Title: Welcome to The 51st Annual CSI Show
1Welcome to The 51st Annual CSI Show and
Convention
Specifications and Corporate Memory Robert Paul
Dean, AIA, CSI, CCS Building Systems Design,
Inc. Booth 221
Baltimore, MD June 20-22, 2007
2The Construction Specifications Institute is a
Registered Provider with The American Institute
of Architects Continuing Education Systems.
Credit earned on completion of this program will
be reported to CES Records for AIA members.
Certificates of Completion for non-AIA members
available on request. This program is registered
with the AIA/CES for continuing professional
education. As such, it does not include content
that may be deemed or construed to be an approval
or endorsement by the AIA of any material of
construction or any method or manner of handling,
using, distributing, or dealing in any material
or product. Questions related to specific
materials, methods, and services will be
addressed at the conclusion of this presentation.
3- This program is a registered educational program
with the Construction Specifications Institute of
Alexandria, VA. The content within this program
is not created or endorsed by CSI nor should the
content be construed as an approval of any
product, building method, or service. Information
on the specific content can be addressed at the
conclusion of this program, by the Registered
Provider. - Credit earned for completing this program will
automatically be submitted to the CSI CEN.
Completion certificates can be obtained by
contacting the Provider directly. - This logo and statement identify Provider
programs registered with the CSI CEN and are
limited to the educational program content.
4Learning Objectives
- Basic principles of preserving corporate memory
through creation maintenance of an office
master specification - Techniques for incorporating project experiences
in an office master - Techniques for updating your office master
without losing corporate memory - Resources available
5Office Master Specifications
- What is an office master?
- Essentially, it is any set of specification
sections that is intended for re-use on multiple
projects - In larger firms, an office master is typically
used by a number of people and is used to
establish/enforce office quality standards - An office master may be intended for use without
modification, but more typically is the starting
point for individual projects - An office master can serve as a repository for
corporate memory and therefore should change over
time with project experience
6Office Master Specifications
- Why is an office master a reasonable way to
preserve corporate memory? - Specs are text documents
- Master text can be modified to reflect lessons
learned - Notes can be added to record specifics of project
experience pro and con. - Separate documents, including drawings and
photos, can be easily appended and retrieved with
hyperlinks
7Office Master Specifications
- To be really useful, an office master must be
carefully maintained - Single point responsibility is critical
- There must be reasonable allowance for indirect
time - Feedback from project architects is important and
should be encouraged
8Office Master Specifications
- What are the major problems associated with an
office master? - balancing need for standardization with need for
keeping valid options - figuring out how to present lessons learned in a
way thats beneficial - maximizing usefulness while minimizing effort
spent in maintenance - keeping it updated
9Office Master Specifications
- Whats wrong with simply reusing the last project
spec? - It really depends
- word processing or relational database?
- similarity of projects
- time elapsed
- Editing by deletion is riskier than editing by
selection - Its important to actually read each section
regardless
10Office Master Specifications
- Some common problems with reuse of specs produced
by word processing - errors tend to accumulate
- updating can be spotty or nonexistent
- options and alternatives relevant to new
projects tend to be overlooked because they have
been deleted for earlier projects - specific references to older project data are
frequently not deleted
11Office Master Specifications
- So whats the right way to go about creating
maintaining a set of office master
specifications? - select the basic approach word processing or
relational database - assign overall responsibility to one person
- subscribe to a commercial guide spec system as a
starting point - merge whatever you have thats unique or
otherwise valuable with the commercial master
into one system
12Office Master Specifications
- Organization of an Office Master Depends on Type
of System - Word processing system
- typically one file for each spec section
- occasionally multiple files for specific sections
- rarely multiple sets for different bldg. types
- Relational database system
- typically one file for entire project
- occasionally one file for each project type
- occasionally single section masters
13Office Master Specifications
- Commercial Guide Specifications
- MASTERSPEC, owned by AIA and managed by ARCOM
- BSD SpecLink, owned and managed by Building
Systems Design, Inc. - SPECTEXT, owned and managed by the Construction
Sciences Research Foundation - Unified Facilities Guide Specification (UFGS) and
SpecsIntact, administered by USACE, NAVFAC, and
NASA
14Office Master Specifications
- Commercial Guide Specifications
- MASTERSPEC word processing system with
relational database add-ons - BSD SpecLink pure relational database system
by Building Systems Design, Inc. - SPECTEXT word processing system with macro
add-ons - Unified Facilities Guide Specification (UFGS) and
SpecsIntact word processing system with
customized macro add-ons
15Office Master Specifications
- Commercial Guide Specifications
- MASTERSPEC word processing system with
relational database add-ons - BSD SpecLink pure relational database system by
Building Systems Design, Inc. - SPECTEXT word processing system with macro
add-ons - Unified Facilities Guide Specification (UFGS) and
SpecsIntact word processing system with
customized macro add-ons
16e-SPECS Designer by Interspec
17Incorporating Project Experience in Office Master
Specifications
- All Systems
- Modifying commercial master to
- eliminate options that should never be used
- add valid alternatives
- indicate mutually exclusive options
- Adding notes to
- explain when alternatives should be used
- provide background and history
- incorporate specific project experience
- Adding intelligence to expedite choices
18Incorporating Project Experience in Office Master
Specifications
- Customizing a Commercial Master
