Case Study 1 Styner/Lauder Intersection Moscow, Idaho - PowerPoint PPT Presentation

About This Presentation
Title:

Case Study 1 Styner/Lauder Intersection Moscow, Idaho

Description:

Case Study 1 Styner/Lauder Intersection Moscow, Idaho Problem: Should the intersection of U.S. 95 and Styner/Lauder be converted from two way stop control to signal ... – PowerPoint PPT presentation

Number of Views:76
Avg rating:3.0/5.0
Slides: 26
Provided by: kenco56
Category:

less

Transcript and Presenter's Notes

Title: Case Study 1 Styner/Lauder Intersection Moscow, Idaho


1
Case Study 1Styner/Lauder IntersectionMoscow,
Idaho
2
Problem Should the intersection of U.S. 95 and
Styner/Lauder be converted from two way stop
control to signal control?
Overview
  • Learning skills
  • Apply HCM analysis procedures for interrupted
    flow facilities.
  • Know common input requirements and default
    values.
  • Select an appropriate analysis procedure
  • Understand HCM analysis limitations
  • Know how to reasonably interpret the results

3
Introduction
  • Moscows population is about 21,000
  • U.S. 95 is the primary north-south state highway
    in Idaho
  • ADT on U.S. 95 is between 15,000 and 23,000 vpd
  • Average annual traffic growth is about two
    percent per year

4
Introduction
5
Introduction
SH 8
US 95
Sweet
Lauder
Styner
6
Introduction
  • What issues do you think should be considered by
    the state's traffic engineer in resolving this
    problem?
  • City residents have asserted that increasing
    traffic volumes at the intersections of Styner
    Avenue, Lauder Avenue, and U.S. 95 are increasing
    delays for and reducing the safety of motorists
    traveling through the intersection.
  • The city has requested that the Idaho
    Transportation Department signalize the
    intersection.
  • What issues do you think should be considered by
    the state's traffic engineer in resolving this
    problem?

7
Issues to consider
Getting Started
  • Scope of the analysis?
  • Stakeholders?
  • Goals?
  • Performance measures?
  • Tools?
  • Data?
  • Technical Issues?

8
Questions to be Answered
Problem 1 U.S. 95/Styner-Lauder Avenue
  • What is the level of service at the existing TWSC
    intersection at U.S. 95/Styner-Lauder?
  • What would the level of service be if the
    intersection were signal controlled?
  • What would the level of service be at the
    intersection under future projected traffic
    conditions?

9
Analyses to be Undertaken
Problem 1 U.S. 95/Styner-Lauder Avenue
  • Sub-problem 1a. Analysis of the existing TWSC
    intersection
  • Sub-problem 1b. Analysis of the proposed
    signalized intersection
  • Sub-problem 1c. Analysis of future conditions

10
Step 1. Setup analysis of existing TWSC
Sub-Problem 1a Analysis of existing TWSC
intersection
  • Which tool or tools from the HCM should be used
    for the analysis of a TWSC intersection?
  • What data are required for the analysis?
  • What default values should be used?
  • What time periods should be analyzed?
  • What measure should be used to determine the
    performance of the intersection?
  • What other factors should be considered?

11
Sub-Problem 1a Analysis of existing TWSC
intersection
US 95
Lauder
Styner
12
Step 2. Results
Sub-Problem 1a Analysis of existing TWSC
intersection
13
Step 2. Results (cont.)
Sub-Problem 1a Analysis of existing TWSC
intersection
14
Step 2. Results (cont.)
Sub-Problem 1a Analysis of existing TWSC
intersection
Intersection delay and LOS?
15
Step 1. Setup analysis of signal control
Sub-Problem 1b Analysis of proposed signalized
intersection
  • Which tool or tools should be used for this
    analysis?
  • What data are required for the analysis?
  • What default values should be used?
  • What time periods should be analyzed?
  • How do we construct a signal timing for a
    proposed traffic signal using the HCM?

16
Step 2. Results
Sub-Problem 1b Analysis of proposed signalized
intersection
17
Step 1. Setup analysis of future conditions
Sub-Problem 1c Analysis of future conditions
  • What is the appropriate future year for this
    analysis?
  • Which default values should be used for this
    future analysis?
  • What other factors should be considered?

18
Step 2. Results for TWSC control
Sub-Problem 1c Analysis of future conditions
19
Step 2. Results for signal control
Sub-Problem 1c Analysis of future conditions
20
What if our volume assumptions are uncertain?
Sub-Problem 1c Analysis of future conditions
21
Graphical presentation of results
Sub-Problem 1c Analysis of future conditions
22
Graphical presentation of results
Sub-Problem 1c Analysis of future conditions
23
Problem 1 Analysis
24
Problem 1 Discussion
25
End of Problem 1
Write a Comment
User Comments (0)
About PowerShow.com