MCC - PowerPoint PPT Presentation

1 / 39
About This Presentation
Title:

MCC

Description:

PROJECTS COMPLEATED S no Name of work Nature of work Year Value Client Project Remark 1 Road work excavation of rock & culverts 2000-01 67381724 H.C.C D.G.H.E.P ... – PowerPoint PPT presentation

Number of Views:3026
Avg rating:3.0/5.0
Slides: 40
Provided by: A83368
Category:
Tags: mcc | compressor | screw

less

Transcript and Presenter's Notes

Title: MCC


1

2
CONTENTS
Sno. PARTICULARS
01 INTRODUCTION
02 DETAILS Of REGISTRATION
03 DETAILS OF MANPOWER
04 EQUIPMENT T.N.P
05 TURNOVER BALANCE SHEET
06 COMPLETION CERTIFICATE
07 PROJECTS COMPLETED RUNNING
08 CONTACT S

3
01
  • INTRODUTION

4
MAHADEO
CONSTRUCTION COMPANY
MCC
  • INTRODUCTION
  • We (M/s MAHADEO CONSTRUCTION COMPANY.10-A,Ravindra
    puri colony,varanasi, U.P 221001)
  • Consider our prime duty to introduce ourselves to
    establish our credentials and would draw your
    kind attention that it so deserves. we are well
    established organization managed by skilled and
    professional leadership backed by through
    experience in various fields of civil works, open
    excavation, underground excavation and any kind
    of mining works, earth works at different
    locations and different companies like
    H.C.C(India),Samsung(South Koria),Gamuda
    (Malaysia),Sunway(Malaysia),Shristi (India),
    Nagarjuna(India),IRCON (India),Gayatri (India).
  • Till this day have completed various assignments
    of our clients to their entire satisfaction and
    have received orders by esteemed
    organisations.because of very good man ship and
    timely completion of work. we enjoy excellent
    goodwill over the year of experience in work of
    excavation, mining work and any kind of
    earthworks.
  • As situation arises we can meet any challenges.

5
02
  • DETAILS OF REGISTRATION

6
CONSTRUCTION FEDERATION OF INDIA
7
INCOME TAX REGESTRATION
8
VAT(SALES TAX)
9
FIRM REGISTRATION
10
P.F REGISTRATION
11
03
  • DETAILS OF MAN POWER

12
MAN POWER

Sr DESIGNATION No
01 CIVIL ENGINEER 02
02 MINING ENGINEER 02
03 SUPERVISOR 10
04 OPERATOR 52
05 DRILLER 10
06 LABOUR-SKILLED 25
07 HELPER-UNSKILLED 15
08 MECHANIC 05
09 ELECTRICIAN 02
10 BLASTER(MINING) 01
11 WELDER 03
13
04
  • EQUIPMENT T.N.P

14
EQUIPMENT T.N.P
Sr Name Made Unit Quantity
1 Excavator TATA 200 LC NO 2
2 Excavator LT PC 300 NO 2
3 Excavator LT PC 200 NO 5
4 Rock breaker Demo,Atlas capco NO 2
5 ROC Atlas capco 203 NO 4
6 Compressor Atlas XA 280(600cf) NO 3
7 Compressor IR NO 1
8 Tipper(6 wheeler) TATA 1613 NO 5
9 Tipper(10 wheeler) TATA 2516 NO 12
10 Tipper(10 wheeler) TATA 2518 HD NO 15
11 Jack hammer Atlas capco NO 4
12 Air hose pipe   Mtr 500
13 Vibrator   NO 6
14 Jig saw(elect) Atlas capco NO 1
15 Welding machine Elgi  NO 2
16 Mixture machine Indian  NO 2
17 4" Concrete grinder Atlas capco NO 2
18 4" Concrete cutter Atlas capco NO 2
19 Pipe screw jack   NO 100
20 Shuttering plate M.S Sqm 400
21 Channel M.S Mtr 400
22 Staging pipe(with clamp) M.S Mtr 400
23 Water pump 5HP NO 1
24 Curring pump 1HP NO 2
25 D.G set Jackson (62.5 Kv) NO 1
26 G.I pipe 2" Dia Mtr 200
27 Dewatering sum pump 10 HP NO 4
29 Blasting center   NO 1
30 Exploder Indian NO 3
31 Exploder Korean NO 3
32 Water tanker 3000Lt NO 1
33 Tractor with compressor MM NO 3
34 Wireless hand set Kenwood NO 15
35 Pickup(utility) Bolero(MM) NO 3
36 Jeep MM NO 1
37 SUV Toyota,MM,HONDA NO 6
38 Soil Compactor Dynapac NO 1
39 Grader 120K CAT NO 1
15
05
  • BUSINESS TURNOVER

