Title: Bandula S. Tilakasena
1Pricing policy for renewable energy Avoided Cost
based Tariff
Bandula S. Tilakasena Project Director
Trincomalee Coal Power Project Ceylon
Electricity Board 21 October, 2007
2Introduction
- Classification of Renewable Energy
- Main Features of the current Standardized Power
Purchase Agreement (SPPA) - Tariff based on CEBs avoided costs
- Historical trends
3Classification of Renewable Energy Plants
- Grid Connected Connected to the integrated
electricity distribution grid and deliver
electricity exclusively to the grid - Self Generating Connected to the grid and while
delivering electricity to the grid, a part of the
electricity generated is used by the developer - Off- Grid Operate in isolation
4Standardized Power Purchase Agreement
Eligibility
- Capacity Limit Less than 10 MW
- Energy produced from
- Mini Hydro
- Bio mass
- Cogeneration
CEB/SPPA.bst
5Standardized Power Purchase Agreement Main
Features
- All energy produced by the Facility will be
purchased by CEB - The power plant is not subject to dispatch
- The Power Purchase tariff is based on the Avoided
Costs of CEB, and is announced each year
6Standardized Power Purchase Agreement Main
Features
- The cost of transmission interconnection has to
be borne by the Developer - Electrical interconnections to comply with the
CEB Guide for Interconnection of Embedded
Generators December 2000 - The floor tariff over the term is 90 of the
initial year Tariff
7Tariff calculation methodology - Step 1
Calculate the cost of a unit generated by each
plant in operation using applicable fuel costs
and other plant data such as heat rates.
8Tariff calculation methodology - Step 2
- Compute the expected plant factors for each month
in the year under consideration using projections
prepared by CEBs System Control Centre.
9Tariff calculation methodology- Step 3
- Calculate the fraction of time that each plant
operates in the margin during a given month using
the expected monthly plant factors.
10Seasonal Tariff Step 4
- Estimate the avoided costs for wet and dry
seasons separately by taking the arithmetic
average of the months in each season - Allowances made on account of Transmission Losses
and Overheads incurred by CEB
May -January
February ,March-April
11Tariff calculation methodology - Step 5
- Allowances made on account of Station Losses,
Transmission Losses and overheads incurred by CEB
are as follows - Station Losses 3.0
- Transmission Losses 3.2
- CEB Overheads 1.5
12Tariff calculation methodology - Step 6
- Tariff offered each year is the arithmetic
average of - Avoided cost of generation for the year,
calculated according to the methodology described
above, and - Avoided costs of generation used for estimating
the price offered in the previous two years
13Tariff calculation work sheet for year 2007
14Variations of SPPA tariff 1996-2007 Rs/kWh
Year Dry Season Wet Season
1996 2.90 2.90
1997 3.38 2.89
1998 3.51 3.14
1999 3.22 2.74
2000 3.11 2.76
2001 4.20 4.00
2002 5.13 4.91
2003 6.06 5.85
2004 5.70 4.95
2005 6.05 5.30
2006 6.73 5.82
2007 7.64 6.94
15Variations of SPPA tariff 1996-2007 Rs/kWh
16Thank You
Energy Purchases Branch Transmission
Division Ceylon Electricity Board Web www.ceb.lk