Title: Performance Monitoring


1
Performance Monitoring Benchmarking in an
Electricity Sector in Transition
Being presentation made by Engr. (Dr.) J. O.
Makoju MD/CE PHCN Plc at the World Bank 2006
Energy Week in Washington DC 6th 10th March,
2006
2
(No Transcript)
3
About Nigeria
  • Located in West Africa
  • Total area of 923,770 sq km (about the same
    territory as France Germany combined).
  • Climate varies from equatorial (in the south),
    tropical (in the central area) and arid (up
    north).
  • Population of over 130 million people
    (multiethnic, multicultural, secular society)
    with an average pop. growth rate of 3 p.a.

4
Sector Reform (on-going)
  • Perhaps the single most profound step taken under
    the reform process has been the internal
    unbundling decentralization of PHCNs
    operations
  • NBUs have been operating as semi autonomous units
    over the past 2yrs (while they await full
    corporatization in April 2006).
  • With increased autonomy came the need for greater
    accountability performance monitoring
    benchmarking.

5
PHCNs Benchmarking Performance Monitoring
Initiatives
6
Target Setting
  • Based on realistic expectations rather than
    international benchmarks
  • Challenges in the local environment taken into
    account (Weak/ fragile electricity
    infrastructure Network limitations etc)
  • Customer Service Charter also taken into
    consideration

7
Target Settingcontd
  • A consultative approach is adopted in target
    setting (Targets are agreed with the NBUs not
    handed down).
  • Adjustments are made where necessary based on the
    peculiar situation of an NBU.
  • Targets are monitored by the Planning Strategy
    Dept./ Market Operator
  • Ranking circulated at the end of each month

8
Some KPIs for the Generation NBUs
  • Generation Unit Cost - Total Expenditure
    (Naira)
  • Total Energy
    Delivered (KWH)
  • Generation Utilization Index - Actual
    Generation (MW)

  • Available Capacity (MW)
  • Capacity Utilization Index - Available
    Capacity (MW)
  • Installed Capacity (MW)
  • Fuel Cost per Unit Gen.- Total Cost of
    Fuel (Naira)
  • Total Energy Generated (MWH)

9
KPIs for the Generation NBUs contd
  • Staff Cost Index - Total Expenditure
    (Naira)

  • Number of Employees
  • Staff Productivity Index - Total Energy
    Delivered (MWH)
  • Number of Employees
  • Breakdown Mtce. Index- No of Breakdown defects
    rectified

  • No of Breakdown defects reported
  • Plant Reliability Index - Time of Reporting
    Period

  • Total Down time of unavailable Units

10
Some Performance Monitoring Charts
Target
Reliability Index Chart (Jan Dec 2005)
Maintenance Index Chart (Jan Dec 2005)
11
Some KPIs for Transmission
  • Grid Loss Ratio - Energy
    dispatched to distribution

  • Energy Received from Generation
  • Transformer Cap. Utilization - Transformer
    Max. Load Installed
    Capacity
  • Transmission Cost Index - Total Monthly
    Expenditure

  • Energy Received from Generation
  • Staff Productivity - Energy Received from
    Generation

  • Ave. no. of employees

12
Some KPIs for Transmission..contd
  • Dispatch Unit Cost - Total Operation
    Expenditure (Naira)

  • Energy Delivered to Distribution
  • Transmission Losses - Energy sent out from PS
    (MW) Energy delivered

  • Energy sent out from P.S (MW)

13
Some KPIs for the Distribution NBUs
  • Fault Clearance Index - Total faults Cleared

  • Total faults reported
  • Collection Efficiency - Total Monthly Cash
    Collection (Naira)

  • Monthly Billing Revenue (Naira)
  • Capacity Utilization Index - Maximum Monthly
    Load (MW)

  • Installed Capacity (MW)
  • Metering Ratio - Total
    no. of Customers metered

  • Total number of customers
  • Customer Response Time - Time from customer
    enquiries/ complaints

