
West Bengal Darjeeling Darjeeling, Howrah
5Releases with Deductions (2010-11)
State Amount deducted (Rs. Lakh)
Arunachal Pradesh 35.146
Assam 7776.670
Meghalaya 359.013
Mizoram 9.200
Total 8180.029
6Releases with Deductions (2010-11)
State Amount deducted State Amount deducted
Andhra Pradesh 0.347 Maharastra 163.611
Bihar 20497.222 Orissa 2134.748
Chhattisgarh 151.688 Punjab 1191.248
Goa 98.410 Rajasthan 129.475
Gujarat 3124.214 Uttar Pradesh 107.469
Himachal Pradesh 14.097 Uttarakhand 585.925
J K 635.861 West Bengal 9041.456
Jharkhand- 3293.792 A N Islands 79.320
Madhya Pradesh 583.731 Total 41832.614
7Districts which have not been released Ist
instalment for 2011-12 due to non-fulfilment of
conditions/non-submission of proposal
States No. of Districts Names of Districts
Arunachal Pradesh 16 ANJAW(Border), CHANGLANG, D. VALLEY LOWER DEBANG VALLEY, KAMENG EAST, KAMENG WEST, KURUNG KURMEY, LOHIT, PAPUMPARE, SIANG EAST, SIANG UPPER, SIANG WEST, SUBANSIRI LOWER, SUBANSIRI UPPER, TAWANG, TIRAP
Assam 5 DHUBRI, KAMRUP(RURAL), KARIMGANJ, N.C.HILLS,SONITPUR
Bihar 27 ARARIA, ARWAL, BHAABHUA, BHAGALPUR, BHOJPUR, BUXER, CHAMPARAN WEST, DARBHANGA, GAYA, GOPALGANJ, JAMUI, KHAGARIA, KISHANGANJ, LAKHISARAI, MADHUBANI, MUNGER, MUZAFFARPUR, NALANDA, PATNA, PURNIA, ROHTAS, SAHARSA, SAMASTIPUR, SARAN, SITAMARHI, SUPUL, VAISHALI
Gujarat 6 BHAVNAGAR, GANDHINAGAR, JAMNAGAR, JUNAGADH, KACHCHH, RAJKOT
H. P 2 KINNAUR, LAHUL SPITI
8Districts which have not been released Ist
instalment for 2011-12 due to non-fulfilment of
conditions/non-submission of proposal
States No. of Districts Names of Districts
Jammu Kashmir 8 GANDERBAL, KARGIL, KATHUA, KISHTWAR, LEH, RAMBAN, REASI, SRINAGAR
Karnataka 11 BAGALKOT, BELGAUM, BELLARY, BIDAR, BIJAPUR, CHIKBALLAPUR, DAKSHINA KANNADA, DHARWAD, GADAG, GULBARGA, KOPPAL
Manipur 3 BISHNUPUR, CHANDEL, IMPHAL WEST
Orissa 8 DEOGARH, GAJAPATI, JAGATSINGHPUR, KALAHANDI, KEONJHAR, MALKANGIRI. RAYAGADA, SAMBALPUR
Punjab 9 BATHINDA, HOSHIARPUR, LALANDHAR, KAPURTHALA, LUDHIANA, MOGA, MUKTASAR, NAWANSHAHAR,ROOPNAGAR
U. P 2 BAGHPAT, GAUTAM BUDHA NAGAR
West Bengal 3 DARJEELING, HOWRAH, MEDINIPUR WEST
9Districts which have not been released Ist
instalment for 2011-12 due to non-fulfilment of
conditions/non-submission of proposal (Contd.)
States No. of Districts Names of Districts
A N Islands 3 ANDAMANS, N M ANDAMAN, NICOBARS
Dadar Nagar Haveli DADAR NAGAR HAVELI
Daman Diu DAMAN DIU
Lakshadweep LAKSHADWEEP
Puducherry PUDUCHERRY
10Houses under Construction/Incomplete
S. No States No. of Distts. In the State Number of Houses under Construction/Incomplete Number of Houses under Construction/Incomplete
More than 100 of Target for 2011-12 (No. of Distts./Total No. of Distts.) More than 86 of Target for 2011-12 (No. of Distts/Total No. of Distts.)
