GMD and Spare Equipment Database: Perspectives and Status - PowerPoint PPT Presentation

1 / 31
About This Presentation
Title:

GMD and Spare Equipment Database: Perspectives and Status

Description:

GMD and Spare Equipment Database: Perspectives and Status Eric Rollison Engineer of Reliability Assessments * Certain risks, however, are black swans: high-impact ... – PowerPoint PPT presentation

Number of Views:197
Avg rating:3.0/5.0
Slides: 32
Provided by: KarenS50
Category:

less

Transcript and Presenter's Notes

Title: GMD and Spare Equipment Database: Perspectives and Status


1
GMD and Spare Equipment DatabasePerspectives
and Status
Eric Rollison Engineer of Reliability Assessments
2
About NERC Mission
To ensure the reliability of the North American
bulk power system
  • Develop and enforce reliability standards
  • Assess current and future reliability
  • Analyze system events and recommend improved
    practices
  • Encourage active participation by all
    stakeholders
  • Pursue mandatory standards in all areas of the
    interconnection

3
NERC Reliability Assessments
  • Peak Demand Forecasts
  • Resource Adequacy
  • Transmission Adequacy
  • Key Issues Emerging Trends Impacting

    Reliability
  • Regional Self-Assessment
  • Ad-hoc Special
    Assessments

4
High-Impact, Low-Frequency (HILF) Risks
  • Black Swan events
  • Occur very infrequently, or, in some cases, have
    never occurred
  • Little real-world operational experience with
    addressing these risks
  • Generally have the potential to impact many
    assets at once
  • Catastrophic impacts on the bulk power system and
    society-at-large

5
HILF Report
  • Created a common understanding of three HILF
    risks
  • Coordinated Cyber/Physical Attacks
  • EMP/GMD
  • Pandemics
  • Lays the groundwork for the development of an
    action plan
  • 19 Proposals for Action suggested by workshop
    participants

6
Critical Infrastructure StrategicCoordinated
Action Plan
NERC Technical Committee Leadership Planning Ope
rating Critical Infrastructure Protection
Resources and Expertise Electricity
entities Vendors Suppliers Government partners
Scope Approved Dec 2010
Scope Approved Sep 2010
7
GMD Background
  • Geomagnetic Disturbances is on the NERC
    Presidents Top Priority issues for Bulk Power
    System Reliability MRC, January 2011
  • Geomagnetic storms emanating from the sun can
    produce an impulsive disturbance to earths
    geomagnetic field over wide geographic regions.
  • This field disturbance causes induced ground
    currents (geomagnetically induced currents or
    GIC)
  • These GIC can saturate and severely damage bulk
    power system equipment that may be difficult to
    replace, such as high voltage transformers.

8
SWPC product distribution
WECC Reliability Coordinator, Vancouver
Midwest ISO, St. Paul
NYISO
WECC Loveland, CO
SWPC G2 Alerts and Warning dissemination
9
GMD Task Force Scope - Deliverables
  • Purpose of GMD TF will investigate bulk power
    system reliability implications and develop
    solutions to help mitigate this risk.
  • Deliverables consider changes to current
    planning and operating criteria evaluate and
    prioritize mitigation and restoration options
    improve sector-wide spare equipment sharing
    programs develop industry guidance, and provide
    input into NERCs reliability Standards process.

10
GMDTF Status
  • Chair and Vice Chair have been appointed
  • Chair Donald Watkins Bonneville Power
    Administration
  • Vice Chair Frank Koza PJM Interconnection
  • Task Group Membership spans Electric Industry, US
    and Canadian Government Agencies, and Transformer
    and Relay Manufacturers
  • Manufacturers ABB, Siemens, GE Prolec, Efacec,
    Schweitzer Relays
  • Governmental US (DOE, DHS, State, and NOAA) and
    Canada (NR Can, DPS)

11
GMDTF Deliverables
2011 Deliverables
1st Quarter Whitepaper outlining the current industry experience and capability and identifies opportunities, options and alternatives to enhanced how the industry manages GMD risks.
2nd Quarter Whitepaper on current warning limitations, the ability of operators to take mitigating action, and areas for improvement.
3rd Quarter Whitepaper on restoration abilities and areas for improvement.
4th Quarter (Dependencies) Whitepaper that reviews industry prevention approaches to GMD events. Complete a final report incorporating the findings of the whitepapers and simulations with suggested recommendations and follow-on actions.
12
Critical Priorities
  • Transformer Vulnerability
  • ID vulnerability, prioritize, establish
    characteristics (GIC vs Time)
  • This is the primary reason for concern with GMD
  • What is your Live to fight the next day. plan
    in an extreme storm?
  • Reference Event given a locational 1100y
  • How should we establish performance requirements?
  • Each system should be able to withstand the
    reference storm, or
  • Should each do what is prudent in their own
    estimation
  • Should it be a reference worse credible case with
    each entity deciding how to protect their system?
    (This is where we are headed)

13
NERC Advisory
  • NERC released an advisory to industry that
    covered immediate operational planning, operating
    and long-term planning recommendations to address
    GMD.
  • The Advisory was developed in partnership with
    NERC management, NERCs technical committees
    (OC/PC/CIPC), North American Transmission Forum,
    and U.S. government (FERC)
  • Released to industry on May 10, 2011.

