1
Program
  • Introduction
  • MDT Chamber Production
  • Silicon Tracker Project
  • Software Physics

Frank Linde (15) Marcel Vreeswijk (25) Nigel
Hessey (25) Stan Bentvelsen (30)
  • Laboratory Tour
  • MDT production line (20)
  • SCT area (20)
  • Lunch

Peter Jenni _at_ NIKHEF, 22-June-2001
2
ATLAS/D0 in Amsterdam Nijmegen
  • ATLAS contributions
  • Muon Spectrometer (hardware)
  • End Cap Toroids
  • MDT Chambers
  • Alignment
  • Detector Control
  • MDT Read-Out Driver
  • Silicon Tracker (hardware)
  • 100 modules
  • Disc design
  • Assembly test of one complete end cap
  • Trigger DAQ (hard- software)
  • RD participation

3
End Cap Toroids
4
Muon-Spectrometer Alignment
Alignment Key issue RASNIK 3-point
monitor Status Sensors delivered to MDT sites
DAQ prototyped Outstanding Radiation tolerance
of the multiplexers Difficulties Cost
(mechanics!) lens quality
Many other interested parties
5
Muon-Spectrometer Detector Control
Detector control (NIKHEF/CERN RD
collaboration) Key issue Modular CAN CPU with
many sensor types precise Hall
B-sensors cheap T-sensors, Status Being
delivered to MDT sites Outstanding Radiation
tolerance of the CAN CPUs
Used also by D0, Saclay, CMS(?), LAr (H8),
6
(Muon-Spectrometer) Read-Out Driver
Read-Out Driver Difficulty Cost (RODCSM
doubles CORE) Status RD phase Test bed cosmic
ray set-up
7
Trigger DAQ

spreadsheet computer model ROBs, networks
LVL2 processor farm
design studies of MDT-ROD/ROS MDT-ROD
construction
online software DCS software
November 2001 Trigger, DAQ DCS week _at_ NIKHEF
8
Summary
  • ATLAS efforts on realization of CORE commitments
  • (We realize our participation in ATLAS physics
    studies is not in line with our ambition )
  • Muon Spectrometer
  • End cap Toroids
  • Vacuum vessels progressing well (minor delays)
  • Coil winding company claims cost overruns
  • MDT chamber construction
  • RD basically completed (and it took a lot of
    time)
  • Huge serial production effort in 2001-2005
  • Alignment, Detector Control MDT Read-Out
    Drivers
  • Completed or near completion
  • Point of concern radiation tolerance
  • Silicon Tracker
  • Design closure urgently required (else we get
    squeezed)
  • Significant assembly test effort in 2002-2003/4