1 ARUNACHAL PRADESH 16 1 1
2 ASSAM 27 4 8
3 BIHAR 38 34 35
4 CHHATTISGARH 16 9 9
5 GOA 2 2 2
6 GUJARAT 26 13 13
7 HIMACHAL PRADESH 12 2 2
11Houses under Construction/Incomplete
S. No States No. of Distts. In the State Number of Houses under Construction/Incomplete Number of Houses under Construction/Incomplete
More than 100 of Target for 2011-12 (No. of Distt./Total No. of Distt.) More than 86 of Target for 2011-12 (No. of Distt/Total No. of Distt.)
8 JAMMU AND KASHMIR 22 4 5
9 JHARKHAND 24 24 24
10 KARNATAKA 29 3 4
11 KERALA 14 5 6
12 MADHYA PRADESH 48 13 16
13 MAHARASHTRA 33 5 5
14 MANIPUR 9 1 1
12Houses under Construction/Incomplete
S. No States No. of Distts. in the State Number of Houses under Construction/Incomplete Number of Houses under Construction/Incomplete
More than 100 of Target for 2011-12 (No. of Distt./Total No. of Distt.) More than 86 of Target for 2011-12 (No. of Distt/Total No. of Distt.)
15 MEGHALAYA 7 2 3
16 ORISSA 30 12 14
17 PUNJAB 20 2
18 RAJASTHAN 33 9 10
19 TRIPURA 4 2
20 UTTAR PRADESH 71 4 5
21 WEST BENGAL 19 3 6
22 AND NIC ISLANDS 3 1 1
13 Coverage of Targeted Components (2010-11)
State/UT No. of Distts. in the State Coverage- SC/ST less than 60 (No. of Distts.) Coverage-Physically Challenged less than 1 (No. of Distts.) Coverage - Women less than 40 (No. of Distts.) Coverage-Minorities less than 80 of Minority target (No. of Distts.)
Andhra Pradesh 22 8 13 0 10
Arunachal Pradesh 16 9 14 10 16
Assam 27 4 7 7 10
Bihar 38 11 8/ 0 10
Chhattisgarh 16 2 14 0 15
Goa 12 1 2 0 1
Gujarat 26 9 18 0 18
Haryana 21 4 9 1 10
Himachal Pradesh 12 7 5 3 10
14 Coverage of Targeted Components (2010-11)
State/UT No. of Distts. in the State Coverage- SC/ST less than 60 (No. of Distts.) Coverage-Physically Challenged less than 1 (No. of Distts.) Coverage - Women less than 40 (No. of Distts.) Coverage-Minorities less than 80 of the minority target (No. of Distts.)
J K 22 9 17 13 21
Jharkhand 24 3 11 8 8
Karnataka 29 22 11 0 14
Kerala 14 11 3 11 0
Madhya Pradesh 48 24 27 0 31
Maharashtra 33 10 20 5 16
Manipur 9 7 5 7 8
Meghalaya 7 0 4 3 --
15 Coverage of Targeted Components (2010-11)
State/UT No. of Distts. in the State Coverage- SC/ST less than 60 (No. of Distts.) Coverage-Physically Challenged less than 1 (No. of Distts.) Coverage - Women less than 40 (No. of Distts.) Coverage-Minorities less than 80 of minority target (No. of Distts.)
Mizoram 8 1 5 2 --
Nagaland 11 0 0 0 --
Orissa 30 7 23 1 26
Punjab 20 7 11 3 9
Rajasthan 33 5 14 1 13
Sikkim 1 0 0 0 0
Tamil Nadu 31 2 4 0 8
Tripura 4 0 1 0 1
16 Coverage of Targeted Components (2010-11)
State/UT No. of Distts. in the State Coverage- SC/ST less than 60 (No. of Distts.) Coverage-Physically Challenged less than 1 (No. of Distts.) Coverage - Women less than 40 (No. of Distts.) Coverage-Minorities less than 80 of minority target(No. of Distts.)