- Word processing systems
- eliminate undesirable options by deleting text
- add valid alternatives by inserting
- Choices within a paragraph
- Alternative paragraphs
- indicate mutually exclusive options (use color or
insert notes) - Relational database system
- eliminate undesirable options by excluding text
or adding note - add valid alternatives by inserting choices or
adding paragraphs - automate related new text by adding intelligent
links - indicate mutually exclusive options by adding
intelligent links
19Incorporating Project Experience in Office Master
Specifications
- Customizing a Commercial Master
- Word processing systems
- add notes by using
- hidden text
- notes feature
- graphic device to differentiate notes from text
(asterisks, text box, change in font, etc.) - Relational database system
- add notes by using project notes feature
- hyperlinks to separate documents
20Incorporating Project Experience in Office Master
Specifications
- Customizing a Commercial Master
- Word processing systems
- add intelligence by
- inserting instructional notes
- using color coding to visually connect related
text - Relational database system
- add intelligence by
- linking text to turn on or highlight related text
or exclude incompatible options - using project notes to provide detailed
instructions
21Office Master Specifications
Tactics for Establishing an Office Master
- After obtaining a subscription to a commercial
master guide specification system - Make a conscientious effort to incorporate the
commercial updates into your office master on an
ongoing basis - Make changes to your office master learned from
actual project experience - Treat the office master as a valuable resource
for the entire firm
22Office Master Specifications
Tactics for Establishing an Office Master
- Use the specs developed for a specific project as
the starting point, and make modifications on an
ongoing, as-needed basis - Advantage Easiest way to get started
- Disadvantage Modifications evolve slowly
- Create a specific set of project specs (or
multiple sets) that are intended from the outset
to be the office master(s) - Advantage Most likely to produce consistent
specs - Disadvantage Requires initial overhead investment
23Establishing an Office Master in Word Processing
- Augment commercial master by
- creating a master template for format, appearance
of final sections - applying format to master sections
- modifying sections as needed to meet office
needs, standards - add unique sections to match format of modified
commercial master sections
24Establishing an Office Master in Word Processing
- Add valid alternatives
- insert options within a paragraph by using
brackets - provide mutually exclusive alternative paragraphs
- if new products are added, verify that Part 1 and
Part 3 text is still appropriate - if necessary, add corresponding text in other
parts of the section - Consider marking inappropriate alternatives,
rather than deleting them, using - notes
- text boxes
- color
25Establishing an Office Master in Word Processing
- Add notes that
- Explain alternatives
- Provide history of use
- Instruct on how to edit the document
- Distinguish the notes from master text by
- using hidden text
- separating notes from text by characters
- using color
26Set off notes by using distinctive characters
27Set off notes by using distinctive color
28Set options to display hidden text
29Establishing an Office Master in a Relational
Database System
- Basic Concepts
- Only one file per project
- Edit by selection, not deletion
- Links multiply productivity improve
coordination - Overlay structure avoids interference between
data in commercial master and data in separate
office master file - Updating never affects office master data
30Relational Database Concepts
31Establishing an Office Master in a Relational
Database System
- Add valid alternatives
- insert options within a paragraph by using choice
fields - provide mutually exclusive alternative paragraphs
with interactive links - if new products are added, verify that Part 1 and
Part 3 text is still appropriate - if necessary, add corresponding text in other
parts of the section and build links for
selection - Exclude inappropriate alternatives, rather than
deleting them, and then add - explanatory notes
- excluding links
32(No Transcript)
33(No Transcript)
34Establishing an Office Master in a Relational
Database System
- Add project notes that
- Explain alternatives
- Provide history of use
- Instruct on how to edit the document
- Distinguishing the notes from master text is
unnecessary
35(No Transcript)
36Office Master Specifications
Tactics for Maintaining an Office Master
- Making use of updates from commercial master
- Word processing systems
- compare each updated section with edited version
in office master specification - select and import changes needed for office
master - modify notes as necessary to reflect changes
- Relational database system
- install update
- open office master
- answer yes or no to update query
- yes updates without affecting custom edits
- no makes no changes, allows for subsequent
review
37Relational Database Updating
Yes The project is updated automatically (but
user edits and additions are not affected)
No Project is not updated, but sections and
paragraphs that would be changed are marked for
later consideration
38Other Options for Office Masters
- Adding an intelligent checklist
- Insert options in logical, decision-making order
- Tag checklist paragraphs for non-printing status
and selectability - Add links to achieve automatic editing
- Test for desired results
39(No Transcript)
40(No Transcript)
41(No Transcript)
42(No Transcript)
43Other Options for Office Masters
- Adding hyperlinks to related Word documents
- Importing whole sections from word processing
- Assure that source document is formatted cleanly
and consistently, then convert to .rtf - Add any codes desired for automated choice
creation, notes insertion then import - Add tags for administrative reports
- Add links as required for automated reference
standards, cross references, TOC, etc.
44Learning Objectives
- Basic principles of preserving corporate memory
through creation maintenance of an office
master specification - Techniques for incorporating project experiences
in an office master - Techniques for updating your office master
without losing corporate memory - Resources available
45For more information, please contact. . .
Building Systems Design, Inc. 888-BSD-SOFT (888-27
3-7638) www.bsdsoftlink.com
Or visit us in Booth 221 at the CSI Show
This concludes the educational portion of this
presentation