1Seminar On
- Quality Assurance and
- its Importance
-
- Presented By Dabhi Ajay S.
- M. Pharm
- L. M. C. P. Ahmedabad
- Dept. of Pharmaceutics and Pharmaceutical
Technology -
-
2 List of Contents Quality - Reasons and
characteristic of quality - 5Ms of quality and
factors influencing quality Quality Assurance -
Components and Elements of QA - QA systems -
Fundamental features and benefits of QA system -
TQM - QA in pharmaceutical manufacturing -
Process deviations and failures - Change
controls - QA in RD - Concept of SQC -
Sampling and sampling plans
3Quality??
- Quality represents both function and process.
- Function there are operational groups whose
major responsibilities are to assure quality
creation and maintenance (QA) and to monitor the
specifications established to control activities
(QC) - Process set of activities and operations which
determine whether a pharmaceutical product has
quality. - Quality is spelled in terms of specifications
which are in language easy to understand and have
methods for measuring, determining or assessing
and also for verification
4 - Reasons for quality consciousness in society
- Increasing consumer awareness Expectations are
growing in - consumers
- Liberalization of economy Competition is
growing - Globalization of market (shrinking world)
-
- International standards (ISO 9000)
- Quality tag
5 - Characteristic of quality
- IDENTITY
- PURITY
- POTENCY
- STRENGTH
- UNIFORMITY
- SAFETY
- EFFICACY
- STABILITY
- A drug product should comply with such
requirements within the permitted tolerance limit
and that up to designated or expected shelf life
period of the drug in question. It should also
comply with legal and professional standards.
6- Quality is affected during the process of
manufacturing on handling and therefore required
to conform with specified quality form the
beginning till they are consumed - Quality cannot be merely justified by the end
product testing and nor by manufacturing and
quality control assessment -
- Quality is the end product of a thoroughly
understood, properly designed, implemented and
controlled manufacturing processes. - Customary sample size alone cannot verify that
the various factors in the system intended to
assure quality within and between batches of
product are functioning as they were designed to
function.
7The 5Ms of Quality
- Man
- Material
- Machinery
- Manuals/Methodology ( SOP)
- Motivation
8Factors influencing quality
Pre analytical Analytical Post analytical
Right specimen Laboratory professionals Recording
Right collection Reagents Interpretation
Right labeling Equipment Turnaround time
Right quantity Selection of test - SOP Report to right user
Right transport Records
Right storage Bio-Safety
9Quality Assurance Assurance Guarantee or
promise given to inspire confidence Quality
Assurance is sum total of the organized
arrangements made with the objectives of ensuring
that product will be of quality required by their
intended use. QA is the activity of providing to
all, concerned the evidence needed to establish
confidence that quality function is being
performed adequately. Aim of QA To ensure
that each batch of a medicinal product complies
with its specifications and is fit for its
intended use in terms of safety, efficacy, and
acceptability.
10Quality assurance
Definition It is the sum total of all lab
activities that are undertaken to ensure
generation of accurate and reliable
results. What is the Objective? To ensure
credibility of the lab and generate confidence in
lab results
11Components of Quality assurance
- Internal Quality control IQC
- Nature Concurrent
- performed by lab staff
- Objective Reliable results on a daily basis
- External quality assessment EQA
- Nature Retrospective to evaluate IQC
- Performed by Independent agency
- Objective Ensure inter laboratory comparability
12- Elements of QA
- Quality System Planning A management
responsibility include strong management,
facilities, equipments, personnel, control etc. - Product development
- Vendor control
- Validation Validation of process, Analytical
method, facilities, equipments, personnel, raw
materials, product, environment etc. - Documentation
- Quality Audit Periodic reviews and evaluation
of manufacture and quality control.
13- Quality Assurance System
-
- A quality assurance system is constructed by
merging a series of actions. These actions
collectively ensure product quality. The QA
system must - establish specific activities before production
- control factors during production
- 3) evaluate results following production
14Quality systems
- Objectives
- To prevent risks
- To detect deviations
- To correct errors
- To improve efficiency
- To reduce costs
- How
- By establishing a quality manual defining
- Organizational structure Staff
- Responsibilities
- Procedures and processes
- Resources
- Documentation
15- Fundamental features of quality system
- a quality policy which defines the purpose and
objectives of the pharmaceutical manufacturing
facility, it also outlines the ways in which
these objectives will be achieved. - resources which include materials, equipments
and personnel - documentations which includes procedures and
standards - an audit process to provide assurance that
procedures have been compiled with this process
can also be used to improve the quality system.
