Cross section - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

Cross section

Description:

Cross section Inner Core Ring Road KARNATAKA DIASPORA CELL To forge a symbiotic relationship between Karnataka and its Diaspora. To provide information on ... – PowerPoint PPT presentation

Number of Views:605
Avg rating:3.0/5.0
Slides: 25
Provided by: kumbangal
Category:

less

Transcript and Presenter's Notes

Title: Cross section


1
Cross section Inner Core Ring Road
2
BOT Projects on offer
  1. Redevelopment of Malleshwaram Market US 15
    million
  2. Automated Car Park at Gandhinagar US 2.5
    million
  3. Kalasipalyam Bus Stand cum Commercial Complex
    US 6.25 million
  4. Redevelopment of Puttanna Kanagal Theatre at
    Jayanagar US 7.5 million
  5. Commercial Complex cum Mall at Koramangala US
    10 million
  • Salient features
  • All Projects located in the heart of the city
  • Having high commercial land value
  • BMP offers land on BOT basis for upto 30 years
  • Full flexibility to investors to participate in
    developing projects of Public Importance

3
Peripheral Ring Road
  • Peripheral Ring Road (PRR) around Bangalore city
    to decongest the city traffic
  • Construction is proposed in two phases
  • Phase 1 Tumkur Road to Hosur Road crossing
    Bellary Road, Old Madras Road, Varthur Road and
    Sarjapur Road Length 65kms
  • Phase 2 Hosur Road to Tumkur Road crossing
    Kanakapura Road, Mysore Road and Magadi Road
    Length 51kms

4
Peripheral Ring Road
Bellary Road (NH-7)
Tumkur Road (NH-4)
Old Madras Road (NH-4)
Magadi Road
Hosur Road (NH-7)
Mysore Road
Proposed Peripheral Ring Road
Kanakapura Road(NH-209)
5
Peripheral Ring Road Salient Features
  • Total length of PRR 116 kms with Right of Way
    100 m
  • Land required 2825 acres
  • 8 lanes divided dual carriageway with service
    roads of 3 lanes on either side
  • Central median of 12m with a provision for Metro
    / Mono rail and buffer zones of 14m between
    service road and main carriageway
  • Provision for longitudinal drains in the buffer
    zones and along the edges of the service road on
    both sides
  • All major junctions across National Highways and
    State Highways are proposed with interchanges to
    have signal free corridor

6
Peripheral Ring Road Salient Features
  • Major Bridges / ROB / RUB proposed across major
    Nalas and Railway lines
  • Pedestrians / cattle passes proposed at all
    villages and minor road crossings
  • Road furniture's include street lighting for both
    main carriageway and service roads, lane marking,
    signage
  • Arboriculture development in the buffer zones and
    landscaping in central median
  • Service and utility ducts are proposed along both
    the service roads

7
Peripheral Ring Road Project Cost
  • Phase 1 Construction US 400 million
  • Phase 2 Construction US 268 million
  • Total construction cost US 668 Million
  • Period of construction 3 years
  • Project is approved by Bangalore Development
    Authority

8
B M R Ring Road Network
  1. Satellite Towns Ring Roads (STRR) 204 kms, 90
    metres Connecting towns around Bangalore city
    to each other and to International Airport
  2. Intermediate Ring Roads (IRR) 160 kms, 90
    metres Connecting industrial residential
    developments around Bangalore city to each other
    and to International Airport
  3. Radial Roads 180 kms, 60 metres Radiating
    from Bangalore city connecting BMR Satellite
    Town Ring Roads BMR Intermediate Ring Roads
    to the Peripheral and Outer Ring Roads
  4. Town Ring Roads Around important towns in
    Bangalore Rural district viz. Anekal (24Km),
    Kanakapura (25Km), Ramanagara (24Km), Magadi
    (15Km), Nelamangala (32Km), Doddaballapura
    (23Km), Devanahalli (24Km) and Hosakote (28Km)
  5. New Airport Express way Radiating from Outer
    Ring Road of Bangalore city and connecting New
    International Airport near Devanahalli and
    providing onward connectivity to NH 207 / BMR-
    STRR

9
Satellite Town Ring Road
Offers to Investors
1 North Package 1 Dobbaspet Doddaballapura Devanahalli (58Km)
2 North Package 2 Devanahalli Hoskote Attibele (67Km)
3 South Package 1 Attibele Anekal Kanakpura Ramnagar (97Km)
4 South Package 2 Ramnagar to Dobbaspet (75Km)
10
Investment Opportunities in Townships
In Acres
Sl. No. Townships Pvt. land Govt. land Total
1. Nandagudi 13,762 4,745 18,507
2. Solur 9,661 2,864 12,525
3. Ramanagara 3,621 392 4,013
4. Bidadi 6,959 2,725 9,684
5. Sathanur 5,891 10,341 16,232
Total 39,894 21,067 60,961
1
2
3
4
5
11
Status of Township Projects
Bidadi Investment Size INR 35 Bn (USD 775 Mn) Being implemented through PPP with M/s. DLF Consortium
Ramanagara Investment Size INR 15 Bn (USD 330 Mn) To be offered through bid route soon after Bidadi Township is awarded to eligible Investor Consortium
Sathanur Investment Size INR 60 Bn (USD 1330 Mn)
Solur Investment Size INR 45 Bn (USD 1000 Mn)
Nandagudi Investment Size INR 66 Bn (USD 1465 Mn)
12
Airport Expressway Project
  1. Connecting Outer Ring Road to upcoming
    International Airport
  2. Distance 26 Kms
  3. Width 60 Mtrs
  4. Investment size Will be known after
    techno-feasibility study is completed

