Title: MANGALWAR
1RAJASTHAN STATE ROAD DEVELOPMENT CONSTRUCTION
CORPORATION LTD. JAIPUR
MANGALWAR NIMBAHERA (MDR-11A)
Development of Project on
BOT (Annuity) Model
2PROJECT LOCATION
3PROJECT LOCATION
4NECESSITY
- Better access to Stones mines of the area to rest
of State. - Better roads for transportation of materials to
from Cement plants i.e. J.K.Cement-Nimbahera,
Birla Cement, Vikram Cement, etc. established in
the region providing better opportunity for their
expansion. - Comfortable present connectivity between
Mangalwar and Nimbahera via Nikumbh which is the
shortest route to connect Kandla Port to Central
India (M.P.) like Indore and Ratlam, Bhopal etc. - Road, if improved shall form life line of Badi
Sadri Nimbahera Assembly Constituency which is
spread from Mangalwar to Nimbahera. - Improved Business activities shall further the
cause of economic and social advancement of
the area. - Shall provide a link from NH 79 to NH 76.
5NECESSITY
- Mangalwar Nimbahera are the Busy towns and they
need faster effective connectivity by Road. - Commercial traffic is available due to Cement
Production other Industrial activities - Number of Sharp Horizontal Vertical Curves has
be redesigned as per Guidelines of IRC. - Widening Strengthening of Carriageway from 1.5
Lane to 2 Lane with Hard Shoulder is required. - This road is existing Toll Road and the
concession period is ending by March 2012. The
Concessionaire is RSRDCC.
6Project Proposal
- 2 Lane Carriageway with Hard Shoulder is
Proposed. - Chikdra Minana Bye Pass is proposed of approx.
4.25 km. - Widening of Culverts to 12.0m ROW.
- All Horizontal Vertical Curves shall be
designed as per designated speed with all the
requirements of Highway Design and make them
correct. - Paved Shoulder after 14 years.
7Bye Pass at chikadra required
8Bye Pass at MInana required
9MANGALWAR JUNCTION
10Nimbahera Town
11EXISTING SCENARIO(DETAILS OF CARRIAGEWAY)
Road Section Length (Km) Existing carriageway (m) Remarks
MANGALWAR - NIMBAHERA (MDR-11A) (Km 0 - Km 40) 40.00 5.5 M Carriageway with Hard Shoulder (No renewal proposed in Existing BOT)
TOTAL 40.00 Km
12EXISTING SCENARIO(DETAILS OF HABITATIONS)
ROAD SECTION VILLAGES / TOWNS
Mangalwar Nimbahera (MDR-11A) (Km 0 - Km 40) Mangalwar (Km 1/000) Chikarda (Km 12/000) Napawali (Km 17/000) Nikumbh (Km 20/000) Minana (Km 22/000) Dooriya (Km 29/000) Dinwa (Km 34/000) Nimbahera (Km 40/000)
No Level Crossing is on the route.
13PROPOSAL FOR ROAD IMPROVEMENT
ROAD SECTION TRAFFIC PROPOSAL
Mangalwar Nimbahera (MDR 11A) (Km 0/000 - Km 40/000) 4064 PCU 766 CVD Trengthening Widening of C/W with Hard Shoulder. Bye Pass of Chikadra Minana Proposed.
14PROPOSED ROAD CROSS SECTIONS
15PROPOSED ROAD CROSS SECTIONS
16STRIP PLAN
17estimates
18ABSTRACT OF COST OF DEVELOPMENT (WITHOUT PAVED
SHOULDER)
S. No. Particulars Estimated Cost (Rs. In Crores)
1. Improvement of Existing Road 21.49
2. CD Works (including new Culverts ) 1.54
3. ROB 0.00
4. CC Road 0.68
5. Bye Passes 6.97
6. Road Furniture 1.19
7. Road Work for Toll Plaza 4.36
8. Toll Plaza 0.57
9. Lay byes 0.00
10. Public Utility Services 0.46
11. Landscaping Tree Plantation 0.50
Total Cost 33.68
19ABSTRACT OF COST OF DEVELOPMENT
S. No. Particulars Estimated Cost (Rs. In Crores)
Base Cost 122.89
13. Add 10 Escalation for 2 year 0.00
14. Tender Premium _at_ 10 3.36
15. Cost of contingencies 5 1.68
16. Quality Control (1) 0.34
17. Guarantee Commission to State Govt. (1) 0.34
18. Cost of Land Acquisition 0.94
Sub Total 40.34
19. A F Charges (10) 4.03