16- In pharmaceutical production process, with
assurance is involved in the following
activities - Purchasing Dispatching
- Warehousing Operational protocols
- Manufacturing Training
- Quality control Validation
- Packaging
- The system for each the listed activities must
provide - assurance that materials, product labeling and
storage have conformed to an established
programme of operations. - Monitoring to ensure that the system is
completed with or updated.
17- Benefits of QA system
- Higher standards of production
- Compliance with regulatory requirements
- Reduce waste
- Less risk of product defects
- Quality System
- Ensure quality
- Provide evidence
- Generate confidence
18- Total Quality Management
- Quality function is part of a team composed of
research, production Marketing/sales, and
customer service. - It requires total commitment of senior-level
management and - supervision of all departments, operators,
suppliers and customers. - Raw materials must be characterized and then
purchased - Facilities must be designed, constructed and
controlled - Equipment must be selected
- Personnel must be trained
- Distribution department is responsible for
controlling the shipping and handling of
products, using inventory control system based on
FIFO. - Marketing department should be sensitive to
customer needs and be responsive to complaints.
19QA in Pharmaceutical Manufacturing
20- GMPs
- QA is ubiquitous in production
- Quality unit is responsible for ensuring that
controls are - implemented during manufacturing operations which
assures drug product quality. - - The quality model that these regulations
establish consists of a sequence of events of - Qualification
- Validation
- Specifications
- Monitoring
- End of process testing
- Written instructions
- Documentation and monitoring review
- Decision (to approve or reject)
21- Qualification includes essentially activities
performed to prove that a system does what it
purpots to do - Design qualification
- Installation qualification
- Operational qualification
- Performance qualification
- - should establish and provide documentary
evidence that the premises, the supporting
utilities, the equipment and the processes will
consistently produce a product meeting its
pre-determined specifications and quality
attributes. - - PQ should include, but not be limited to
the following - tests, using production materials, qualified
substitutes or simulated product, that have been
developed from knowledge of the process and the
facilities, systems or equipment tests to
include a condition or set of conditions
encompassing upper and lower operating limits.
22Qualification life cycle
23Specifications
- Results of the validation and qualification
exercises are specifications - They should be derived form previous acceptable
process average - process variability estimates where possible
- It separates acceptability and unacceptability
Monitoring
- Whether specifications are being met is the
process of monitoring
Documentation
- Procedure, master production and control records
- Data recording documentation
- Review of records, retention of records and
follow-up of problems - arising after production
24Technology Transfer
- Technology transfer includes quality involvement
- So QA oversights, review and approves (rejects)
the transfer
25Facilities and Equipments
- QA role can be review of
- Layouts and floor plans with regard to material,
personnel, waste - flow, and the potential for cross contamination
- Materials of construction and design of all
areas - Suitability of utilities, services, and the
systems (adherence to - GMPs and generally acceptable practices) for
water, HVAC, gases - etc.
- Suitability of equipments (design, capacity,
materials of - construction, compatibility with process
materials and conditions, - ability to be cleaned and/or sterilized)
- Qualification and validation of facilities,
equipments, utilities etc.
26Materials
- To test them to ensure that they have necessary
quality attributes - To segregate acceptable from unaccepted
- To maintain the quality of materials during their
presence in the - plant and in their processing
27Documentation control
-Documents are specific for the process, product,
equipment etc. -QA issues, retrieves, reviews,
and stores the documents -SOPs and batch
records must be authorized by a sign off
procedure that includes group responsible for the
procedure, all the groups directly impacted by
the procedure, and QA. -QA may be responsible
for assigning batch numbers and expiration dates
as a part of issuance of batch record. -For
SOPs, calibration logs, and the like standard
distribution lists are necessary to ensure that
all who need to use procedures receive updates at
the same time with instructions as to the
effective date of the new document as to the
destruction or return of the old.