  • To time of resolution

14
Impact of Performance Monitoring / Benchmarking
  • Has triggered various innovations by the NBUs
  • Helped to build up managerial capacity
  • More efficient resource allocation
  • NBUs have a foretaste of full blown reform (as
    the now compete against each other)
  • Now more willing to embrace new ideas eg
    innovations under CREST

15
More About the CREST Programme
  • Commercial Reorientation for Electricity Sector
    Tool Kit (CREST)
  • Designed to address some of the downstream issues
    of the Industry (metering, billing, revenue
    collection, customer care etc).
  • Commenced in 2003

16
Distribution Efficiency Enhancement Initiatives
under CREST
  • High Voltage Distribution System (HVDS)
  • High Voltage Panel Metering
  • Customer Care Centres
  • Rapid Response Vehicle
  • Spot Billing
  • Scratch Card system
  • Split pre prepayment meters.
  • Performance rewarding initiative

17
 
High Voltage Distribution System in Other
Distribution Business Units (DBUs)
(ii) HVDS Substation Eko DBU
(iii) HVDS Substation Ikeja DBU
(i) HVDS Substation Ibadan DBU
(iv) HVDS Substation Kano DBU
(v) HVDS LV Distribution using insulated
cables LV Distribution Board Kano DBU
18
HVDS SUCCESS STORY ACROSS THE BUSINESS
UNITS
BENEFITS BEFORE-HVDS AFTER-HVDS
Improved Reliability 3 Days ON 1 Day OFF Unit load Shedding All customers ON 24/7
Reduction in LV Reticulation Route Length 1200m (16 spans) max/Upriser 200m(4 spans) max/Upriser
Improved Voltage Profile 200V maximum 140V minimum 223V maximum 213 minimum
Customers satisfaction Regular complaints from the areas where the HVDS was implemented Near Zero complaints from the areas after implementation
Technical Loss Reduction achieved in one of the Business unit 40.19KW 0.05KW (negligible)
19
High Voltage Metering
In-door HT Panel Meter
Out Door HT Panel Meter
20
HT Panel Metering Success storymonthly revenue
improvement across the business units
21
Split Pre-Payment Meters Mambolo Abuja
22
Scratch Card Initiative
Telephone vending possible Internet vending
possible More care of customer is not required
20 Digit Codes
23
Pre-Payment Meters Success Story at Mambolo Abuja
  • No more unbalanced load due to disconnection and
    re-connection of customer
  • No more bills and debt accumulation
  • Commercial Losses reduced
  • Improved relationship with customers (no bad
    reading, no disconnection and re-connection fees)
  • Customer manages his consumption
  • Up-front payment

24
TYPICAL CASH COLLECTION PERFORMANCE
REPORT
ABUJA ZONE JAN 2003 TO DECEMBER 2005
25
Rapid Response Vehicle - Abuja
26
Customer Care Center Garki - Abuja
27
(No Transcript)
28
Naira Yield 2005 N3.23/Kwh
Naira Yield 2001 N1.87/Kwh
29
(No Transcript)
30
Consolidating on the Gains
  • Sector reform leading to privatisation will
    ensure that the gains made are improved upon
    (Privatization to commence in 20062GenCos and 2
    DisCos)
  • PPP initiatives being introduced with the
    corporatization of PHCN in April, 2006
  • The outsourcing programme will run parallel to
    the privatization programme and is designed to
    add value to the DisCos and significantly improve
    their financial positions

31
Conclusion
  • The Nigerian power sector is gradually recovering
    from two decades of neglect (the pace may be slow
    but a consistent upward trend has clearly
    emerged)
  • Target Setting, Performance Monitoring
    Benchmarking have been key tools in this
    transformation process
  • Finally, we must commend the WB for the support/
    assistance of the on-going power sector reform
    programme through projects such as the NTDP
    CREST and more recently the NEDP.

32
  • Thank you for your attention