Title: Datacentre Optimisation Solutions from Platespin
1Datacentre Optimisation Solutions from Platespin
- Mark Round VCP
- Systems Engineer, EMEA
- PlateSpin Ltd.
- Euretco Expo Center - Houten
- FINAL
2About PlateSpin
- Global independent software vendor (ISV)
- Founded in 2000
- Headquartered in Toronto, Canada
- Offices in UK, Germany, Australia, and USA
- Global Distribution Re-Seller Channel
- Over 2000 Satisfied Customers
- Experts in solutions for virtualised datacentres
- Recent Awards and Recognition
- Winners -International Business Awards for 2005
2006 - Best Company Overall (2006)
- Ranked as the 4th fastest growing Canadian IT
Company
3Two Thousand Customers
- Health Care
- Banking
- Insurance
- Pharmaceuticals
- IT
- Utilities
- Education
- Telecom
- Financial Services
- Government
4Business / Technology Alliances Certifications
5Channel Model / Technical Certification
- Build success through partners and strategic
relationships - Industry recognised accreditation (CPSA)
- Fast track programme for training partner network
6Goals Agenda
7Presentation Goals
- To show you how Platespin products can help you
with- - Sizing new Virtual Infrastructure environments
- Accelerating Server consolidation projects
- Optimise the datacentre through intelligent
software solutions from Platespin
8Agenda
- Platespin PowerRecon 2.x
- Consolidation Planning Module
- Features
- Platespin PowerConvert 6.x
- Features
- Solution Areas
- Continuous Datacentre Optimisation
- QA
9The PlateSpin Equation
Awareness of Resources
Awareness of Workloads
OS Portability
Optimized Datacenter
10How PowerRecon Helps
- Platespin PowerRecon helps you to see
- What resources are in the datacenter?
- What workloads are running on those resources?
- How effectively workloads are assigned to
resources?
Workload
Resources
11Life without Platespin PowerRecon
MISSING IN ACTION Datacentre Manager LAST SEEN
Behind communications rack number 7
12What is a resource?
- Resources are typically Hardware Assets with
finite reserves that can be supplied to meet
demand - - In other words - the underlying physical makeup
of the server hardware
13What is a workload?
- Workloads are defined as the operating system,
applications, and data stack running on a server
these are seen as demands on the underlying
resources - with 5 quantified dimensions of Processor,
Memory, Disk I/O, Disk Space, Network I/O
14Introducing Platespin PowerReconwith
Consolidation Planning Module
Inventory
Utilisation Workload profiling
15PowerRecon Features and Benefits
- Key Features
- No physical contact with servers required
- Completely AGENTLESS
- Windows and Linux measurement
- Virtual hierarchy aware (VMWare / MSVS)
- Customizable resource and workload reports
- Quick Start - Ready to run reports
- Secure and contained data collection and analysis
- One click monitoring analysis
- Benefits
- Not a one-time use product
- Use for consolidation or ongoing optimization
16Platespin PowerRecon 2.2Enhancements
- Data collection capabilities expanded -
- VMware Infrastructure 3
- Novell SUSE Linux Enterprise Server 9
- Scalability enhancements
- increased number of servers monitored per
instance of PowerRecon to accommodate larger
datacentres - Application and services workload reports with
advanced filtering capabilities - Detailed processor inventory gathering including
cores and hyper-threading awareness for Microsoft
Windows - Discover and inventory by IP range or CSV file
input - Enhanced Workload Scaling in Consolidation
Planning Module
17Question?
- Would you like to collect hardware and software
inventory for 500 servers without leaving your
chair? - Platespin offer Datacentre Server Inventory and
Discovery for FREE to help you Jump-Start your
server consolidation projects.
18Life with Platespin PowerRecon
19Platespin PowerRecon3 versions
- (Free Edition)
- PowerRecon for Inventory
- HW SW Inventory only (500 servers)
- Innovative Usage Based Pricing (Pay as you go)
- PowerRecon for Monitoring
- 1 per server per day (100 days minimum)
- Purchase from re-seller or Platespin PowerStore
- PowerRecon for Planning
- 2 per server per day (100 days minimum)
- Purchase from re-seller or Platespin Powerstore
- Time Limited Offer until November 30th 2006
20Acclaim for Usage Based Pricing
Usage based pricing is an innovative pricing
structure which will be embraced by datacentres.