Uttar Pradesh 71 25 38 11 34
Uttarakhand 13 5 12 1 10
West Bengal 19 10 9 3 4
A N Islands 3 NA 3 2 3
D N Haveli 1 NA NA NA NA
Daman Diu 1 NA NA NA NA
Lakshadweep 1 NA NA NA NA
Puducherry 1 NA NA NA NA
NA Not Available NA Not Available NA Not Available NA Not Available NA Not Available NA Not Available
17Requirement for Full Release of Funds
- At least 60 of Total Available Funds (TAF) to be
utilised - Transfer of funds not to implementing agencies
but beneficiaries to be treated as expenditure - Opening balance in UC to tally with closing
balance in Audit Report - Closing balance to be less than 10 of TAF
- Diversion of IAY funds and interest amount for
other purposes not permitted - Reporting of Outcome performance as part of UC
- In case of excess closing balance utilise 75 of
TAF by 31st December
18Common/Frequent Shortcomings/Errors in Proposals
submitted for II Installment
- State share not released or partially released
- UC/AR/Block Expenditure Statement and Bank
Reconciliation Statement do not tally - Compliance with Auditors observations not
furnished with the proposal - Bank Charges/Contingency Expenditure included in
the Income and Expenditure Statement which is not
permissible - The interest accrued on IAY funds parked in the
bank can only be utilized towards unit assistance
and not for any other purpose - Funds under Total Sanitation Campaign (TSC) only
to be utilized for construction of latrine in
IAY house
19Funds released under Special Packages during
2008-09
- Rs. 412.91 crore were released as special package
for construction of 3.15 lakh houses in 33
districts worst affected by naxalite activities
in eight States of Andhra Pradesh, Bihar,
Chhattisgarh, Jharkhand, Madhya Pradesh,
Maharashtra, Orissa and Uttar Pradesh. All
districts availed II installments but
documents/clarification are still pending for
settlement of the case. - Rs. 20.61 crore were released as special package
for construction of 0.23 lakh houses in 14 border
area districts of Jammu Kashmir, Himachal
Pradesh, Arunachal Pradesh and Assam. Out of 14
districts 9 districts availed II installments
rest of five districts namely Dibang Valley and
Kurang Kurmey of Arunachal Pradesh and Jammu,
Kathua and Poonch of J K not availed II
Instalment. The documents in respect of 9
districts namely Anjaw of Arunachal Pradesh and
Leh, Jammu, Baramulla, Kupwada, Rajauri and
Kargil of Jammu Kashmir and Kinnaur , Lahul
Spiti of Himachal Pradesh who availed the II
Installments are still pending for settlement of
the case. - The documents pending in all the cases
mentioned above are Utilization Certificate (UC),
Audit Report (AR) Completion Certificate (CC)
20Funds released under Special Packages during
2008-09
- Rs. 99.00 crore were released as special package
for construction of 0.73 lakh houses in 15
Kala-azar affected districts of Bihar. Out of 15
districts only 6 districts availed II
Installments. The documents for settlement of the
case are still pending. - Rs. 35.25 crore were released as special package
for construction of 0.47 lakh houses for
primitive tribal groups in Andhra Pradesh,
Jharkhand, Rajasthan and West Bengal. Only 1
district of West Bengal namely West Medinapur
left to availed II Installments. All districts
availed II installments. The documents/clarificat
ion are still pending for settlement of the case.
- The documents pending in all the cases
mentioned above are Utilization Certificate (UC),
Audit Report (AR) Completion Certificate (CC)
21Documents Required for Claiming 2nd Instalment of
Special Package
- Separate UC/Audit Report alongwith physical
performance - Uploading of the data in separate MPRs
incorporated for online entry - DRDAs to claim 2nd instalment immediately if not
claimed so far
22Scheme for Allotting Homestead Plots Basic
Parameters
- Eligibility of Beneficiaries
- Should be a BPL household with neither land nor
house-site - Should belong to the Permanent IAY Waitlist
- Conditions for Purchase
- In the first instance States to regularize
presently occupied site - Otherwise States to allot suitable Government
Land - If not possible, private land to be purchased or
acquired
23 Scheme for Allotting Homestead Plots Basic
Parameters contd.