14
SEDTF Members
  • Chair and Vice Chair have been appointed
  • Chair Dale Burmester American Transmission
    Company
  • Vice Chair Mark Westendorf Midwest ISO
  • Task Group Membership (43) includes experts from
    across the North American Electric Industry, US
    Government Agencies, and Transformer
    Manufacturers
  • Content and Function Subgroups initiated to focus
    on SED efforts and scope milestones/activities.

15
Question Answer
16
Background Slides
17
Reliability Risk Management Concepts
18
Monitoring Progress The Big Picture
19
Advisory Actions to Consider
  • Increase attention to Situation Awareness and
    coordinate all actions with Reliability
    Coordinator.
  • Discontinue maintenance work and restore
    out-of-service transmission lines, wherever
    possible.
  • Increase real and reactive reserves to preserve
    system integrity during a strong GMD event
    Real-Time Operations
  • Consider bringing equipment online to provide
    additional reactive power reserves.
  • Decrease loading on susceptible transformers
    through transmission reconfiguration and
    generation redispatch

20
Defined Scope for Each Task Force
21
Inter-Task Force Coordination
22
(No Transcript)
23
Sunspot History
24
Status of Current Solar Cycle
  • Solar minimum in December 2008
  • Solar Cycle 24 now well underway
  • Cycle 24 maximum forecast - May 2013

25
Impacts on Electric Power Grid
  • CME impacts Earths magnetic field
  • Fluctuations generate electric fields on
  • Earth. These geomagnetically induced
  • currents (GIC) can flow into power lines and
  • transformers
  • Leads to transformer saturation and
  • over-heating, voltage drops, harmonic
    generation, transformer
  • damage, grid collapse

Information Notice No. 90-42 FAILURE OF
ELECTRICAL POWER EQUIPMENT DUE TO SOLAR
MAGNETIC DISTURBANCES Specific events occurred
at the Three Mile Island, Unit 1, Hope Creek
Unit 1, and Salem Unit 1 nuclear power plants.
inspection of the generator step-up
transformer severe overheating, melted low
-voltage service connections in phases A and C,
and insulation discoloration in phase B. On
September 19, at Salem Unit 2 nuclear power
plant, a second solar storm damaged the
generator step-up transformer. Sep 1990
26
Areas vulnerable to GMD Impacts
Power systems in areas of igneous rock (gray) are
the most vulnerable to the effects of intense
geomagnetic activity because the high resistance
of the igneous rock encourages geomagnetically
induced currents (GICs) to flow in the power
transmission lines situated above the rock. Shown
in cross-hatching are the auroral zone and the
extremes that the aurora can reach during severe
disturbances such as March 13, 1989. Credit
American Geophysical Union
27
Impacts in the SERC RegionStorm Centered 50
Latitude
From FERC ORNL Meta-R-319 report Page 3-26
http//www.ornl.gov/sci/ees/etsd/pes/pubs/ferc_Met
a-R-319.pdf
Greater than a 10x 1989 Storm (gt5000 nT/Minute)
will introduce significant GIC into the
Southeastern US and may have BPS impacts
28
Impacts in the SERC RegionStorm Centered 45
Latitude
From FERC ORNL Meta-R-319 report Page 3-26
http//www.ornl.gov/sci/ees/etsd/pes/pubs/ferc_Met
a-R-319.pdf
NOAA East Coast GIC Measurement Station is
located at Fredericksburg, VA
29
Status Coordinated Action PlanNERC Priority
Initiatives
2010
2011
Q4
Q3
Q1
Q2
Q3
Q4
Q4
  • DHS bi-directional info sharing

Other Initiatives
  • NERC crisis/communications plan
  • Policy-level severe
  • impact scenario
  • Milestone deliverables

30
SEDTF Scope - Deliverables
  • Purpose of SEDTF provide recommendations for
    enhancing resilience to High Impact Low Frequency
    events through improved access to critical
    spares, and potentially other long-lead time
    electric transmission system equipment.
  • Deliverables recommend a uniform approach to
    collecting, storing, and distributing information
    on CONFIDENTIAL long-lead time spare equipment.

31
SEDTF Deliverables
2011 Deliverables
1st Quarter Whitepaper (draft) defining SED objectives and assessing options/alternatives for a centralized database including specification of what that database might contain, criteria for participation and identification of communication features that might be incorporated. Complete Whitepaper in Q4.
2nd Quarter Expand Whitepaper to discuss SED confidentiality, definitions for long-lead time and spare definitions, state/provincial and federal support possibilities, and appropriate streamlined processes to access SED equipment information and communication same among entities responding to HILF events.
3rd Quarter Expand Whitepaper to define a process for evaluating the performance and readiness to implement the SED program.
4th Quarter Complete final whitepaper/report incorporating the findings of the whitepapers. SED will provide recommendations, but not build or implement technology solutions.