13
Express Rail Link to Bangalore Airport
  • Estimated Project Cost US 200 Million
    (including cost of land and rolling stock)
  • 25 30 year concession under PPP model
  • Route length approx. 30 kms
  • Byappanahalli New International Airport
  • Estimated travel time 30 minutes
  • Estimated fare for one-way trip US 8.75
    (2008-09)
  • Check-in facility at city-end terminal
  • Detailed Project Studies under way

14
Express Rail Link to Bangalore Airport
15
Intermodal Transit Center at Bangalore
KSRTC and BMTC propose to jointly develop the
existing Kempegowda Bus Terminal at Subhashnagar
into an Intermodal Transit Center through Private
Sector Participation on BOT basis
Objectives
  • Welcome gate which will become the new focus
    for the city
  • State of the art / modern terminal infrastructure
    facilities, amenities, services and conveniences
  • integration of the terminals with the proposed
    mass transit system and City Railway Station
  • Commercial development

Site area 31 acres Estimated cost US 200
Million
Request for qualification process completed
16
OTHER PROJECTS
  • Projects on offer - BOT basis
  • Improvement of Dharwad-Alnawar-Ramanagar road
    Rs.173.00 crores
  • Express way from outer ring road to International
    Airport Rs.1000.00 crores.
  • Improvements of Chikkanayakanahalli
    Tiptur-Hassan road Rs.207.00 crores.
  • Improvements of State High way SH 10 from
    Maharastra border to Andhra Pradesh border in
    Gulbarga District -
  • 2nd Stage of Modern Deep sea port at Karwar -
    Rs.500.00 crores.

17
Tourism Projects on Offer
  • Department of Tourism intends to develop tourist
    facilities ( resorts ) at various tourist
    locations
  • Development of Mines Tourism at Kolar Gold Fields
  • Development of Sound and Light Show at various
    tourist locations
  • Redevelopment of Tourism Properties of KSTDC

18
Eco Tourism Projects in Karnataka
Nodal Agency Jungle Lodges Resorts
(JLR) Development of 10 new eco-tourism
destinations with themes in the State. Presently
JLR has identified about 4 locations (Almatti,
Bonal tank, Jog Falls, Desur) for
development Estimated redevelopment cost of
around US 3 million ( for
4 locations ) The proposal envisages development
of these projects either as a management
arrangement or on long-term BOT
concessions Facilities such as water sports,
trekking, fishing, hang-gliding etc to be provided
19
KARNATAKA DIASPORA CELL
OBJECTIVES
  • To forge a symbiotic relationship between
    Karnataka and its Diaspora.
  • To provide information on Karnataka, developments
    and investment opportunities in the State across
    all potential sectors.
  • To facilitate investors among NRKs (Non-Resident
    Kannadigas) and PKOs (People of Karnataka Origin)
    in setting up their ventures in the State.
  • To draw up the knowledge reservoir of Diaspora
    for development of the State.
  • To promote Karnatakas culture and heritage
    overseas.
  • To Act as window to provide information to
    Diaspora about education facilities, health
    facilities available in Karnataka and other
    information of interest to the Diaspora.

20
Investing in India
  • Foreign Direct Investments (FDI) are approved
    through 2 routes
  • Automatic Approval by Reserve Bank of India (RBI)
    for nearly 60 categories time taken
    2 weeks
  • Foreign Investment Promotion Board (FIPB) Route
    for cases not covered under automatic approval
    time taken 4 to 6 weeks

21
Facilitating Investments - Catalyzing Growth
Karnataka Udyog Mitra
22
Investing in Karnataka The Approval Mechanism
Single Window Approach
State High Level Clearance Committee (SHLCC)
chaired by the Chief Minister For Investments
above US 12.5 Million
State Level Single Window Clearance Committee
(SLSWCC) For Investments between US 0.75 and
US 12.5 Million
Karnataka Udyog Mitra Single Point Contact Point
for Investors acts as a secretariat for the above
committees
23
For Further Details, Contact
K.M.Shivakumar, IAS Principal Secretary, Commerce
and Industries Department Vikasa Soudha,
Bangalore 560 001. Phone 080-22252443
Fax 080-22259870 E-mail prs-ci_at_karnataka.gov.in
Dr. Raj Kumar Khatri, IAS Director of Industries
Commerce and Commissioner for Industrial
Development Phone 91 80 22386796. Fax 91
80 22389909. E-mail commissioner_at_karnatakain
dustry.gov.in
Managing Director , KARNATAKA UDYOG MITRA Khanija
Bhavan, 3rd Floor, South Wing, 49, Race Course
Road, Bangalore-560 001, India. Ph 91-80-2228
2392, 2228 5659, 2238 1232, 2228 6632 Fax
91-80-2226 6063. e-mail md_at_kumbangalore.com
Website www.kumbangalore.com
24
Thank You
Write a Comment
User Comments (0)
About PowerShow.com