By providing pricing structures that do not
depend on CPU power or static allocation of
physical boxes, solutions such as Platespin's are
paving the way to cost structures that are more
equitable and affordable. Bob Gill, Chief
Research Officer of TheInfoPro TheInfoPro (TIP)
is an independent research network and leading
supplier of market intelligence for the
Information Technology (IT) industry
21Introducing PowerConvert
- What is OS Portability?
- Technology that automates the streaming of
operating system, applications, data between
infrastructures
Decouple workload from host Infrastructure
Physical
- NEW
- FEATURE
- LIVE
- TRANSFER
Blade
Peer-to-Peer Workload Movement
Virtual
Deploy or Recover Workload from Archives and
Backups
Image
Reconfigure Workloads Dynamically
OS applications are decoupled from Hardware
22Starting a Server Consolidation Project
234 step approach
- Inventory Servers
- servers are added and static data is collected.
- Collect Data
- servers are monitored and dynamic data is
collected. - Select Candidates
- servers are selected for consolidation.
- Plan Consolidation
- the most optimal consolidation scenario is
identified. - USING - Platespin PowerRecon Consolidation
Planning Module
24Platespin PowerRecon
- Windows Server with IIS dot NET framework 2.0
- Platespin PowerRecon Server
- Platespin PowerRecon Client
- Database (MSDE) or SQL 2000
- Can be physical or Virtual MachineMonitored
Hosts - Windows NT4 (needs WMI core), 2000, 2003, XP
- Redhat Linux
- MSVS R2, VMWare GSX, VMWare Server, VMWare ESX
2.x, VI3 / ESX 3.x - No need for host agents
- WMI for Windows, RPC, DCOM
- /proc/ for Linux, SSH connection
- Admin / Root or equivalent level credentials
25Requirements Platespin PowerRecon 2.2
- Trial Installation 0 to 10 Servers
- 1 GB memory, Pentium 3, 2.0 GHz, MSDE
installation acceptable 2 GB limit - 4 GB free disk space
- Small Installation 10 to 100 Servers
- 2 GB memory, Pentium 4, 2.8 GHz with
hyper-threading - SQL Server, 20 GB free disk space
- Medium Installation 100 to 250 Servers
- 4 GB memory, Pentium 4, 2.8 GHz with
hyper-threading - SQL Server, 50 GB free disk space
- Large Installation 250 to 750 Servers
- 4 GB memory, Pentium 4, 2.8 GHz dual core or
multi-processor - SQL Server, 100 GB SCSI free disk space
- Guidelines 250 MONITORED SERVERS PER CPU CORE
26Requirements
- Guideline of 250 monitored machines per CPU core
in the Platespin PowerRecon server - Raw Database growth (estimated)
- 2 MB/server/1 day
- 60 MB/server/1 month
- 6 GB/100 servers/1 month
- 36 GB/100 servers/6 months
- 15 GB/250 servers/1 month
- Platespin PowerRecon uses summarisation
techniques to keep these databases manageable.
27Step 1 Inventory
- Install Platespin PowerRecon server into
environment - Define CREDENTIALS
- Remotely discover servers WITHOUT AGENTS
- Organise servers by discovered properties (e.g.
by O/S) or into custom groups - Run your 1st Report
28Step 1 Inventory(All available for FREE)
- HW Inventory Reports
- Dynamic interactive reports rank by
- operating systems
- installed applications
- patch levels
- CPU
- Memory
- Network
- disk resources etc.
- Acrobat Reader style report viewer
- Export in wide choice of formats (PDF, Excel etc.)
