Title: Georgia Utilities Permitting System - GUPS


1
  • Georgia Utilities Permitting System - GUPS

2
Strategic Guidelines
  • A Web-based Enterprise Level solution
  • Single point for all permitting requests (New
    Utilities Permits and Work Plans for
    Preconstruction Projects)
  • Capacity to Integrate within GDOT
  • All permit processes
  • Spatially Interactive GIS Mapping System
  • Existing and Future Construction Project
    Information
  • Historical and Road Characteristic Data
  • Allow Customers to Conduct Electronically via
    Internet
  • Application for permits
  • Review and update application before submitting
  • Statewide Standardization
  • Interaction in the permitting process

3
Objectives
  • Reduce time/requirements to complete the
    application process
  • Allow various internal Departments to work on
    permitting requests simultaneously
  • Automatically cross-check proposed construction
    with current and planned construction projects,
    already within DOTs system
  • Query historical records by location and/or
    applicant to create required reports

4
Objectives
  • Accept electronic maps, which identify proposed
    work location
  • Accept electronic CAD construction drawings
  • Automatically track moneys paid to state, per
    given time frame, county and applicant
  • Has Potential to Accept Credit card payments via
    the Web site using SSL for secured transactions

5
Objectives
  • All utilities/private applicants must have access
    to permitting application process
  • Provide DOT design criteria to applicant
  • Electronically generated approved permits at
    customer site
  • Provide electronic signatures for security

6
Objectives
  • Enable applicant to work off line, save
    application and re-access the application until
    it is submitted to DOT for approval
  • Make application accessible to several people
    within the applicants organization.
  • Provide project/application-tracking features for
    agency

7
Objectives
  • Acts as a communications tool to applicant i.e.
    Approval to be granted, if applicant agrees to
    special provisions outlined
  • Provide automatic pop-ups which request user
    acknowledgement before he/she may continue with
    the application process
  • Provides view-only of past permit applications
    for authorized users

8
Objectives
  • Submit emergency permits after work has been
    completed
  • Accept applicant construction updates (Use on
    Construction Revisions), after DOT reviews and
    approves
  • Evaluate bond requirements per application

9
Future Scope
  • Global Implementation
  • Integrate GIS
  • Right of Way Management

10
Training Site
  • GDOT has designed a training site that reflects
    the information that Utility Companies will input
    thus showing how the system works.
  • To access the site use the following link
  • http//gdot-web4.dot.state.ga.us/gups-training/sec
    ure/loginApp.do
  • Codes Membership 300000
  • UserId training
  • Password training
Write a Comment