MVT: Mass Verification Test - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

MVT: Mass Verification Test

Description:

MVT: Mass Verification Test ORT: On Going Reliability Test S/W:software – PowerPoint PPT presentation

Number of Views:167
Avg rating:3.0/5.0
Slides: 29
Provided by: kare236
Category:
Tags: mvt | mass | test | verification

less

Transcript and Presenter's Notes

Title: MVT: Mass Verification Test


1
???????
  • MVT Mass Verification Test  ?????? ORT On
    Going Reliability Test  ??????? S/Wsoftware  ??
    H/W hardware  ?? DCN Design Change
    Notice  ?????? PVT Production Verification
    Test  ?????? MTF Modulation Transfer
    Function  ?????? CAT Carriage Alignment
    Tool    ????? ID Industrial Design   ????(????)
    PCBA Printed Circuit Board Assembly  ?????
    F/T Function Test  ???? CCD Charge Coupled
    Device  ?????? ERS External Reference
    Spec  ???? PMP Production Management
    Plan  ?????? QA  Quality Assurance ???? QRA
    Quality Reliability Assurance???????? MQA
    Manufacturing Quality Assurance ?????? DQA
    Design Quality Assurance ?????? QC Quality
    Control ???? IQC Incoming Quality Control
    ??????

2
???????
  • VQC Vendor Quality Control  ?????? IPQC In
    Process Quality Control ?????? OQA Out going
    Quality Control ?????? QE  Quality Engineer
    ???? AQL Acceptable Quality Level ????????
    DPPM Defective Pieces Per Million units
    ???????? PPM Pieces Per Million ????? CS
    Custom Service  ???? MRB Marerial Review
    Board   DMR Defective Material Report  ??????
    RMA Return Marerial Administration  ??????
    Life Test ???? T/C Temperature Cycle  ????
    H/T High Temperature Test  ???? L/T Low
    Temperature Test  ???? ISO International
    Standard Organization  ??????? SPC Statistic
    process control  ?????? 5S ??.??.??.??.?? VMI
    Visual Mechanical Inspection  ?????? MIL-STD
    Military Standard  ????

3
???????
  • SPEC Specification  ?? AVL Approval Vendor
    List  ???? QVL Qualified Vendor List  ????
    FQC Final Quality Control  ?????? OBA Open
    Box Audit  ???? EAR Engineering Analysis
    Request FAI First Article Inspection  ????
    VQM Vendor Quality Management  ?????? CAR
    Corrective Action Request  ?????? 4M Man
    Machine Material Method ?,?,?,?? 5M Man
    Machine Material Method Mwasurment ?,?,?,??,??
    MTBF Mean Time Between Failure ???? TTL Total
    FIN  FinanceAccounting  ????? PL Profit
    Lose PV Performance Variance ???? 3 Element
    of Cost M,L,O M  Material ?? L  Labor ??
    Overhead ????

4
???????
  • Fix OH  Fix Overhead ?????? Var OH  Variable
    Overhead ?????? COGS  Cost Of Goods Sold ??????
    AR  Account Receivable ?? AP Account Payable
    ?? MIS  Management Information System ??????
    IS Information System ???? IT Information
    Technology ???? MRP Material Requisition Plan
    ?????? I2Information Integration System ??????
    SAP System Application Programming ?????? ERP
    Enterprise Resource Programming ?????? HR Human
    Resource ???? PR Public relation ???? T/O
    Turn Over RateMonthly T/O Total People12 GR
    General Affair ?? Organization  ?? HQ  Head
    Quarter ??? Chairmen  ??                
  • Lite-On  Group ????

5
???????
  • President?? Executive Vice President ????? Vice
    President ??? HR Human Resource ????? FIN
    Finance ?? Sales ?? RD Research Developing
    ??? QA ????   QA  DQA CS MIS Management
    Information System ?????? PUR  ??  Purchasing
    IMD Image Management Division ??????? ITS
    Information Technology System ??? QRA Quality
    Reliability Assurance ??? MFG
    Manufacturing  ??? PMC Production Material
    Control ?(?)?(?)?(?) Materials ?? PC
    Production Control ???? MPS Mass Production
    Schedule ???? FGI Finished goods Inventory ????
    UTS Units To Stock ???? WIP Working In
    Process Inventory ???

6
???????
  • C/T Cycle Time ????,?? WD Working Days ???
    MTD Month To Days ?????(??????) YTD Year To
    Days????? SO Sales Order ???? MO Manufacture
    Order ???? BTO Build  To  Order ???? P/N Part
    Number ?? MC Material Control ???? MRP
    Material Requisition Plan ?????? INV Inventory
    ???? Inv Turn Over DaysINVS/NSB X WD ??????
    PSI Production Shipping Inventory ????? JIT
    Just In Time ?? Safety Inventory ???? CKD
    Completed Kits Delivery ?????? SKD Semi Kits
    Delivery ??(??)???? W/H Warehouse ?? Rec
    Receiving Center ???? Raw MTL ???