28- review of documents after the completion of the
process and testing. The batch record should be
reviewed for completeness, proper sequencing,
appropriate dates, acceptable yields, meeting of
all in-process specifications, and explained and
unexplained deviations. - Final test results must be reviewed to ascertain
whether all the specifications are met. If any
results are not within specifications, the SOP to
handle this must be implemented. - - After all these QA decides the releasibility
of the final product.
29Equipments Facilities Process Containers, Closures, Labeling, Raw materials Staff Product
Purchase order Diagrams and drawings Batch records Purchase orders CVs Inventories
Diagram manuals Floor plans Reconciliations Monitoring Receiving records Inventories Job descriptions Training Sampling, testing Release documents
Use logs Qualifications and validations In process tests Sampling, testing Regulatory Master specificartion sheet
Calibration logs Logs Results Release Documents Procedural Testing methods and procedures
Maintenance logs SOPs SOPs SOPs Technical COA
Cleaning logs Monitoring records Control charts Reconciliations and accountability Distribution
30In process Items control
- Quality Assurance before start up
- Environmental and microbiological control and
sanitation - Manufacturing working formula procedures
- Raw materials
- Manufacturing equipments
- Quality assurance at start up
- Raw material processing
- Compounding
- Packing materials control
- Label controls
- Finished product control
31- Quality Events
- Things didnt go as planned
- Events affecting quality should be investigated
in a timely manner - under the auspices of QA.
- Technical service dept. is responsible for
performing the studies - but QA must access the impact upon the affected
batches and other - potentially affected batches
- - Annual review of products
32Process Validation Deviations and Failures
- It is foolhardy to begin process validation
without an assurance that the process is under
control - Recognize validation failure
- well documented investigations for less clear
deviations - The following steps should be performed as soon
as possible after the problem is discovered - Document clearly what occurred and when it
occurred. - Interview personnel as soon as possible (before
memories can get clouded) and document the
interview. - Collect any additional data (as is relevant).
- Describe a sequence of events of when and what
happened, review batch records, and corroborate
events through data and records.
33Process Materials Finished products
Process deviations Specification deviations Product complaints
Process condition deviation Unapproved vendors Adverse events
In-process specification deviations Stability problems Specification deviation
Environmental excursions Water, gases, etc. deviations SQC trends
SPC trends Stability problems, recalls, reworks, returns
34- Document any and all remedial actions that may
have been taken. - List all possible causes for the event.
- After investigating, eliminate causes that do
not fit the data. - Establish a cause or most probable cause based
upon the data. - List corrective actions that need to be
implemented. - Only events that are not process-related could
be written off as not negatively affecting the
validation (e.g., power failures, natural
disasters, human error, etc.). - Even if a process validation failed and the cause
was not process-related, the validation should be
replaced with a fresh run.
35Change control
- A basic change control system should cover
- Planned changes change in equipment, facilities,
utilities, and computer systems, temporary
changes or emergency changes against permanent
ones, changes in batch records and SOPs, changes
in analytical test methods, specifications and
raw materials. - -planned changes are intentional and pre-approved
and can be either permanent or temporary. - Unplanned changes They are actually deviations
- A change control SOP defining terms, levels of
justification and approval needed, and the
specific responsibility of approvers, must be
written approved and followed. - -There should be a documented change control
system
36- A technical review by qualified personnel should
review the - adequacy of the justification - - whether validation or revalidation is needed
- - the adequacy, accuracy, and usefulness of any
requested drawings - - the potential risk(s) (including cost and
downtime), and whether those risks are
adequately addressed. - QA normally reviews proposed changes for the
- - adequacy of the rationale for the decision to
make the change - - compliance to the change control policy
- - assurance that adequate documentation of the
change is present - - the impact on internal or external customers
or GMPs, and the required changes to other
procedures, specifications, batch records,
and so on. - - A Financial review
37- Follow up
- Emergency changes
- Emergency or quick changes still require
writing the change down and getting the approval
of one technical area manager (such as
Development) and QA. - How to do change control?
- 1. Keep it simple use an approved from and SOP
- 2. Hold regular change control meetings
- 3. Distribute proposed changes electronically
- 4. Train your employees
- 5. Follow up
- 6. Publish a report on outstanding change request
forms - 7. Be careful how you agree to handle temporary
changes - 8. Enlist a powerful ally and assign
responsibility for - tracking/monitoring changes to one individual
/ department.
