(OPERATIONS) Mark Studenic Energy Production Superintendent Operations Maintenance Interaction Operations: Determines what and when for corrective ... – PowerPoint PPT presentation

Number of Views:109
Avg rating:3.0/5.0
Slides: 14
Provided by: AmericanE1
Category:

less

Transcript and Presenter's Notes

Title: Mark Studenic


1
ENERGY PRODUCTION(OPERATIONS)
  • Mark Studenic
  • Energy Production Superintendent

2
Operations Maintenance Interaction
  • Operations
  • Determines what and when for corrective
    maintenance
  • Leads daily production meetings
  • Initiates repair requests
  • Performs minor maintenance
  • Maintenance
  • Determines who and how
  • Plans, schedules and executes maintenance work
  • Preventive/predictive maintenance
  • Most corrective maintenance
  • Outage management

3
Operations - Staffing
  • Four rotating shift teams

Job Title Number/Team Total
Energy Production Supervisor I 1 4
Energy Production Supervisor II 2 8
Unit Operator 6 24
Equipment Operator 8 32
Control Technician 1 4
Maintenance Mechanic 1 4
Trainer 1
Coordinator 1
Total 19 78
4
Operator Training Development
  • Simulator sessions
  • Structured classroom training
  • On the job training
  • Written tests (monthly)
  • Enhance system knowledge
  • Coaching process
  • Operating procedure reviews (monthly)
  • Other
  • Business plan (annual)
  • New installations

5
Disciplined Approach
  • Equipment Check Sheets
  • Daily
  • Weekly
  • Monthly
  • Quarterly
  • Annual
  • Start-up/Shut down
  • Outage
  • Performance Measures
  • Commercial Availability
  • Dispatch Accuracy
  • Communications
  • Heat Rate
  • NOx Reduction Performance
  • Environmental Performance
  • Safety Performance
  • Knowledge Tests

6
Performance Optimization Tools
  • PI (Process Information)
  • Trends
  • Scorecards
  • Operating procedures
  • Alarms/Annunciators
  • Personnel development processes

7
(No Transcript)
8
Operations - Challenges
  • Aging workforce loss of knowledge
  • Aging plant increased system failures (cables,
    piping, etc.)
  • Training new hires, new processes, new
    technology
  • Environmental performance optimization
  • Raising standards for excellence
  • Disciplined approach (check sheets)
  • Scorecards
  • Cycling units (units 1-4)

9
Material Handling (Coal Yard)
  • Highlights
  • Burn approximately 2.72 million tonne/year (3
    million tons/year)
  • All coal received by train
  • Rapid discharge rail car unloader

Coal cost /tonne (/ton) Sulphur Kg/Million Kcal (lbs/MMBtu)
Units 1-4 31 - 41 (35 - 45) 6.3 10.8 (3.5 - 6.0)
Unit 5 36 - 45 (40 - 50) 2.9 6.3 (1.6 - 3.5)
10
Rail Car Unloader
  • One of a kind in AEP System 1995
  • Completely automated
  • Unloads train at 3,356 tonnes per hour (3,700
    tons per hour)
  • Train moves continuously at 0.48 Km/hour (0.3
    MPH)
  • Equipped with top mount traveling rail car shaker

11
Ash Utilization
  • Flyash- No commercial use
  • Unit 5 Bottom Ash
  • No commercial use
  • Used internally for dam construction and fill
    material
  • Units 1-4 Boiler Slag
  • 79 is processed and sold for roof shingles and
    sand blasting agent
  • 19 is sold to local townships for roadway ice
    control
  • 2 is stored on site as waste product
  • Cenospheres

12
Chemical Lab
  • Highlights
  • Oxygenated feedwater treatment- unit 5
  • Reverse Osmosis System- unit 5
  • Circulating water copper corrosion inhibitor-
    unit 5
  • Cycle water sample conditioning system
  • Caustic feedwater treatment- units 1-4
  • On-line cycle water instrumentation

13