29Step 2 Collect
- Choose RESOURCES for which you would like to
collect utilization data - One click MONITORING
- Record utilization data over days, weeks, or
months based on business need
30Step 2 Collect
- Higher accuracy of raw counters (Burst Sampling
Technique) - View summary data, or drill down to granular
levels (counters) - Rank servers by CPU, network, disk etc. group
them for further analysis - Rich visualization tools
- MIN, MAX, AVG, STDEV
- Generate custom charts export them as BMP, WMF
or raw values
31Step 3 Select Plan
- Ready to run Analysis reports or build your own
in minutes e.g. Hardware Utilisation Peak - Find workloads that do not match their resources
- Identify sub-optimal servers quickly and easily
- Create Consolidation Candidate lists for use in
the Consolidation Planning Module
32OptimizationPre-requisites
Target Server Templates
Scale-up Scale-out
33Server Consolidation Assessment
- Create Target Server Templates
- Define templates for scale-up / scale-out
- Define if used in Consolidation to Virtual
Infrastructure or NONE
34Server Consolidation Assessment
- Create new Consolidation Project
- Select Candidates from Logical Group / or Filters
- Select Time range Dimensions
35Create Project Calculate Workloads
5D Workloads Time Profile
36Server Consolidation AssessmentProjects Explorer
- Create new Scenario (Determine minimum number of
servers)
37Optimization
- Create a scenario
- Find the minimum number of target servers
I. Pack workloads
38Optimization
- Create a scenario
- Find the minimum number of target servers
II. Balance workloads across resources
3
1
2
4
39Review Scenario Report Charts
40View Workload Summary
41Optimization of freed-up resources
- Create a scenario
- Specify the number of target servers
I. Pack workloads
Leftover Workloads
3
1
2
4
42Compare ALL ScenariosConsolidation Project report
43Consolidation Planning ModuleFeatures Benefits
- Benefits
- Intelligent distribution of workloads across
available servers to maximize server utilization - Balance application workloads by time and
hardware resource to minimize resource contention - Advanced workload sizing and optimization produce
accurate consolidation plans that minimize cost
by reducing the need for just in case servers - Features
- Onsite data analysis, visualization and reporting
- Automated generation of consolidation plans and
reports - What-if, scale-out and scale-up scenarios
- Implement scenarios using Platespin PowerConvert
6.0
44IntegrationPlatespin PowerRecon 2.2 / Platespin
PowerConvert 6.0
- Platespin PowerRecon Platespin PowerConvert
integration - Implement scenarios from consolidation project
45Implementing Scenarios
- When the job is initiated, PowerRecon
- Authenticates the servers
- Creates and runs server discoveries for
PowerConvert - Creates and saves conversion jobs
- In Platespin PowerConvert
- Load pre-built JOB
- Amend any final configuration details
- START the job
- Optionally monitor while the conversion completes
- P2V complete !
46PlateSpin PowerConvert
47The PlateSpin Equation
Awareness of Resources
Awareness of Workloads
Awareness of Workloads
OS Portability
Optimized Datacenter
48PlateSpin PowerConvert OS Portability
- Key Features
- No AGENTS or physical contact required with
servers - Stream servers between physical, virtual and
image - Connect, drag-and-drop, walk away
- Configure target resources on-the-fly
- 1 at a time / or / parallel conversions
- Windows and Linux
- Built on .NET API
- Benefits
- 501 time savings
- Single point of control
- Use to solve multiple problems in the data center
49PlateSpin PowerConvert Infrastructure Support
Sources Targets
Physical Server Physical Server
Blade Server Blade Server
VMware ESX Server VMware ESX Server
VMware Server VMware Server
Microsoft Virtual Server Microsoft Virtual Server
PlateSpin Flexible Image PlateSpin Flexible Image
Symantec Ghost
Symantec LiveState
Acronis TrueImage
NSI Doubletake
Veritas BackupExec
Raw Volumes
Operating Systems that can be Moved
Windows NT4, 2000, 2003, XP Professional
Redhat Linux / SLES 9
50Platespin PowerConvert 6.x
RESOURCE POOLS
51Platespin PowerConvert
- Windows Server with IIS dot NET framework 2.0
- Platespin PowerConvert Server
- Platespin PowerConvert Client
- Database (MSDE) or SQL 2000