16
BUSINESS TURNOVER CHART
AMOUNT IN CRORE
17
06
  • COMPLETION CERTIFICATE

18
MCC
IRCON
19
MCC
IRCON
20
MCC
IRCON
21
MCC
IRCON
22
MCC
IRCON
23
MCC
IRCON
24
MCC
IRCON
25
MCC
IRCON
26
MCC
IRCON
27
MCC
NCCL
28
MCC
NCCL
29
GAYATRI
MCC

30
MCC
GAMUDA
31
MCC
SAMSUNG
32
MCC
SAMSUNG
33
07
  • PROJECTS COMPLETED RUNNING

34
PROJECTS COMPLEATED
S no Name of work Nature of work Year Value Client Project Remark
1 Road work excavation of rock culverts 2000-01 67381724 H.C.C D.G.H.E.P  
    causeway well concrete wall       Dharchula Completed
2 Surge salt excavation support work 2001-02 6050655 H.C.C D.G.H.E.P  
    concrete wall       Dharchula Completed
3 T.R.T(PORTAL) open excavation in rock 2001-02 12854840 H.C.C D.G.H.E.P  
    supporting work       Dharchula Completed
4 Road work earth work 2001-02 80801000 H.C.C D.G.H.E.P  
            Dharchula Completed
5 Tell race tunnel underground excavation 2001-02 6303034 samsung D.G.H.E.P  
    supporting work       Dharchula Completed
6 H.R.T Excavation lining concrete 2001-06 251510671 samsung D.G.H.E.P  
    work       Dharchula Completed
7 Mining transporting drilling ,blasting and benching 2003-06 89200000 gamuda NH-2  
    (haul road) related activities       Pachami(W.B) Completed
8 Mining transporting drilling ,blasting and benching 2006-07 100500000 shristi NH-25  
    (haul road) related activities       UP-05 Completed
9 Mining transporting drilling ,blasting and benching 2006-07 49400000 IRCON NH-25  
    (haul road) related activities       UP-05 Completed
35
S no Name of work Nature of work Year Value Client Project Remark
10 Crusher running operation and maintenance 2007-08 59250000 IRCON NH-25  
  maintenance         UP-05 Completed
11 Mining transporting drilling ,blasting and benching 2007-08 63000000 IRCON NH-25  
    (haul road) related activities       UP-05 Completed
12 Mining transporting drilling ,blasting and benching 2008-09 62200000 IRCON NH-25  
    (haul road) related activities       UP-05 Completed
13 Mining transporting drilling ,blasting and benching 2006-07 141000000 NCCL NH-25 Completed
    (haul road) related activities       UP-05   
14 mining transporting drilling ,blasting and benching 2008-09 131100000 IRCON NH-25  
    (haul road) related activities       UP-05 Completed
15 Mining transporting drilling ,blasting and benching 2009-10 14500000 K.M.C NH-25  
    (haul road) related activities       UP-03 Completed
16 Mining transporting drilling ,blasting and benching 2009-10 36960000 IRCON NH-25  
    (haul road) related activities       UP-05 Completed
17 Mining transporting drilling ,blasting and benching 2010-11 22000000 NCCL NH-25 Completed
    (haul road) related activities          
18 Mining transporting drilling ,blasting and benching 2010-11 34450000 NCCL NH-25 Compleleted
    (haul road) related activities          
               
36
PROJECTS
S no Name of work Nature of work Year Value Client Project Remark
1 Crusher running operation and maintenance 2008-9 13500000 GAYATRI NH-25  
  maintenance         UP-04 Comp
2 Mining transporting drilling ,blasting and benching 2008-09 34000000 GAYATRI NH-25  
    (haul road) related activities       UP-04 comp
3 Mining transporting drilling ,blasting and benching 2009-10 NCCL NH-25
  (haul road) related activities UP-05 comp
  4 Mining transporting drilling ,blasting and benching 2011-12 26000000  KSSIIPL  NH-203  running 
(haul road) related activities
5 Earth work Preparing bed up to 2011-12 106240240 KSSIIPL NH-203 Running
Sub grade.(chanderpur bbsr bypass)
6 Mining transporting drilling ,blasting and benching 2011-12 112000000 GVR Dumka Runnuing
(haul road) related activities SH
7 Mining transporting drilling ,blasting and benching 2011-12 21500000 ISOLEXCNC NH Running
(haul road) related activities

37
08
  • CONTACT

38
10-A,RAVINDRAPURI,VARANASI,U.P 221001
MAHADEO CONSTRUCTION COMPANY
  • www.mahadeoconstruction.com
  • Email ad mcc001_at_rediffmail.com
  • Email ad anup_mcc_at_yahoo.com
  • Tel No 05422277999
  • Fax No 05422277999

39
CONTACT
  • MAHADEO CONSTRUCTION COMPANY

ANOOP KR SINGH (MANAGING PARTNER) MOB09794996661
ARUN KR SINGH (PARTNER) MOB09794487878
ANIL KR SINGH (PARTNER) MOB09794996660
UMESH KR SINGH (PARTNER) MOB09794996662
Write a Comment
User Comments (0)
About PowerShow.com