Title: Material Requirements Planning
1Material Requirements Planning
Inputs
Output
Planned Orders
2Material Requirements Planning
MRP is a Push production system
- With MRP, production is planned to meet
- Future demand forecasts (make-to-stock)
- Orders to be completed in the future
(make-to-order or assemble-to-order) - A key input is, therefore, actual demand or a
demand forecast
3Material Requirements Planning
Demand Sources
- Planning
- Sales and Operations Planning (SOP)
- Forecasting, marketing plans, capacity
- Profitability Analysis
- Controlling (CO) Module (CO-PA)
- Direct Input (Demand Management)
4Demand Management
- Simplest way to create demand it to input it
directly
5Demand
6DemandS/R List
7Material Requirements Planning
MRP is designed for assembled products
- MRP uses the assembly structure, or Bill of
Material (BOM) to determine how many components
or subassemblies are needed to make the required
number of finished products - Considers available inventory of components and
subassemblies in calculationsnet requirements
8Material Requirements Planning
MRP is designed for assembled products
- For end-items, demand is independentfrom
customers - For other components, demand can be determined
using the BOM - Dependent demand
9Material Requirements Planning
NRGA (7 cases)
Dough NRGA (500 lb)
Oats (300 lb)
Wheat Germ (50 lb)
Carob Chips (50 lb)
Raisins (50 lb)
10Material Requirements Planning
Key MRP concept Time-phased BOM
NRGA (7 cases)
Dough NRGA (500 lb)
Oats (300 lb)
Wheat Germ (50 lb)
Carob Chips (50 lb)
Raisins (50 lb)
Time
11Bill of Material (BOM)
12Bill of Material (BOM)
13Bill of Material (BOM)
14Bill of Material (BOM)
15Bill of Material (BOM)
16Material Requirements Planning
Material Data determines production lot size and
timing
- Primary material data includes
- Current Inventory
- Lot sizing procedure
- Production lead times
- All of this data is available in SAP via the
Stock/Requirements List
17Material DataS/R List
Inventory Level 0
Inventory Detail
18InventoryDetail
19Material DataS/R List
Lot Size FX, 7
20Material DataS/R List
LeadTime 1
21Material Requirements Planning
22Material Requirements Planning
23Material Requirements Planning
24Material Requirements Planning
25Material Requirements Planning
26Material Requirements Planning
27Material Requirements Planning
28MRPNet Requirements
29Textbook MRP
Textbook MRP uses a bucketed system
30Textbook MRP
LS - lot size - size of production batch or lot
sizing method Gross Requirements - quantity
needed in each period - from MPS or from other
components and assemblies Scheduled Receipts -
Planned receipt dates for orders that have
already been placed Planned Order Receipts -
expected receipt date for planned orders (orders
that haven't been placed yet) Available Balance -
Projected inventory balance at the end of each
period Planned Order Releases - Orders that need
to be placed (as determined by MRP process) to
meet gross requirements (source of planned order
receipts)
31Textbook MRPExample Problem