38Monitoring
- Process and environmental monitoring
- testing and issuance of results
- Imp results of testing is reviewed by QA. Thus
QA must receive all - notices of deviations and monitoring excursions
on an on-going - basis in such a way that it can make
determinations as to product - quality and what steps may need to be take.
Inspection Control
- These are online QA staff responsible for
container and label accountability, online
statistical process control of critical
processing steps, online checking of labels lines
for expiration dates, batch no., and proper
labels as well as line clearance before and after
labeling run, filled vial inspections for
particulates, tablet weight variation and other
functions.
39Training
- Necessary in 3 areas of all plant personnel
regulatory, procedural, and technical.
Auditing
- The essence of audit is comparison. The essential
question of any audit are - Has the system been established?
- Is the system reasonable and appropriate?
- If so, is it being followed?
- Manufacturing audit program should include
- Vendors and contractors
- Plant inspection
- Procedures
- Batch records
- Submissions (pre-approval)
- Quality systems
40Formulate the question
Draw Conclusions
QA and QC
Reporting and Interpretation
Select or develop analytical procedure
Conduct analysis Sampling Sampling
preparation Analysis
Optimize procedure
41QA in Research and Development
- Goals of RD
- Effective drugs
- data should be real, accurate, complete,
consistent and reasonable - results of attendant analyses are the basis for
companies and - regulatory agencies decisions, must be unbiased,
inclusive of all - appropriate data, and in correct with the
predetermined protocols - and/or analytical plans.
- assess the acceptability of and minimize the
errors in products - of RD, thats submission and individual reports.
42GLPs
- Detailed, documented evidences of the appropriate
functioning - of the controls and assurance function is
necessary to prove that - the studies have quality and integrity.
Preclinical QA
- The quality aspects relate to the establishment
of - The design of studies
- Investigational materials
- Test subjects
- Data that result from all tests
- Observations
- Gross postmortem pathology and histopathology
and - Preparation of report
43- Audits
- Protocol Audits
- Procedure audits
- - Study specific
- - System oriented
- 3. Documentation audits
- 4. Report audits
- 5. Facilities audits
44SQC
- Monitoring of quality by application of
statistical methods in all stages of production - Used for estimating parameters, for performing
test of significance, for determining the
relationship between factors, and for making
meaningful decisions on the basis of experimental
evidence - SQC has been used to serve
- as a basis for improved evaluation of materials
through more representative sampling techniques
and - as a means of achieving sharper controls in
certain manufacturing process - Objective determine whether the major source of
observed variation is due to chance variation
which is inevitable during the manufacturing
process, or to assignable cause which is usually
detected and corrected
45- For this normal frequency distribution curves and
quality control charts have been used - Sampling and sampling plans
- Process of removing an appropriate number of
items form a population in order to make
inferences to the entire population - proper methods of sampling and adequate number
and size of samples are needed for an effective
QA program, as judgment of accept or reject lies
in it - the number of unacceptable units are controlled
to rigid standards by the stringency of the
sampling plan - Sampling plans based on data from measurement of
attributes or variables may be constructed - Govt. sampling plans such as MIL-STD-414 for
variable sampling and MIL-STD-105D for attribute
sampling is used - Acceptability of a batch is determined by the use
of sampling plans associated with the designated
acceptable quality level
46- A sampling plan indicates the no, of units of
product form each - batch to be inspected and the criteria for
determining the - acceptability of the batch
- Inspection level determines the relationship
between the batch size - and the sample size
- Single sampling specified sample is selected
- Double sampling a second sample for inspection
is permitted if - The first fails, and two acceptance numbers are
used- the first - Applying to the observed number of defectives for
the first sample, - And the second applying to the observed number of
defectives for - First and second samples combined
- Statistical sampling plan requires that four
basic quality standards - Be specified
- An acceptable quality level (AQL)
- An unacceptable quality level (UQL)
- Risk or error (producers risk) probability of
rejecting a good batch - Risk or error (consumers risk) probability of
accepting a bad batch
47Thank You