20. Application Fee and Front end fee (0.5) 0.20
Sub Total 44.57
21. Interest during construction 1.78
Grand Total 46.35
20ABSTRACT OF COST OF MAJOR MAINTENANCE
S. No. Particulars Treatment Estimated Cost (Rs. In Crores) in respective year
Major Maintenance without Paved Shoulders Major Maintenance without Paved Shoulders Major Maintenance without Paved Shoulders
1. Renewal Cost 7h Year 40mm BC 10.48
2. Strengthening Cost 14th Year 50 DBM 40mm BC 43.08 87.53 (Paved Shoulder at 14th Year)
21FINANCIAL ANALYSIS
22Traffic Scenario(7 Days CVC 21/05/10 to 28/05/10)
Census Point PCU Tractor Trolly Car /JeepCat. 1(b) BusesCat. 2 Trucks lt5 TCat. 3(a) Trucks gt5 TCat. 3(b) Multi AxleCat. 4
Mangalwar Nimbahera 4649 98 884 95 336 103 232
23 age of Tollable Traffic
Tractor Trolley (Commercial Use)Cat. 1(a) Car /JeepCat. 1(b) BusesCat. 2 Trucks lt5 TCat. 3(a) Trucks gt5 TCat. 3(b) Multi AxleCat. 4
0 50 50 70 70 70
Assumed traffic growth per year 5
24 Tollable Routes
Road Section Length (Km)
Mangalwar - Nimbahera 38.50
25 Tollable Traffic
Road Section Tractor Trolly (Commercial Use)Cat. 1(a) Car /JeepCat. 1(b) BusesCat. 2 Trucks lt5 TCat. 3(a) Trucks gt5 TCat. 3(b) Multi AxleCat. 4
Mangalwar - Nimbahera (73.90 km) 0 467 59 208 64 143
26TOLL PLAZA LOCATIONS
LOCATION TOLLABLE LENGTH (KM) RAOD SECTION
Km. 1/600 38.50 Nimbahera
At Km 29/400 38.50 Dooria
27Summary of proposal
- Construction Period 1 Years 0 Months
- Repayment Period 19 Years 0 Months
- Concession Period 20 Year 0 Months
- Annuity Model with Toll
- Annuity 4.50 Crores
28SUMMARY OF PROJECT
S. No. Particulars Detail
1 Length of road 40.0 Km
2 Design Life 20 Years
3 Project Cost Rs. 46.35 Crores
4 Construction Period 1 Years 0 months
5 Tollable Period 19 Years 0 months
6 Concession Period 20 Years 0 months
7 Rate of Interest 11.75
8 Toll Plaza 2 Nos.
29Models of PPP
Annuity with toll
S. No. Description Initial Cost (Cr.) Annuity (Cr) Viability
1. Without Paved Shoulder initial and Paved Shoulder at 14th Year 46.35 4.50 3.50 Viable
30RECOMMENDATION
- Annuity Model with Toll Collection shall be
adopted. - Toll Shall not be charged by Car Public
Transport. Only Commercial Vehicles like LCVs ,
Trucks shall be charged. - Initially 2 Lane road without paved shoulder.
- 2 Lane with Paved Shoulder shall be after 14
Years. - Construction Period 1 Years 0 Months
- Repayment Period 19 Years 0 Months
- Concession Period 20 Year 0 Months
31THANKS
43
32(No Transcript)
33(No Transcript)
34Models of PPP
BOT
S. No. Description Initial Cost (Cr.) Major Maintenance Viability
1. Without Paved Shoulder initial and Paved Shoulder at 12th Year 46.35 32.07 7th 184.52 14th Non Viable
2. With Paved Shoulder initially 211.87 45.31 7th 129.51 14th Non Viable
30 VGF (20 Central 10 - OM - State Govt.)
S. N. Description Initial Cost (Cr.) IRR in 20 Years DSCR Viability
1. Without Paved Shoulder initial and Paved Shoulder at 14th Year 174.80 lt 2.0 0.21 Non Viable
2. With Paved Shoulder initially 211.87 lt 1.0 0.09 Non Viable
35 Tollable Traffic - Comparison
Road Section Tractor Trolly (Commercial Use)Cat. 1(a) Car /JeepCat. 1(b) BusesCat. 2 Trucks lt5 TCat. 3(a) Trucks gt5 TCat. 3(b) Multi AxleCat. 4
Phalodi Osian (73.90 km) 0 348 48 139 96 21
Osian - Jodhpur (46.0 Km) 0 585 116 238 87 25
36DETAILS OF PROPOSED WORK DEFECT LIABILITY PERIOD
S. No. Stretch Year Description
1 Km 57/0 to Km 91/0 2014 (Widening)
2 Km 69/0 to Km 70/0 2014 (Widening)
3 Km 81/0 to Km 89/0 CRF Tender Due
4 Km 63/0 to Km 74/0 CRF Tender Due
5 Km 118/0 to Km 122/0 Proposal for Jodhpur Bye Pass