- Can be physical or Virtual MachineInventory
Requirements - Windows NT4, 2000, 2003, XP
- Redhat Linux, SuSe 9
- MSVS R2, VMWare GSX / VMWare Server, VMWare ESX
2.x, VI3 - No need for host agents
- WMI for Windows, RPC, DCOM
- /proc/ for Linux, SSH connection
52Platespin PowerConvert 6.0Major Features
- X2P Driver Management GUI
- Add drivers for target physical systems x2P from
a new interface in the Platespin PowerConvert
client - Set Internal / External NICs of Target VM
- For Warm Standby VM
- Scalability Enhancements
- Run up to TWENTY simultaneous jobs
- PS Analyser / Conversion readiness tool
- Comes as standard in Platespin PowerConvert
- De-risks conversion
- Checks Hardware readiness
- OS / SP levels
- PS Analyser analysis runs for every dragndrop
- And much more
53OS Portability Solution Areas
54Server Consolidation(P2V)
CONSOLIDATE TO VIRTUAL OR BLADE INFRASTRUCTURES
AGENTLESSLY AND REMOTELY PERFORM CONSOLIDATION
55De-Virtualization for Support Integrity(V2P)
DE-VIRTUALIZE
VIRTUAL PRODUCTION MACHINES
PHYSICAL SERVERS
QUICKLY AND EASILY DE-VIRTUALIZE APPLICATIONS TO
MAINTAIN SUPPORT CONTRACT INTEGRITY FOR
COMMERCIAL AND HOMEGROWN APPS
56Hardware Migration(P2P)
OLD SERVER HARDWARE
NEW SERVER HARDWARE
RACK OR BLADE SERVERS
SIMPLE DRAG-AND-DROP VS. RE-INSTALLING OS,
APPLICATIONS, DATA
57Geographical Server Migration
MIGRATE ENTIRE DATA CENTERS WITHOUT HAVING TO BE
THERE
58Hardware Independent Images Provisioning and
DR(x2I2x)
BARE METAL RESTORE
STORE IMAGES ON ANY SERVER
RESTORE TO PHYSICAL SERVER WITH EXISTING OS
RESTORE TO VIRTUAL MACHINE
AGENTLESSLY AND REMOTELY CAPTURE AND RESTORE
59Disaster Recovery with Physical OR Virtual
Machines(P2V or P2P)
PHYSICAL RECOVERY MACHINE
DIRECT PEER-TO-PEER REPLICATION
VIRTUAL RECOVERY MACHINE
PHYSICAL PRODUCTION SERVER
NO IMAGE CAPTURE REQUIRED
USER OR SERVER RECONNECTS TO VIRTUAL RECOVERY
MACHINE AND RESUMES WORK
AGENTLESSLY AND REMOTELY CONTROL REPLICATION
BETWEEN PHYSICAL AND VIRTUAL BOXES
60Platespin NSI Double-Take Software
61PowerSDK API
- Fully functional API
- Aimed at advanced In-House developers who need
to leverage OS portability - Aimed at commercial
- ISV
- ASP
- Datacentres
- Licensed per-named developer
62PowerConvert 6.xwith Live Transfer
63Live TransferFunctionality Overview
- Migrate Windows servers without taking them
offline or the need to reboot - Source / Target servers can be physical or
virtual - Microsoft Exchange and SQL Server applications
aware - PowerConvert will briefly quiet applications
during transfer to preserve database integrity - Transfer during low-to-moderate activity periods
- Live Transfer is an optional feature
64Live TransferCompatibility List
- Operating Systems
- Windows 2000 Server SP4
- Windows 2003 Server SP0 / SP1 / R2
- Windows XP (all service packs)
- Applications
- Microsoft Exchange 2000, 2003
- Microsoft SQL Server 2000, MSDE
- Virtual Host
- VMware ESX 2.x, ESX 3.x, VI3
- VMware GSX, VMware Server 1.0
- Microsoft Virtual Server, Microsoft Virtual
Server R2
65Live Transfer (Highlights)
- Eliminates need for 3rd party live capture tools
- Direct streaming from source to Physical, Virtual
or Image - Images are hardware independent deploy to P or
V - Live Transfer captures the server at a
point-in-time - Technology is Application aware (Exchange / SQL)
- Source and Target machines have ON / OFF states
for greater flexibility control - VM can be suspended for faster RTO (Recovery Time
Objective)
66Upgrading to VI3?Use Platespin PowerConvert for
V2V
67The challenges of upgrading
- VMwares recommended upgrade process is not
reversible - VMs have to be powered-off
- Manual method does not allow for failback
- Manual method requires greater periods of
downtime - Manual method is error-prone
68Its as easy as 1,2..3
- Discover ESX 2.x Server Source VM
- Discover ESX 3.x Server
- Drag and Drop Source VM to VI3, Configure Job
press START
ESX 3.x
User works remotely from single migration console
69Migrating your ESX 2.x VMs to VI3
- Platespin PowerConvert
- Single GUI for conversions
- Can be done remotely
- Can be scheduled in advance
- No Agents / No Scripts
- Run one at a time or in Parallel
- Old ESX 2.x VM
- Remains unchanged
- Minimise downtime using LIVE TRANSFER
- Streamed over LAN / WAN
- No need for shared storage
- Stream to New ESX 3.x VM