- Unit Assistance per Beneficiary
- For purchase/acquisition of 100-250 sq.mt.
- Rs. 10,000 or actual, whichever is less
- To be shared in ratio of 5050 with the States
- If amount falls short, balance amount to be
contributed by States - Incentivising States
- Additional funds under IAY to the extent of plots
allotted by way of regularization/allotment of
Govt land / purchase / acquisition
24Funds released under Homestead scheme
State Released for Homestead Sites (Rs. Crore) Released for Homestead Sites (Rs. Crore) Released as Incentive (Addl. Targets) (Rs. Cr)
2009-10 2010-11 2010-11
Andhra Pradesh 102.28 (22)
Bihar 53.34 (38)
Gujarat 124.80 (21)
Madhya Pradesh 180.10 (48)
Maharastra 25.00 (33)
Karnataka 54.00 (11) 60.82 (18) 53.67 (9)
Kerala 32.09 (14)
Rajasthan 17.21 (11) 161.50 (33)
Sikkim 0.83 (1)
Tripura 32.85 (4)
Uttar Pradesh 1.90 (48)
Figures in bracket denote No. of districts Figures in bracket denote No. of districts Figures in bracket denote No. of districts Figures in bracket denote No. of districts
25Quality of IAY Houses
- Decisions taken on the recommendation of Task
Force - House should be a pucca one with permanent walls
and permanent roofing and with walls constructed
with cement mortar - Type design should be prescribed by the States
States to train masons ensure availability of
material according to design - Application forms for DRI on consent of
beneficiaries to be filled up by the DRDAs - Technical supervision mandatory at foundation
roof laying stage - Cluster approach of villages may be followed for
better supervision - System of social auditing to be introduced
26Transparency Accountability
- Permanent IAY Waitlists
- MPR formats Online Monitoring
- Database of beneficiaries
27 Status of Permanent IAY Waitlists
- Waitlists prepared and painting completed
- Assam, Chhattisgarh, Gujarat, Jharkhand, Madhya
Pradesh, Nagaland, Punjab, Rajasthan, Tamil Nadu
Uttarakhand - Waitlists prepared but painting not completed
- Arunachal Pradesh, Goa, Mizoram, Sikkim, UP
Lakshadweep - Waitlists and painting near completion
- Bihar, HP, JK, Karnataka Maharashtra
- Waitlists still not prepared
- AP, Haryana, Kerala, Manipur, Meghalaya, Orissa,
Tripura, WB, AN, DD, DN Haveli Puducherry
28Online Monitoring MPR Formats
- Districts which are not reporting online MPR at
all
State District
Arunachal Pradesh Dibang Vally, East Kameng, Kurung Kurmey, Lohit, Lower Dibang Valley, Papun Pare, Tirap
J K Kulgam, Leh, Poonch, Baramula, Shopian, Srinagar
Manipur Bishnupur, Tamenglong, Ukhrul
West Bengal Darjeeling
D N Haveli D N Haveli
Lakshwadeep Lakshwadeep
Puducherry Puducherry
Daman Diu Daman Diu
29Districts which have not reported online MPR for
March, 2011
States Districts
Arunachal Pradesh Lower Subansiri, Upper Siang, Upper Subansiri
Himachal Pradesh Sirmaur
J K Badgam, Doda, Ganderbal, Pulwama
Maharashtra Gondia, Osmanabad,
Manipur Chandel, Churachandpur, Imphal West, Senapati
Meghalaya East Khasi Hills, Ri Bhoi,
Tripura South Tripura
Uttar Pradesh Kaushambi
West Bengal 24 Parganas North, Jalpaiguri, Murshidabad, Purba Medinipur, Siliguri
30Status of IAY-MIS
- Status of IAY-MIS Data of number of
beneficiaries uploaded
States No. States No.
