1 OREDA
OREDA started in 1984 by Government of Odisha
to promote renewable energy resources and its
applications in the state . OREDA is the state
nodal agency recognised by Ministry of New
Renewable Energy, Govt of India (MNRE) Odisha
Electricity Regulatory Authority (OERC) for
Renewable Energy Promotion in Odisha.
2Orissas Power Scenario and its Implications on
the ingress of renewables
- Historically Odisha has been a power surplus
state. - It witnessed some occasional deficits in
2008-09, and 09-10 - Odisha is again likely to become a surplus state
by 2012. - Evidently , renewable power was not in demand
and will never be in demand in the state at
preferential/ higher tariffs without RPO
regulation .
3Renwable Energy Potential.
- Solar----14000 MW,
- Wind------1700 MW,
- Biomass 350 MW,(Paddy husk)
- Small Hydro-160 MW,
- Muncipal Waste20 MW.
4RPO of State(Renewable Purchase obligation)
- RPO for GRIDCO
- Solar at 0.1--81 MWby 2016
- Solar at 0.3--243 MWby 2016
- Wind-------------100 MW- by 2016
- Biomass----------102 MW
5Electricity Tariff for purchase by GRIDCO as
fixed by OERC
- 1. Solar--- Rs.17.80
- 2. Wind----Rs. 5.31
- 3. Biomass-Rs.4.67
6Renewable Purchase Obligation of Orissa
Year Consumption in MUs Capacity addition from different sources in MW Capacity addition from different sources in MW Capacity addition from different sources in MW Capacity addition from different sources in MW Capacity addition from different sources in MW Capacity addition from different sources in MW Million units as per targets fixed Million units as per OERC
Year Consumption in MUs Solar _at_ 0.1 Wind SHP Biomass Cogen Total Million units as per targets fixed Million units as per OERC
2011-12 30358 8 0 0 58 267 295 1500.01 1517.90
2012-13 36862 27 0 0 24 79 168 526.37 509.51
2013-14 39912 15 25 0 10 52 102 347.30 367.31
2014-15 41578 15 25 0 10 41 91 301.10 307.85
2015-16 43062 16 50 0 0 41 107 281.45 311.77
Total Total 81 100 0 102 380 763 2956.21 3041.34
7Analysis of the RPO
- As per the above table the total RPO of the state
is about 283 MW. - The above RPO is to be achieved over a period of
5 years . - Resource wise obligations
-
Source RPO upto 2016 RPO upto 2013 DPR, Recvd / Projects Approved.
Solar 81 MW 35MW 37 MW- Projects Received 23 MW already approved
Wind Biomass 100 Mw 102 MW 0 82 85 MW 143 MW- already apprvd
8Actions taken by OREDA to achieve the RPO
- Solar Power Plants
- 3 MW commissioned.
- 5 MW to be commissioned in coming few months
- 5 MW sanctioned by NVVN commission in next
month - 10 MW sanctioned under REC mechanism due for
commission in 7 months time. - Solar Tender is going to be floated for 25 MW on
22nd Dec, 2011. - Solar parks to be created under Renewable Energy
Industrial Park scheme being finalized with IDCO.
9Actions of OREDA to achieve the above RPO
contd..
Biomass 20 MW commmissioned in Dhenkanal in this
month. 98 MW at different stages of
implementation 10 MW cleared by STC on 20.7.11 15
MW CGP cleared by STC on 20.7.11 which can trade
RECs. All bagasse based CGPs owned by Sugar
mills/Rice Mills producing power are being
assisted to trade RECs
10Actions of OREDA to achieve the above RPO
contd..
Wind Proposals for 72.25 MW in Damanjodi area
are under active consideration Proposal is being
mooted by OREDA for 13.5 MW in Gopalpur Wind
Resource assessment is being taken up in 10 new
sites. It is in progress in about 15 sites.
11Beyond the RPO regime
12Opportunities in Orissa
- 1. Solar tender for 150 MW is going to come out
in short time. - 2. Wind Power units can be set up in private and
Govt lands for more than 100 MW in Gopalpur
Damanjodi.
13- Biomass---Rice husk------150 MW
- Biomass Paddy Straw------150 MW
- BiomassCorn etc waste10 MW.
- Muncipality Waste------------20 MW.
14Off-Grid Solar etc systems.
- MNRE/ NABARD funded scheme is being implemented
with financing facility by all Banks all over
Odisha in Rural/Urban areas. - Entreprenures can take up Marketing of solar and
hybrid systems.
15Thank you