Title: MARINA BAY SANDS
1Earth Control Measures at
MARINA BAY SANDS IR DEVELOPEMENT
2Project Detail
3Site Location
Marina Barrage
4Site Location
Marina Bay Sands IR
5Earth Control Measures Layout
Water Treatment System
One discharge Point
Water Storage Pond
Sheares Avenue
Silt Trap
Perimeter Cut-Off Drain with Silt Fence on both
sides
6Earth Control Measures Implementation
7Earth Control Measures Implementation
8Earth Control Measures
- Earth Control measures at construction site is
of greater urgency and importance now as
Singapore has to harness every drop of water so
that Singaporeans can enjoy clean, clear water
and a healthy environment.
9Erosion Control
- much easier and more cost effective to prevent
erosion than to trap sediments - earth work shall be sequenced and scheduled in
stages and progressively to minimize bare earth
surfaces. - All construction access and bare surfaces shall
be paved up with concrete or milled waste or
other suitable materials. - To turf up bare surfaces immediately in an
earthwork if there is no subsequent construction
activities. - All bare slopes shall be protected with
cemetitious spray, close-turfing or erosion
control blankets. - All earth stokepiles shall be protected by canvas
sheet or erosion control blanket.
10Sediment Control
- To provide concrete lined cut off drains along
the perimeter of the construction sites. - To provide sit fence properly installed and
embedded onto the ground along the perimeter
cut-off drains - Intermediate silt traps shall be installed for
every 30 metres along the perimeter lined cut-off
drain. - To provide sedimentation basins along the
perimeter cut off drains and before discharge
points into public drains.
11Estimation of Surface Runoff
12Estimation of Discharge Capacity
13Rainfall Intensity
14No of Wet days a year
15Estimation of Sediment yield
16Parameters adopted
17Estimation of Soil Erodibility
18Wheel Wash at Main entrance
19Water treatment system provided at wheel wash
20Perimeter cut off drain
Concrete lining
Silt fence
21Silt Traps
22After exvavation, all rainwater will be retain at
basement
Concrete lining at slope
Diaphragm wall completed
23Existing turfing to be retained
24Main Water holding area before treatment
25Water Treatment System
26Discharge of Slurry after water treatment
Slurry discharged to slurry collection area
27Discharge of water to existing canal after
treatment
28Discharge of water to existing canal after
treatment
29The discharge into the storm water drainage
system shall not contain Total Suspended Solids
in concentrations greater than 50 milligrams per
litre of the discharge.
30Continuous monitoring will be implemented on site
31Regular Maintenance
32(No Transcript)
33Existing drain within construction site
maintained regularly
34Maintenance Programme
- Regular checks on the ECM that have been put in
place - The checks including the
-
- inspection of slope, drain, erosion blanket,
silt fence, curb inlet sediment barrier, sediment
tank. -
- Damage, choke or any problem which cause
ineffectiveness should be recorded and reported. - The washing bays with sump pump at all
entrances/exits must be also properly maintained.
- Servicing repair required for the ECM should be
looked into and immediate necessary
repair/service or improvement should be carried
out with urgency.
35Increase in composition fines
- Regulation 4
- TSS gt50mg/l
- 1,000 and
- 2,500 in the case of a second offence
36CHECKLISTFORMAINTENANCE OFEARTH CONTROL
MEASURES