Title: TRACECA PROJECT EVALUATION
1TRACECA PROJECT EVALUATION
2PROJECT PROPOSAL IN TRACECA CONTEXT
Tg. Mures Iasi - Ungheni Motorway section
3Tg. Mures Iasi Ungheni
The section is going to be part of the extended
TEN T and in the same time part of traceca
corridor Romania has got a strategyc position,
linking Europe with TRACECA countries.
SERBIA SI MUNTENEGRU
Proposed TEN T projects Existing TEN T
projects Intermodal interchange
4Regional Criteria
- Network description
- The motorway section Targu Mures Iasi -
Ungheni/ border with Republic of Moldova - is placed in the North - eastern part of Romania,
connecting the central part of the country with
the Romanian/ Moldavian border - the section is also connecting 2 PanEuropean
Corridors no. IV and no. IX, having the following
indirect benefits connects Bulgaria to Hungary
(Partly through Pan European Corridor no IX and
partly through Transilvania motorway) and in the
same time with the existing national
infrastructure - it is also considered to be an exit to Ukraine,
using the national road infrastructure
Tg. Mures Iasi Ungheni
Connection with Transilvania motorway
Pan European Corridor no. IX
Pan European Corridor no. IV
5- How is interoperability and connection with other
infrastructures handled? - Having a direct link to Moldavian Border will be
the main reason to attract the traffic flow from
Bulgaria, to Romania and further to the Republic
of Moldova or to Hungary, route which will be
fully operational after finalizing the Corridor
no. IV Nadlac (Hu/ Ro cross border) Arad
Timisoara Lugoj Deva Orastie Sibiu
Pitesti Bucuresti Cernavoda Constanta, the
Pan European Corridor no IX and Transilvania
motorway. - The location of the future motorway sections is
also a benefit for the regional development along
the Moldavian/ Romanian cross-border, the
economic environment could be stimulated and
eligible for European Regional Funds.
Tg. Mures Iasi Ungheni
6- Technical DescriptionDesign speed 130
km/hLength aprox. 310 kmMotorway
cross-sectionplatform 26.00 m carriageway -
4 x 3.75 m middle lane 3.00 m Emergency lane
- 2x2.50 m shoulders - 2 x 0.50 m employment
bands - 4x 0.50 m parapets space (outside the
platform) 0.75 mCross-section for link
roadscarriageway - 2 x 3.50 m shoulders - 2 x
1.00 m, out of which employment bands - 2 x 0.50
m platform - 10.00 m. - Land acquisitionEstimated area of expropriation
for the entire highway route - represents terrain
and built settlements.
7Regional Development
Turistical opportunities to see the national and
international patrimony of the area churches,
castles, monuments Mountain sports
8EconomicDevelopment
Stimulate the development of Wood Ceramics
Manufacture, Agriculture, Wine industry, others
9Economic Criteria
- Estimated project repayment time - At 10 years to
cover the initial costs - Forecast years
- At least 3 years for construction, based on the
experience of similar contracts the length will
be divided into 3 sectors Tg. Mures Ditrau
Tg. Neamt - Ungheni - Investment costs 6. 096 mil. Euros
- - costs for development of design documentation
(feasibility study, feasibility study,
engineering design, details of execution)-
expenses for consultancy and technical
assistance- Costs associated with obtaining
necessary approvals and agreements in principle
for the investment- Expenses for training
documents on the procedure for awarding the
contract- construction costs
Tg. Mures Iasi Ungheni
Tg. Neamt
Ungheni
Tg. Mures
Ditrau
10- Financial Rate of Return of the Investment and
the cost break down will be established after
the Feasibility Study will be finished. - Private investors interest in the project until
now, during the bilateral meetings at high level,
a lot of investors from European and Asian
countries had shown interest for this project
implementation. - PPP laws Romania has recently approved the Law
which rules the PPP project.
11Technical Criteria
- Link or node or upgrade?
- The present alternative considered to be viable
is the national road network, which goes toward
the cross border point with the Republic of
Moldova, national road considered not to be able
to comply with present traffic needs. - By implementing this project, there will be
offered to the road users a better level of
accesibility, speed, traffic safety, confort
because of the auxiliary services offered by a
motorway - Intermodality
- The quickest link to the Eastern border with the
Republic of Moldova, and further on to Hungary
through Transilvania Motorway and to Bulgaria
through a part of Transilvania Motorways and a
part of Pan European Corridor no. IX. - The link, through the motorway network, existing
or future, with Constanta Multimodal Terminal - The link with the integrated transport system
(Danube river) - Modal shift there is currently available the
RO-LA technology, in the multi modal links Tg.
Mures, Iasi and Ungheni. - Safety
- the technical requirements, starting from the
design stage, will impose the safety geometrical
elements, in line with best design
technologies - Travel cost saving
- the motorway section will have high standards,
according to TEM motorway standard modern,
European, economical, for the same price, which
is the Romanian vignette - Travel time savings
- the travel distance is reduced with 25 and
travel time with 30
12Environmental Criteria
- Pollution
- Reducing the noise gas emission
- Energy consumption will be reduced due to the
continuous flows of traffic, to the decrease of
the travel time and the time spent in the cross
border point - Diversion from sensible areas (living areas,
preserving natural resources, others) - The traffic flow will be taken out of cities
Greener transport - Creating eco ducts in order to protect the fauna
13Political Criteria
- When to start?
- after the Feasibility Study is finished (1st
Semester of 2012) and the financing resources
necessary for the construction will be
identified. - Government Support
- The project is included into Romanian transport
strategy for PPP projects - Part of the Romanian Master Plan, Fiscal Strategy
for the next 5 years. - Dependance on other step/project
- No dependency
14- Thank you for the attention!