Title: Process of Building Order
1Lecture was elaborated with the help of grant
project of Ministry of Education, Youth and
Sports, FRVŠ n. 2005 Innovation of Subject
Financing of Building Order
- Process of Building Order
2Financial Strategy of Building Order
- Planning of cash-flows and sources for their
coverage in time, optimization of the balance
between equity and other sources -
- Factors influencing the way of financing of the
order - Condition agreed in the contract
- Number of sub-suppliers
- Number and the extent of realized orders in the
same time period - During the creation of the financial strategy of
the order is also necessary to respect - Time plan
- Harmonogram of works
3Time Planning Methods
- Generally there are three methods of time
- planning
- Time harmonogram
- Milestones
- Network diagrams
4Time Harmonogram
- Depending on the contract for work it determines
the process of the building order form the time
aspect - Depending on the technical documentation of the
building there are objectively and in time
determined objects and activities, which are
connected with technological and organizational
bindings - In the time harmonogram are defined milestones,
which specify partial dates creating the deadline
of the realization
5Time Harmonogram and Milestones
Activities
Time
- Activities duration is displayed as a horizontal
abscises - Ends of abscise corresponds to a beginning term
and finishing of the activity on the horizontal
time axis - Milestones time plan indicates key-activities on
a project - Project milestone is usually the important
activity or time point during the building order
realization
6(No Transcript)
7(No Transcript)
8Network Diagrams
- We compose network diagram for time, costs and
resources analysis - Network analysis methods
- represent a plan of project activities
- make possible costs valuation of project
activities by the sequential costs cumulating
method according to the work flow on a project - make possible to use all resources most
economical - ? Network diagram is a graphical model of the
project, which represents the dependence among
activities.
9Basic Network Diagram Terminology
- Activities
- Network path
- Start node of the network diagram
- Finish node of the network diagram
- Arrow
- Separating node
- Merge node
10Arrow Diagramming Method
- Arrow Diagramming Method represents
Activities-on-Arrow (an activity name is
displayed on an Arrow). - Node in Arrow Diagramming Method represents Start
and Finish of one ore more activities. A node
doesnt pose any claim on time and resources. - Arrow in Arrow Diagramming Method represents
activity.
11Basic Rules of the Connection of Particular
Activities
The activity S can be started after the activity
R
R
S
S
R
12Basic Rules of the Connection of Particular
Activities
- The basic convention of the node realization
- Any node of Arrow Diagramming Method is realized
only, when a realization of all activities, which
end in the node, ends. This characteristic is
called Conjunction of Node enter - A realization of any node (except the end of
Network diagram) means that the realization of
all activities that begin in the node begins.
This characteristic is called Determination of
Node exit
13Basic Targets in the Case of the Network Diagram
Making
- Maximum logic of the Network
- Good overview of activities and linkages
- Making easy of control and interpretation of the
Network diagram - A possibility of a division into phases at large
Network diagrams
14Phases of the Network Diagram Making
- Problem formulation
- Making of the first Network diagram
- Continuous formal adjustment
15Problem Formulation
- The determination of the project targets and
project drift - PROJECT STRUCTURALIZATION
- The determination of project spread and details
of dividing of the project into activities,
definition of relations between activities -
- PROJECT ORGANIZATION
16Making of the First Network Diagram
- The first step is to create the work structure,
the set of all activities of the project - Either from the beginning We ask What is
necessary to do further? - Or from the end We ask What must be done
before? - First we must set the logical sequence of
activities, which are in progress at the same
time. Than we set all activities in the time
sequence so, how they concur - The logic of the Network, so the right setting of
activities, is determined especially by
technological and functional feasibility of
bindings. Bindings can be - Technological bindings
- Organizational bindings
- Time bindings
- We determine project milestones
17Resources Analysis
- Allocation of the production forces (human
resources) and other - resources required for the realization of the
activities in the time - We distinguish following kinds of resources
- Human resources
- Material resources
- Technological resources
- Financial resources
- We talk especially about two kinds of resources
- Human resources
- (necessary for using the other resources)
- Financial resources
- (financial evaluation of the activity contains
human, material and technological resources)
18Resources Allocation
- There are two reasons, why it is necessary to
deal with the allocation of - the resources in the case of the project
management - Network diagram can show that there will be
overmanning in the future period - This information should call managers
attention - obtaining of new orders to be able to use the
manpower surplus - plan of the changing-over of this workers
- Network diagram can show, that several activities
in progress can require the same resources at the
same time - we have to remake Network diagram in order that
the project will not be delayed. - we have to use the slack time (time reserves) of
some activity if it exists (i.e. the activity is
not on the critical way)
19Special Characteristics of Particular Types of
Recourses Allocation
- The resource type workers
- Workers are set in integer that is corresponding
to the number of the required workers - The pumping of this resource is equally spread
into the operating period of the activity - That means, that every activity that takes 2
weeks, than requires 5 workers. Every day work 5
workers on realizations of the activity - The resource type financial expenses.
- The financial expenses we can set by double way
- the financial expenses for the whole activity
- the financial expenses for the time unit of the
activity
20Mass Curve and its Analysis
- Mass curve
- the diagram that displays amount of particular
type of resources (human resources or financial
resources) needed in every time unit of the
project
21Methodology for Valuation of the Process of
Building Order
- System of management APO is based on cyclically
realized analysis of fulfillment defined aims of
the building construction - APO differs 3 aim parameters
- Actual aim parameter A
- We suppose that construction will be realized
directly according to the project documentation
and valid contract - Real costs for realized part calculation of
costs for remaining part according to the valid
project documentation and contract - Probable aim parameter P
- Includes improvement in the area of costs, which
we consider to be possible (high degree of
certainty), if the building is realized according
to the contract, in this aspect is improved aim
parameter P compared to A - Real costs of realized part calculation of
costs for remaining part including accepted
operations for their improvement - Optimal aim parameter O
- In the area of revenues exists the supposition
that all possible improvements will be realized
in the frame of valid norms, in the area of costs
all possible reductions are also supposed - Real costs of realized part calculation of
costs for remaining part including accepted
operation for their improvement possibilities
of increasing of the efficiency beyond valid
project documentation