Title: MARINA BAY SANDS


1
Earth Control Measures at
MARINA BAY SANDS IR DEVELOPEMENT
2
Project Detail
3
Site Location
Marina Barrage
4
Site Location
Marina Bay Sands IR
5
Earth Control Measures Layout
Water Treatment System
One discharge Point
Water Storage Pond
Sheares Avenue
Silt Trap
Perimeter Cut-Off Drain with Silt Fence on both
sides
6
Earth Control Measures Implementation
7
Earth Control Measures Implementation
8
Earth Control Measures
  • Earth Control measures at construction site is
    of greater urgency and importance now as
    Singapore has to harness every drop of water so
    that Singaporeans can enjoy clean, clear water
    and a healthy environment.

9
Erosion Control
  • much easier and more cost effective to prevent
    erosion than to trap sediments
  • earth work shall be sequenced and scheduled in
    stages and progressively to minimize bare earth
    surfaces.
  • All construction access and bare surfaces shall
    be paved up with concrete or milled waste or
    other suitable materials.
  • To turf up bare surfaces immediately in an
    earthwork if there is no subsequent construction
    activities.
  • All bare slopes shall be protected with
    cemetitious spray, close-turfing or erosion
    control blankets.
  • All earth stokepiles shall be protected by canvas
    sheet or erosion control blanket.

10
Sediment Control
  • To provide concrete lined cut off drains along
    the perimeter of the construction sites.
  • To provide sit fence properly installed and
    embedded onto the ground along the perimeter
    cut-off drains
  • Intermediate silt traps shall be installed for
    every 30 metres along the perimeter lined cut-off
    drain.  
  • To provide sedimentation basins along the
    perimeter cut off drains and before discharge
    points into public drains.

11
Estimation of Surface Runoff
12
Estimation of Discharge Capacity
13
Rainfall Intensity
14
No of Wet days a year
15
Estimation of Sediment yield
16
Parameters adopted
17
Estimation of Soil Erodibility
18
Wheel Wash at Main entrance
19
Water treatment system provided at wheel wash
20
Perimeter cut off drain
Concrete lining
Silt fence
21
Silt Traps
22
After exvavation, all rainwater will be retain at
basement
Concrete lining at slope
Diaphragm wall completed
23
Existing turfing to be retained
24
Main Water holding area before treatment
25
Water Treatment System
26
Discharge of Slurry after water treatment
Slurry discharged to slurry collection area
27
Discharge of water to existing canal after
treatment
28
Discharge of water to existing canal after
treatment
29
The discharge into the storm water drainage
system shall not contain Total Suspended Solids
in concentrations greater than 50 milligrams per
litre of the discharge.
30
Continuous monitoring will be implemented on site
31
Regular Maintenance
32
(No Transcript)
33
Existing drain within construction site
maintained regularly
34
Maintenance Programme
  • Regular checks on the ECM that have been put in
    place
  • The checks including the
  • inspection of slope, drain, erosion blanket,
    silt fence, curb inlet sediment barrier, sediment
    tank.
  • Damage, choke or any problem which cause
    ineffectiveness should be recorded and reported.
  • The washing bays with sump pump at all
    entrances/exits must be also properly maintained.
  • Servicing repair required for the ECM should be
    looked into and immediate necessary
    repair/service or improvement should be carried
    out with urgency.

35
Increase in composition fines
  • Regulation 4
  • TSS gt50mg/l
  • 1,000 and
  • 2,500 in the case of a second offence

36
CHECKLISTFORMAINTENANCE OFEARTH CONTROL
MEASURES
37
(No Transcript)
38
(No Transcript)
39
(No Transcript)
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
(No Transcript)
44
  • THANK YOU . . . .