7
???????
  • F/G finish goods ?? Import/Export ??? SI
    Shipping Instruction ???? PL Packing List ????
    Inv Shipping Invoice ???? ETD Estimate Arrive
    ?????? BL Bill of Landing ???(??) AWB Air Way
    Bill ???(??) MAWA Master Air Way Bill ????
    HAWB House Air Way Bill ???? TEU Twenty foot
    Equipment Unit(Contain) ?????? FEU Forty foot
    Equipment Unit(Contain) ?????? CY Container
    Yard ??? THC Terminal Handing Charge ??? ORC
    Original Receiving Charge ??? PUR Purchasing ??
    FOB Free on Board ?????(???) CIF Cost
    Insurance Freight ?????? OA Open Account ??
    TT Telegram Transfer ??

8
???????
  • COD Cash On Delivery CRP Cost Reduction
    Program ?????? PR Purchasing Requisition ????
    PO Purchasing Order ??? MFG  Manufacturing
    Production ???? DL Director Labor ???? IDL
    Indirect Labor ???? DLH Direct Labor Hours ????
    ProductivityUTS/DLH PPH Pieces Per Hour ?????
    EfficiencyActual/Target() DT Machine Down
    Time ???? AI Auto Insertion ???? MI Manual
    Insertion ???? SMD Surface Mount Device ??????
    SMT Surface mount technology ?????? B/I Burn
    In(for how many hours at how many degree) ?? WI
    Work Instruction ???? SOP Standard Operation
    Procedure ????? R/I Run In ???? ESD
    Electrical Static Discharge ???? MP Mass
    Production ??

9
???????
  • Engineer ?? PE  Products Engineer ????  
    Process engineer  ???? TE  Test Engineer  ????
    ME  Manufacturing Engineer  ???? Mechanical
    Engineer ???? IE  Industrial Engineer  ????
    DCC Document Control Center  ???? BOM Bill OF
    Material  ???? ECN  Engineering Change
    Notice  ?????? TECN Temporary Engineering
    Change Notice   ???????? ATY Assembly Test
    Yield     Total Yield  ???
  • TPM  Total Productivity Maintenance   PM
    Product Manager Project Manager ECR
    Engineering Change Request  ?????? ECO
    Engineering Change Request  ??????
    EN  Engineering Notice  ???? WPS Work
    Procedure Sheet   ????? ICT In Circuit
    Test  ???? P/R  pilot  run  C/R control run  
    T/R  trial run ?? EVT engineer Verification
    Test  ?????? DVT  Design Verification Test  
    ??????

10
???? ? ? ? ?
????
  • VQA Vendor Quality Assurance
    ???????
  • IQC In-coming Quality Control
    ????
  • IPQC In-process Quality Control
    ????
  • FQC Final Quality Control
    ??????
  • LQC Line Quality Control
    ??????
  • CQA Customer Quality Assurance
    ??????
  • F.P.Y.R First Pass Yield Rate
    ???(?????)
  • MRB Material Review Board
    ?????
  • PMP Process Management Plan
    ??????
  • SOP Standard Operation Process
    ??????

11
???? ? ? ? ?
????
  • X-R Chart
    ?????????
  • X-Rm Chart
    ?????????
  • P Chart
    ??????
  • U Chart
    ???????
  • C Chart
    ??????
  • Ca Capability of
    Accuracy ???
  • CP Capability of
    Precision ???
  • CPK
    ??????
  • S/N Serial Number
    ???
  • Spec. Specification
    ??

12
???? ? ? ? ?
????
???? ? ? ? ?
????


Pass
??
Fail
?? NG
No Good
??? VER
Version
?? ESD
Electro-Static Discharge
????(??) DWG Drawing
?? ISO
International Standard
Organization ?????? MBO
Management By Objective
???? CAL Calibration
(??)?? NCR
No-Calibration Requirement
????(??)
13
???? ? ? ? ?
????
Statement of Conformity
????(??)
License
??
Cyber Solution ????
RMA Procedure
RMA?? Setup
???? Disc
Setup ????
Languages ????
TV Screen ???
Digital Out ???? Finish
?? Return
?? Enter
??
14
???? ? ? ? ?
????

OEM Original Engineering Manufacture
?????? COMPAQ

??COMPAQ???? Fujitsu

??????? HP Hewlett-Packard
?????? QM
Quality Manual
???? QP Quality Procedure
????? WI
Working Instruction
???? OJT On Job Training
????(?????) FIFO
First In First Out
???? 4M1E Man Machine Material
Method Environment ?????????
15
???? ? ? ? ?
????

