1
TRACECA PROJECT EVALUATION
2
PROJECT PROPOSAL IN TRACECA CONTEXT
Tg. Mures Iasi - Ungheni Motorway section
3
Tg. Mures Iasi Ungheni
The section is going to be part of the extended
TEN T and in the same time part of traceca
corridor Romania has got a strategyc position,
linking Europe with TRACECA countries.
SERBIA SI MUNTENEGRU
Proposed TEN T projects Existing TEN T
projects Intermodal interchange
4
Regional Criteria
  • Network description
  • The motorway section Targu Mures Iasi -
    Ungheni/ border with Republic of Moldova
  • is placed in the North - eastern part of Romania,
    connecting the central part of the country with
    the Romanian/ Moldavian border
  • the section is also connecting 2 PanEuropean
    Corridors no. IV and no. IX, having the following
    indirect benefits connects Bulgaria to Hungary
    (Partly through Pan European Corridor no IX and
    partly through Transilvania motorway) and in the
    same time with the existing national
    infrastructure
  • it is also considered to be an exit to Ukraine,
    using the national road infrastructure

Tg. Mures Iasi Ungheni
Connection with Transilvania motorway
Pan European Corridor no. IX
Pan European Corridor no. IV
5
  • How is interoperability and connection with other
    infrastructures handled?
  • Having a direct link to Moldavian Border will be
    the main reason to attract the traffic flow from
    Bulgaria, to Romania and further to the Republic
    of Moldova or to Hungary, route which will be
    fully operational after finalizing the Corridor
    no. IV Nadlac (Hu/ Ro cross border) Arad
    Timisoara Lugoj Deva Orastie Sibiu
    Pitesti Bucuresti Cernavoda Constanta, the
    Pan European Corridor no IX and Transilvania
    motorway.
  • The location of the future motorway sections is
    also a benefit for the regional development along
    the Moldavian/ Romanian cross-border, the
    economic environment could be stimulated and
    eligible for European Regional Funds.

Tg. Mures Iasi Ungheni
6
  • Technical DescriptionDesign speed 130
    km/hLength aprox. 310 kmMotorway
    cross-sectionplatform 26.00 m carriageway -
    4 x 3.75 m middle lane 3.00 m Emergency lane
    - 2x2.50 m shoulders - 2 x 0.50 m employment
    bands - 4x 0.50 m parapets space (outside the
    platform) 0.75 mCross-section for link
    roadscarriageway - 2 x 3.50 m shoulders - 2 x
    1.00 m, out of which employment bands - 2 x 0.50
    m platform - 10.00 m.
  • Land acquisitionEstimated area of expropriation
    for the entire highway route - represents terrain
    and built settlements.

7
Regional Development
Turistical opportunities to see the national and
international patrimony of the area churches,
castles, monuments Mountain sports
8
EconomicDevelopment
Stimulate the development of Wood Ceramics
Manufacture, Agriculture, Wine industry, others
9
Economic Criteria
  • Estimated project repayment time - At 10 years to
    cover the initial costs
  • Forecast years
  • At least 3 years for construction, based on the
    experience of similar contracts the length will
    be divided into 3 sectors Tg. Mures Ditrau
    Tg. Neamt - Ungheni
  • Investment costs 6. 096 mil. Euros
  • - costs for development of design documentation
    (feasibility study, feasibility study,
    engineering design, details of execution)-
    expenses for consultancy and technical
    assistance- Costs associated with obtaining
    necessary approvals and agreements in principle
    for the investment- Expenses for training
    documents on the procedure for awarding the
    contract- construction costs

Tg. Mures Iasi Ungheni
Tg. Neamt
Ungheni
Tg. Mures
Ditrau
10
  • Financial Rate of Return of the Investment and
    the cost break down will be established after
    the Feasibility Study will be finished.
  • Private investors interest in the project until
    now, during the bilateral meetings at high level,
    a lot of investors from European and Asian
    countries had shown interest for this project
    implementation.
  • PPP laws Romania has recently approved the Law
    which rules the PPP project.

11
Technical Criteria
  • Link or node or upgrade?
  • The present alternative considered to be viable
    is the national road network, which goes toward
    the cross border point with the Republic of
    Moldova, national road considered not to be able
    to comply with present traffic needs.
  • By implementing this project, there will be
    offered to the road users a better level of
    accesibility, speed, traffic safety, confort
    because of the auxiliary services offered by a
    motorway
  • Intermodality
  • The quickest link to the Eastern border with the
    Republic of Moldova, and further on to Hungary
    through Transilvania Motorway and to Bulgaria
    through a part of Transilvania Motorways and a
    part of Pan European Corridor no. IX.
  • The link, through the motorway network, existing
    or future, with Constanta Multimodal Terminal
  • The link with the integrated transport system
    (Danube river)
  • Modal shift there is currently available the
    RO-LA technology, in the multi modal links Tg.
    Mures, Iasi and Ungheni.
  • Safety
  • the technical requirements, starting from the
    design stage, will impose the safety geometrical
    elements, in line with best design
    technologies
  • Travel cost saving
  • the motorway section will have high standards,
    according to TEM motorway standard modern,
    European, economical, for the same price, which
    is the Romanian vignette
  • Travel time savings
  • the travel distance is reduced with 25 and
    travel time with 30

12
Environmental Criteria
  • Pollution
  • Reducing the noise gas emission
  • Energy consumption will be reduced due to the
    continuous flows of traffic, to the decrease of
    the travel time and the time spent in the cross
    border point
  • Diversion from sensible areas (living areas,
    preserving natural resources, others)
  • The traffic flow will be taken out of cities
    Greener transport
  • Creating eco ducts in order to protect the fauna

13
Political Criteria
  • When to start?
  • after the Feasibility Study is finished (1st
    Semester of 2012) and the financing resources
    necessary for the construction will be
    identified.
  • Government Support
  • The project is included into Romanian transport
    strategy for PPP projects
  • Part of the Romanian Master Plan, Fiscal Strategy
    for the next 5 years.
  • Dependance on other step/project
  • No dependency

14
  • Thank you for the attention!
  • ROMANIAN TRACECA NATIONAL SECRETARIAT
  • traceca_at_mt.ro
  • National Secretary mr. Ionut LACUSTA
  • LETS SHAKE HANDS FOR TRACECA DEVELOPMENT!