Andhra Pradesh 8 JK 35
Arunachal Pradesh 37 Jharkhand 2152
Assam 61423 Karnataka 2
Bihar 9007 Kerala 597
Chhattisgarh 9296 MP 14039
Goa 1226 Maharashtra 10062
Gujarat, 284604 Manipur 1
Haryana 29742 Meghalaya 8009
Himachal Pradesh 5 Mizoram 673
31Status of IAY-MIS (Contd.)
- Status of IAY-MIS Data of number of
beneficiaries uploaded
States No. States No.
Nagaland 1 UP 798640
Orissa 306256 Uttarakhand 501
Punjab 5639 West Bengal 19714
Rajasthan 12398 A N Islands 76
Sikkim 1 Daman Diu 0
Tamil Nadu 78988 Dadra N.H 1
Tripura 7111 Puducherry 0
32Convergence with Differential Rate of Interest
(DRI) Scheme
- IAY beneficiaries eligible for loan of upto Rs.
20000 at 4 rate of - interest
- RBI has issued guidelines to public sector
banks - Off-take is extremely poor either due to poor
awareness among - the beneficiaries or due to lackadaisical
attitude of the banks - Up-loaded data shows that only 1948 and 60
beneficiaries in - Gujarat and Tamil Nadu respectively have
availed of this facility - Gujarat has succeeded to some extent due to
persistent - persuasion and follow-up with banks
- DRDA should pursue the issue with the lead bank
of the district - Beneficiaries should also be assisted in
approaching and getting - loan under this scheme from the banks
- Data in this regard should be regularly
uploaded in the MPR - format
33Convergence with Total Sanitation Campaign (TSC)
- IAY Guidelines stipulate convergence of IAY with
funds provided under Total Sanitation Campaign
(TSC) for providing sanitary latrines in IAY
houses - Deptt. Of Drinking Water Sanitation implements
TSC under which BPL beneficiaries are provided an
incentive of Rs. 2200 (Rs. 2700 in hilly
difficult areas) on construction of a sanitary
latrine - The latrine should be constructed within the
premises of the house - Presently the number of IAY beneficiaries
availing this incentive is very low - Authorities themselves are not aware of this
provision in many districts - Clause for deduction of Rs. 600 from IAY unit
assistance in case a beneficiary fails to
construct a toilet was deleted from IAY
guidelines w.e.f. February, 2006 - To reiterate the provision, a joint letter with
Deptt. Of Drinking Water Sanitation issued on
18th May, 2011 - Efforts should be made for awareness generation
of the beneficiaries to ensure that they
construct and use toilet after availing the
incentive amount under TSC
34Convergence with other schemes
- IAY stands converged with other schemes such as
provision of Smokeless Chullahs, Rajiv Gandhi
Gramin Vidutikaran Yojana, Life Insurance Scheme,
Health Insurance Scheme, MGNREGA etc - Uploaded data shows a miniscule number of
beneficiaries availing the benefits available on
account of these convergence - DRDAs should be pro-active in creating much
greater degree of awareness among the
beneficiaries of such benefits available to them
35Issues for Discussion
- Cost of unit assistance under IAY is considered
insufficient keeping in view the overall increase
in construction materials and labour. - Inspite of continuous monitoring, permanent IAY
waitlists are still not finalized /painted in
many States/UTs - It must be ensured that targets fixed for each
category are achieved. - DRDAs should work actively with IAY beneficiaries
and provide required technical information about
disaster resistant construction of the house as
well as low-cost /environment friendly
technologies. - DRDAs to ensure that the IAY beneficiaries get
benefits under the Schemes converged with IAY
especially the benefit under TSC. - Uploading of IAY beneficiaries data is very slow
and may be speeded up. - Some of the UTs are not reporting the
physical/financial performance online . It may be
ensured that the data is submitted online by the
UTs as non-uploading of data by some of the UTs
has resulted in decreased achievement of target
in the RFD.