RMA Return Material Authorization
???? PPM Part Per
Million
10-6(????) MIL Military(U.S)
?????? MIS
Management Information System
?????? TUV

?????? UL

???????? CE

?????? SGS

?????? PM Production Market
???? M/N
Manufacturing Notice
????
16
???? ? ? ? ?
????

DCC Document Control Center
???? ECN
Engineering Change Notice
?????? ECR Engineering Change
Request ?????? DCN
Document Change Notice
?????? PE/ME Product
Engineering/Manufacture Engineering ????/???? EPR
Engineering Pilot Run
???? HR Human
Resource
???? IE/QE Industrial
Engineering/Quality Engineering ????/???? RD
Research Design
???? PPR
Production Pilot Run
????
17
???? ? ? ? ?
????

AC/RE Accept/Reject
??/?? AQL
Acceptable Quality Level
?????? CR Critical Defect
???? MA
Major Defect
???? MI
Minor Defect
???? QVL Qualified Vendor
List ?????? TQM
Total Quality Management
?????? PDCA Plan Do Check Action
???????? MTBF
Mean Time Between Failures
???????? QCDS Quality Cost
Delivery Service ????????
18
???? ? ? ? ?
????
SPC Statistical Process Control
?????? FMEA Failure
Mode Effective Analysis ?????? SWOT
Strength Weakness Opportunity Threat
??,??,??,?? ORT On-going
Reliability Test
??????? DMR Defect Material Review
?????? SCAR
Supplier Corrective Action Requirement
????????? GRR Gauge Reproducibility
and Repeatability ??????????? DOE
Design of Experiment
????? QCC Quality Control Circle
???(??????) COQ
Cost of Quality
????
19
???? ? ? ? ?
????
PCBA Inspection Instruction
PCBA?????
Production Inspection Instruction
??????? OQA Inspection
Procedure OQA????
Critical Parts List
?????? Bar
Code Control List
?????? Test Bug List
??????
Test Equipment List
?????? RD
Design Test Report
RD?????? P4 Reliability
Test Report P4???????
Trouble Shooting Guide
????????

(??????)
20
???? ? ? ? ?
????
Assembly Drawing
???
Preliminary BOM
??BOM Preliminary
Schematics ????
Safety Checklist
?????
Engineering Version
???? IC Master
IC????
Pick Up
???
Spindle Motor
???? Sled Motor
????
Tray Motor
????
Audio Cable ???
21
?????
  • ????  ACF ????  Anisotropic Conductive Film
    ????  ???????? ????  CCD ????  Charge
    Coupled Device ????  ?????? ????  CCL
    ????  Copper Clad Laminate ????  ???
    ????  CMOS ????  Complementary Metal Oxide
    Semiconductor ????  ?????????

22
?????
  • ????  COB ????  Chip On Board
    ????  ?????IC??????????? ????  COG
    ????  Chip On Glass ????  ?????????
    ????  COF ????  Chip On FPC
    ????  ?IC????????? ????  CPU ????  Center
    Processor Unit ????  ?????

23
?????
  • ????  DOC ????  Disk on Chip ????  ????
    ????  EL ????  Electro Luminescence
    ????  ???? ????  EPROM ????  Erasable
    Programmable Read-Only Memory ????  ?????????
    ????  FPC ????  Flexible Printed Circuit
    ????  ?????

24
?????
  • ????  GAL ????  Generic Array Logic
    ????  ?????? ????  IC ????  Integrate
    Circuit ????  ???? ????  LCD ????  Liquid
    Crystal Display ????  ????? ????  LCM
    ????  Liquid Crystal Module ????  ????

25
?????
  • ????  LED ????  Light Emitting Diode
    ????  ????? ????  PAL ????  Programmable
    Array Logic ????  ??????? ????  PCB
    ????  Printed Circuit Board ????  ?????
    ????  PDP ????  Plasma Display Panel
    ????  ??????

26
?????
  • ????  PLD ????  Programable Logic Device
    ????  ??????? ????  PLED ????  Polymer
    Light-Emitting Diode ????  ???????? ????  QA
    ????  QUALITY ASSURANCE ????  ????
    ????  QC ????  QUALITY CONTROL ????  ????

27
?????
  • ????  RAM ????  Random Access Memory
    ????  ??????? ????  ROM ????  Read Only
    Memory ????  ????? ????  SGS ????  Societe
    Generale de Surveillance S.A. ????  ?????
    ????  SMD ????  Surface Mount Device
    ????  ???????

28
?????
  • ????  SMT ????  Surface Mount Technology
    ????  ?????? ????  TAB ????  Tape
    Aotomated Bonding ????  ???????????
    ????  TCP ????  Tape Carrier Package
    ????  ????? ????  TTL ????  Transister-Tran
    sister-Logic ????  ???-???????
Write a Comment
User Comments (0)
About PowerShow.com