Title: Water Power Peer Review
1Water Power Peer Review
Risk Analysis of the Potential Ecological Impacts
of MHK Arrays
- M. Grippo and I. Hlohowskyj
- MHK MA\Categorizing and Evaluating the Effects of
Stressors
- Argonne National Lab
- mgrippo_at_anl.gov
- November 2011
2Purpose, Objectives, Integration
- Ecological impacts are a major concern in the
regulatory review of MHK projects and uncertainty
about biological impacts will slow the pace of
field deployments. - Ecological risk analysis of MHK deployments
- Single deployment
- Array of devices
- Cumulative Impacts
- - The incremental increases in impacts from a
single - MHK device to large-scale commercial
developments - - Interaction of the MHK device with existing
- impacts from other anthropogenic stressors
3Purpose, Objectives, Integration
- Objectives
- Aid developers in meeting NEPA requirements by
addressing concerns of regulatory and management
agencies - Identify the highest risk impacts that will
likely require mitigation - Identify data gaps that need to be investigated
to reduce uncertainty - Integration
- Incorporate the results of field and laboratory
studies conducted by partner labs into our risk
analysis - Suggest new endpoints for other labs to evaluate
experimentally
4Technical Approach
- Widely accepted EPA Risk Assessment Framework
problem - formulation, analysis, and risk characterization
- Problem formulation-Conceptual models (CM)
- Identifies MHK stressor-receptor relationships
- -Stakeholder communication, data gaps, prediction
- -Readily modified as new data become available
- Address Risk
- -MHK Operations Collision, noise, EMF habitat
alteration - -MHK Structure Habitat alteration reef effect
- -Population and Ecosystem level risks
5Plan, Schedule, Budget
- Schedule
- Initiation date 9/1/2009
- Planned completion date 9/30/2012
- FY10 Milestones Report documenting the
preliminary CMs and their application to benthic
habitat alteration at proposed development sites - FY11 Milestones Report documenting revised CMs
and the summary of recent environmental research
on MHK deployments - FY12 Milestones Risk analysis and CMs
incorporating the most recent studies of the
ecological effects of MHK deployments
(9/20/2012). - Budget
- Approximately 61 of the total project funding
has been spent to date
Budget History Budget History Budget History Budget History Budget History Budget History
FY2009 FY2009 FY2010 FY2010 FY2011 FY2011
DOE Cost-share DOE Cost-share DOE Cost-share
307K - 61K - 244K -
6Accomplishments and Results
- FY10
- 1. Developed CMs of risks associated with a
single device and MHK arrays based on existing
literature - 2. Developed framework for cumulative impact
analysis - 3. Applied CMs to benthic ecosystems at four
locations considered for MHK deployment
7Accomplishments and Results
- FY11
- 1. Submitted CMs for review to multiple resource
agencies - 2. Revised CM report incorporating agency
comments - 3. Currently in the Analysis Phase
- -Evaluating MHK monitoring studies currently
available - -Working with USACE on using individual based
models quantify exposure probabilities
8Accomplishments and Results
Habitat mediated impact routes from MHK
arrays Higher order interactions more difficult
to address CM shows POTENTIAL EFFECTS
9Challenges to Date
- Lack of data to inform the risk analysis held up
2011 work - Few MHK deployments
- Inconclusive results from available monitoring
studies - Resources and potential impacts vary by
technology and project location - Challenging to evaluate cumulative impacts
- Cumulative impacts analysis requires
understanding of MHK device impacts - Working with developers to design monitoring
plans that will effectively address high priority
ecological risks -
10Next Steps
- FY12
- 1. Continue analysis phase of risk assessment
- -Incorporate new studies and data generated by
partner labs - 2. Characterization of Exposure
- -Contact with ecological receptors based on
species life history - -Empirical or mechanistic models of animal
movement to quantitatively - evaluate exposure risk
- 3. Revise CMs based on new data
- Milestones and Deliverables
- Risk analysis report and conceptual models (CM)
integrating most current risk information on MHK
devices - Future Work
- Ongoing incorporation of new data into CM
- Development of targeted individual based models