SURFACE VS UNDERGROUND MINING SPECIALLY FOR THAR FIELD - PowerPoint PPT Presentation

1 / 31
About This Presentation
Title:

SURFACE VS UNDERGROUND MINING SPECIALLY FOR THAR FIELD

Description:

surface vs underground mining specially for thar field by engr. muhammad khalid pervaiz president institute of mining engineers pakistan thar road to prosperity ... – PowerPoint PPT presentation

Number of Views:177
Avg rating:3.0/5.0
Slides: 32
Provided by: mkp6
Category:

less

Transcript and Presenter's Notes

Title: SURFACE VS UNDERGROUND MINING SPECIALLY FOR THAR FIELD


1
SURFACE VS UNDERGROUND MINING SPECIALLY FOR
THAR FIELD
By ENGR. MUHAMMAD KHALID PERVAIZPRESIDENT
INSTITUTE OF MINING ENGINEERS PAKISTAN
2
MINERAL
  • Free occurring substance in the crust of earth
    having economic significance.
  • All operations connected with the discovery,
    exploration and exploitation of minerals called
    mining.
  • Mining Methods vary depending upon the location
    of minerals their characteristics as well as
    characteristics of the associated rocks.
  • Access to minerals if made through underground
    passage deploys underground mining method.
  • Non-underground mining method is called surface
    mining method.

3
Choice of mining methods
  • The size and shape of ore body
  • Depth and type of over burden
  • Location, strike and dip of deposit
  • The strength and physical character of the
    mineral
  • Water and Drainage absence/presence of water.
  • In case of metallic mineral the grade and type of
    ore in other economic factors.

4
THARROAD TO PROSPERITY
5
COALFIELDS IN SINDH - MAP
Lakhra KHI 193 km
Badin KHI 192 km
Sonda KHI 150 km
Metting Jhimpir KHI 200 km
Thar KHI 380 km
6
Highlights of Thar Coalfield
6. Thar Coal Analysis
  • Coal Quality Lignite A-B
  • Moisture (AR) 46.77
  • Ash (AR) 6.24
  • Volatile Matter (AR) 23.42
  • Fixed Carbon (AR) 16.66
  • Sulphur (AR) 1.16
  • Heating Value (Av.) 5,774 Btu./Lb.

7
BLOCKS
8
INVESTIGATED BLOCKS AT THAR
Shenhua Block Area 50 sq.km.
B
C
A
D
Rheinbraun Block Area 20 sq.km.
Investigated Blocks and Shenhua Group/RE Blocks
at Thar coal-field
9
GEOLOGICAL PROFILE
10
(No Transcript)
11
THAR COAL-FIELD (INVESTIGATED BLOCKS)
Block-wise deposits
Block Area (sq. km.) Drill Holes Reserves (Million Tonnes)
Block-I 122 41 3,566
Block-II 55 43 1,584
Block-III 99.5 41 2,006
Block-IV 80 42 2,599
Sub-total 356.5 167 9,715
Rest of coalfield 8,643.5 50 165,791
Total 9,000 217 175,506
12
THAR LIGNITE GENERAL HYDROLOGICAL SECTION
Pressure head of base aquifer
Dune Sand Aquifer
Dune sand Coal formation Base
aquifer basement
13
THAR AQUIFER PARAMETERS
14
Base Aquifer, Pressure Head Today
Full extension of aquifer not shown and not known
Possible mining area
Islamkot
15
LOCATION
16
OPEN-PIT MINE
17
STRIP MINING
18
(No Transcript)
19
STRIPPING BREAK EVEN STRIPPING RATIO
Striping Ratio Over Burden Actually Removed Mineral Produced
Break even stripping Ratio CO CM SCW
CO Total operating cost/ unit volume
CM Cost of Excavation/ unit volume of Minerals
CW Cost of Excavation of unit volume of waste/ overburden
S Strip Ratio
CO CM
CW
20
BUCKET WHEEL EXCAVATORSLARGEST TERRESTRIAL
MACHINESIN THE WORLD
21
BUCKET WHEEL EXCAVATORS
22
Bucket Wheel Excavator Operating in an Open-Pit
Mine
23
Dozer stuck in a Bucket Wheel Excavator
24
Dozer stuck in a Bucket Wheel Excavator
25
AN IDEAL SHAFT SINKING
UNDERGROUND MINING
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
BASHIRO-JO-TAR
  • Desert of Thar
  • Locate Tharo-Jo Tar
  • The tearful rocks
  • The fierceful falls
  • Lo Bashir be careful of Blast
  • Lest We forget
  • And Before We Sweat
  • Deviation of shaft progress is lost
  • Caving of sand and flood of water
  • OH, shaft the shower of Thar
  • Vibration So Produced
  • Tend to induce cracks in the wall
  • Aggravating the fall
  • Operate the Pump
  • Dewater the Well
  • How comes a Shaft A Well

30
BASHIRO-JO-TAR
  • Visualize The Position
  • When Sponsors not in Position
  • Who cares for progress or pace
  • Prestige, honor or loss of face
  • Who gained, who lost
  • Forget not to place on record
  • Budget or Advice,Purchase of Device
  • Payment to Bashir shall sees at all.
  • Farewell to those positioned at Thar
  • Bid well to Tharo-Jo-Tar
  • Mission or Goal, gathering or Workshop
  • Pledge to serve the nations cause

31
BASHIRO-JO-TAR
  • Assembled today at Chak Shahzad
  • We the geo-scientist pray to God
  • No more shower in the shaft
  • Well turns back to shaft
  • Infuse thy knowledge to reach coal
  • Free from Water and bore hole
  • Good luck Oh! Saien Bashir
  • Complete Business before u flee
  • Touch the coal among sweets
Write a Comment
User Comments (0)
About PowerShow.com