3About Nigeria
- Located in West Africa
- Total area of 923,770 sq km (about the same
territory as France Germany combined). - Climate varies from equatorial (in the south),
tropical (in the central area) and arid (up
north). - Population of over 130 million people
(multiethnic, multicultural, secular society)
with an average pop. growth rate of 3 p.a.
4Sector Reform (on-going)
- Perhaps the single most profound step taken under
the reform process has been the internal
unbundling decentralization of PHCNs
operations - NBUs have been operating as semi autonomous units
over the past 2yrs (while they await full
corporatization in April 2006). - With increased autonomy came the need for greater
accountability performance monitoring
benchmarking.
5PHCNs Benchmarking Performance Monitoring
Initiatives
6Target Setting
- Based on realistic expectations rather than
international benchmarks - Challenges in the local environment taken into
account (Weak/ fragile electricity
infrastructure Network limitations etc) - Customer Service Charter also taken into
consideration
7Target Settingcontd
- A consultative approach is adopted in target
setting (Targets are agreed with the NBUs not
handed down). - Adjustments are made where necessary based on the
peculiar situation of an NBU. - Targets are monitored by the Planning Strategy
Dept./ Market Operator - Ranking circulated at the end of each month
8Some KPIs for the Generation NBUs
- Generation Unit Cost - Total Expenditure
(Naira) - Total Energy
Delivered (KWH) - Generation Utilization Index - Actual
Generation (MW) -
Available Capacity (MW) - Capacity Utilization Index - Available
Capacity (MW) - Installed Capacity (MW)
- Fuel Cost per Unit Gen.- Total Cost of
Fuel (Naira) - Total Energy Generated (MWH)
9KPIs for the Generation NBUs contd
- Staff Cost Index - Total Expenditure
(Naira) -
Number of Employees - Staff Productivity Index - Total Energy
Delivered (MWH) - Number of Employees
- Breakdown Mtce. Index- No of Breakdown defects
rectified -
No of Breakdown defects reported - Plant Reliability Index - Time of Reporting
Period -
Total Down time of unavailable Units
10Some Performance Monitoring Charts
Target
Reliability Index Chart (Jan Dec 2005)
Maintenance Index Chart (Jan Dec 2005)
11Some KPIs for Transmission
- Grid Loss Ratio - Energy
dispatched to distribution -
Energy Received from Generation - Transformer Cap. Utilization - Transformer
Max. Load Installed
Capacity - Transmission Cost Index - Total Monthly
Expenditure -
Energy Received from Generation - Staff Productivity - Energy Received from
Generation -
Ave. no. of employees
12Some KPIs for Transmission..contd
- Dispatch Unit Cost - Total Operation
Expenditure (Naira) -
Energy Delivered to Distribution - Transmission Losses - Energy sent out from PS
(MW) Energy delivered -
Energy sent out from P.S (MW) -
13Some KPIs for the Distribution NBUs
- Fault Clearance Index - Total faults Cleared
-
Total faults reported - Collection Efficiency - Total Monthly Cash
Collection (Naira) -
Monthly Billing Revenue (Naira) - Capacity Utilization Index - Maximum Monthly
Load (MW) -
Installed Capacity (MW) - Metering Ratio - Total
no. of Customers metered -
Total number of customers - Customer Response Time - Time from customer
enquiries/ complaints -
To time of resolution
14Impact of Performance Monitoring / Benchmarking
- Has triggered various innovations by the NBUs
- Helped to build up managerial capacity
- More efficient resource allocation
- NBUs have a foretaste of full blown reform (as
the now compete against each other) - Now more willing to embrace new ideas eg
innovations under CREST
15More About the CREST Programme
- Commercial Reorientation for Electricity Sector
Tool Kit (CREST) - Designed to address some of the downstream issues
of the Industry (metering, billing, revenue
collection, customer care etc). - Commenced in 2003
16Distribution Efficiency Enhancement Initiatives
under CREST
- High Voltage Distribution System (HVDS)
- High Voltage Panel Metering
- Customer Care Centres
- Rapid Response Vehicle
- Spot Billing
- Scratch Card system
- Split pre prepayment meters.
- Performance rewarding initiative
17 High Voltage Distribution System in Other
Distribution Business Units (DBUs)
(ii) HVDS Substation Eko DBU
(iii) HVDS Substation Ikeja DBU
(i) HVDS Substation Ibadan DBU
(iv) HVDS Substation Kano DBU
(v) HVDS LV Distribution using insulated
cables LV Distribution Board Kano DBU
18 HVDS SUCCESS STORY ACROSS THE BUSINESS
UNITS
BENEFITS BEFORE-HVDS AFTER-HVDS
Improved Reliability 3 Days ON 1 Day OFF Unit load Shedding All customers ON 24/7
Reduction in LV Reticulation Route Length 1200m (16 spans) max/Upriser 200m(4 spans) max/Upriser
Improved Voltage Profile 200V maximum 140V minimum 223V maximum 213 minimum
Customers satisfaction Regular complaints from the areas where the HVDS was implemented Near Zero complaints from the areas after implementation
Technical Loss Reduction achieved in one of the Business unit 40.19KW 0.05KW (negligible)
19 High Voltage Metering
In-door HT Panel Meter
Out Door HT Panel Meter
20HT Panel Metering Success storymonthly revenue
improvement across the business units
21Split Pre-Payment Meters Mambolo Abuja
22Scratch Card Initiative
Telephone vending possible Internet vending
possible More care of customer is not required
20 Digit Codes
23Pre-Payment Meters Success Story at Mambolo Abuja
- No more unbalanced load due to disconnection and
re-connection of customer - No more bills and debt accumulation
- Commercial Losses reduced
- Improved relationship with customers (no bad
reading, no disconnection and re-connection fees) - Customer manages his consumption
- Up-front payment
24 TYPICAL CASH COLLECTION PERFORMANCE
REPORT
ABUJA ZONE JAN 2003 TO DECEMBER 2005
25Rapid Response Vehicle - Abuja
26Customer Care Center Garki - Abuja
27(No Transcript)
28Naira Yield 2005 N3.23/Kwh
Naira Yield 2001 N1.87/Kwh
29(No Transcript)
30Consolidating on the Gains
- Sector reform leading to privatisation will
ensure that the gains made are improved upon
(Privatization to commence in 20062GenCos and 2
DisCos) - PPP initiatives being introduced with the
corporatization of PHCN in April, 2006 - The outsourcing programme will run parallel to
the privatization programme and is designed to
add value to the DisCos and significantly improve
their financial positions
31Conclusion
- The Nigerian power sector is gradually recovering
from two decades of neglect (the pace may be slow
but a consistent upward trend has clearly
emerged) - Target Setting, Performance Monitoring
Benchmarking have been key tools in this
transformation process - Finally, we must commend the WB for the support/
assistance of the on-going power sector reform
programme through projects such as the NTDP
CREST and more recently the NEDP.
32- Thank you for your attention