Title: WOODFUEL FOR THE CONSTUCTION INDUSTRY


1
WOODFUEL FOR THE CONSTUCTION INDUSTRY
  • Architects Point of View
  • Building Regulations

2
Wood as a fuel
  • Multi use of wood fire in the home
  • Wood fire one of longest standing forms of
    heating in human history
  • Simple wood fired room heaters to supplement
    central heating independence
  • Burning wood logs gives connection to nature
    sense of belonging
  • Burning wood can reduce the potential impact of
    global warming and dependence when compared to
    fossil fuels.

3
Considerations for the designer
  • Advantages of wood fuel
  • House design
  • Wood storage

4
Context
  • Context with better performance building
  • 4 primary design parameters - They are solar
    orientation, insulation, air tightness and
    thermal mass.

5
General Categories
  • 1. New Build Single House Primary Heat
    Source
  • Stott House Log cooker ( Rayburn)
  • Pellet boiler
  • Pellet Stove
  • Logs stove with back boiler
  • 2. Single retrofit to thermally inefficient
    building
  • Parrot Gasification log boiler
  • 3. Larger single structure
  • Extension to FCS Office Dingwall Wood Chip
    boiler with bulk storage
  • 4. Larger group houses / mixed use
  • Servite Pellet boiler with accumulator
  • tank hopper
  • All above require different approaches

6
Costs
  • The capital cost of wood-fuel system V Lifetime
    running cost
  • Boiler room and fuel store size
  • Installation Costs
  • Grants and Incentives www.rhincentive.co.uk

7
Potential Cost Savings on fuel
  • Peak electricity 13p per KW/h
  • 1 litre oil on average 60KW/h of energy 6p
    per KW/h
  • 1 tonne pellets 4800 KW/h of energy 3p per
    KW /h
  • ( based on 160 a tonne, min 4 tonne delivery
    from Balcas)

8
System comparisons
  • Room Heater stove of feature stove boiler
  • Hopper Capacity 15 53kg
  • Average Refill Time 1-2days
  • Boiler Location internally
  • Average approximate cost - 2000 - 7000
  • Fed manually with pellets.
  • Gasification Log Boiler
  • Hopper Capacity 180kg
  • Average Refill Time dependant on size of
    thermal store
  • Boiler Location utility / garage / shed
  • Average approximate cost - 11000
  • Fed manually with wood logs
  • Stove boiler
  • Hopper Capacity 70 180kg
  • Average Refill Time 2-3days
  • Boiler Location utility / garage
  • Average approximate cost - 5500
  • Fed manually with pellets.
  • Pellet boiler with bulk storage
  • Hopper Capacity 3 6 tonnes
  • Average Refill Time 6 months a year
  • Boiler Location utility / garage / shed
  • Average approximate cost - 15000
  • Fed suction / auger, pellets fed from lorry.

9
(No Transcript)
10
(No Transcript)
11
Potential C02 Savings
  • Section 6.1 of the Building Regulations
  • CO2 emissions per kilowatt
  • - hour (g/kWh)
  • Wood fuel 25
  • Wind energy 8
  • Gas 194
  • Oil 265
  • Coal 291

12
Boiler Selection
  • Space
  • Size of fuel store
  • Access
  • Fuel supply
  • Efficiency
  • Operation and maintenance

13
(No Transcript)
14
Bulk storage of woody biomass fuel
  • Consideration of storage requirements at early
    stage in design process
  • Design must allow for
  • Access for large eight wheeled vehicles
  • Direct delivery into store by tipping / vacuum
  • Fuel storage for up to 50m3 chip / 4 tonne
    pellet in one delivery
  • Design must avoid
  • The need for one off specialist vehicles
  • Small fuel stores requiring constant refuelling
    this adds s to the fuel cost.
  • Two stage handling ie chipping and then filling
    the fuel store.
  • Bulk handling takes time and costs money
  • Storage provision relative to number of
    deliveries.
  • Storage space from building
  • Storage Protection

15
Building Regulations
  • The following works require a building warrant
  • A building exceeding 8m2 in area.
  • A building containing a flue, a fixed combustion
    appliance installation does require a building
    warrant
  • Any work associated with a solid fuel appliance
    having an output rating more than 50 kW
  • Any work associated with a chimney, flue-pipe or
    constructional hearth.
  • For example
  • 1. If retro fitting a wood fuel stove or boiler
    into an existing house this will require a
    warrant as the work will involve fitting a flue
    unless there is an existing chimney that could be
    used.
  • 2.Similarly a small dedicated external boiler
    room with hopper will require a warrant as they
    may be over 8m2 and will contain fixed combustion
    appliances and flues.
  • 3.Replacing an existing boiler with stove with
    one of the same kind will not require a warrant. 

16
  • See guidance note for further info from the
    Domestic 2009 building regulations
  • Storage of woody biomass fuel - accommodation
    safety
  • Storage vessels, pipework and controls
  • Chimney Hearth Design
  • Air Supply / Extraction
  • Ventilation
  • Distances to combustible materials
  • Commissioning Installation
  • Building regulations also apply to other aspects
    of the work such as electrical installation and
    plumbing work in connection with the system

17
CASE STUDY 01 Single New Build thermally
efficient 2 bedroom house, Farr, Inverness
  • Boiler Specification Rayburn solid fuel Heat
    ranger 355 SFW for cooking / domestic hot water
    and central heating.
  • Fuel Type Wood log manual feed
  • Output 12kW
  • Efficiency 85
  • Accumulator tank 250 litre internally housed
  • Fuel Delivery On site
  • Wood-fuel Store capacity External log wood shed.
  • Back Up System 4.4m2 solar collector immersion
  • CO2 emissions 0.4 tonnes per year

18
CASE STUDY 02 Single house -retrofit to
thermally inefficient building
  • Batch burning, quick burst and trap energy in
    accumulator tank
  • Boiler Specification Baxi Log Boiler
  • Fuel Type Wood Logs -Manual feed
  • Output 50KW
  • Efficiency 90
  • Accumulator tank 2500 litre
  • Woodfuel Store capacity 3m3
  • Boiler Housed Timber Outbuilding

19
(No Transcript)
20
CASE STUDY 03 Extension to FCS Office
Dingwall, Wood Chip Heating supplies 2 no heating
circuits hot water to building
  • Boiler Specification Froeling Turbomatic Wood
    Chip Boiler
  • Fuel Type Pellet Wood Chips
  • Output 35kW
  • Efficiency 90
  • Accumulator tank 1500 litre
  • Woodfuel Store capacity 30m3
  • Back Up System Existing Oil boiler
  • Boiler Housed Externally

21
(No Transcript)
22
CASE STUDY 04 Servite Housing Association (32
dwellings).
  • Achieved a prestigious "Excellent" rating for
    sustainability, achieving the highest score in
    Scotland in areas of sustainability including
    energy CO2 performance.
  • Boiler Specification 3no Okofen 56KW
  • Fuel Type Pellet Wood Pellets
  • Output 56kW each
  • Efficiency 90
  • Accumulator tank 3no 2000litre
  • Wood fuel Store capacity 6 tonnes per hopper
  • Back Up System If one boiler goes down then the
    other two are linked to circuit until fixed.

23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)