- Is a new VM - native to VI3
- Created where you need it
- Adjust resources on-the-fly
- vSMP to 4 way
- Resource Pool
- Re-Size Disks / Partitions / Free space
- Choose Datastore location for the vDisks
- New VMware Tools installed automatically
- New VM can be tested before de-commissioning the
old ESX 2.x VM - Only downtime is when we inject new Virtual
Hardware (1 to 5 minutes)
70VMware Infrastructure 3 Upgrade The
PowerConvert Difference
- Leverages proven OS Portability technology to
create a native VI3 VM and streams the contents
of the ESX 2 VM into the new target - Manage your VI3 migration projects with maximum
flexibility and robustness - Provides greater flexibility and significantly
reduces migration risk of failure - V2V is not a new concept for Platespin
- Microsoft VS to VMware migrations
- GSX to ESX etc. since last 2005
71PowerConvert WorkflowExample P2V
72PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Three step conversion process - Remotely discover
and inventory server - Configure conversion job -
Start the conversion and optionally monitor
73Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Remotely Discover Server Details PowerConvert
discovers and inventories source and target
server using supplied hostname/IP and valid
credentials Discovered details used to - Review
business use of server to plan consolidation -
Auto configure conversion job
74PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Three step conversion process - Remotely discover
and inventory server - Configure conversion job -
Start the conversion and optionally monitor
75Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
- Configure and Start a Conversion Job
- With the server details discovered a conversion
job can be auto configured with a drag and drop - - Right sizing can be done via the job
configuration
76PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Three step conversion process - Remotely discover
and inventory server - Configure conversion job -
Start the conversion and optionally monitor
77PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Create New Virtual Machine - PowerConvert
remotely installs a controller on the target ESX
Server - PowerConvert creates a new virtual
machine
78PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Take Control - PowerConvert takes control of new
virtual machine and source server - Purpose is to
boot source and destination so data can be
transferred with integrity - Source machine is
not altered
79PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Data Transfer - Virtual machine disks are
partitioned and formatted - Source data is
streamed directly into the virtual machine
without use of temp space - Copied operating
system is configured to run in virtual environment
80PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Release Control and Configure - New VM is booted
(control is released) - PowerConvert configures
the VM as per the job configuration (e.g.
network, hostname, domain, etc)
81PlateSpin PowerConvertHow it Works
Source Servers
PowerConvert Server
Target Virtual Host
PowerConvert Client
Release Source Server - PowerConvert releases
control of source server if specified in the job
(e.g. avoid duplicate IP) - Conversion is
complete and the new virtual machine is now ready
for operation - PowerConvert saves server
details, can be refreshed later as needed
Conversion Complete
82Integrated suite approach to consolidation
83In Summary
- Inventory
- Build an accurate picture of server resources for
effective planning - Collect
- Gather real workload data to make accurate
consolidation decisions - Plan
- Run different what-if scenarios to maximise
utilisation and minimise cost (with Consolidation
Planning Module) Build Platespin PowerConvert
jobs directly from Consolidation Plan - Implement
- Efficiently manage any size of consolidation
project with remote, automated, and fully
configurable conversions
84Q A
85Summary
- Platespin offer the only end-to-end software
solution suite for consolidation - CPSA Industry recognised certification
programme - The only 100 automated hardware independent
migration software - Physical, virtual, images
- Used for multi-purposes
- Server Consolidation
- Disaster Recovery
- Test Lab Automation
- Lease Migration / Data Center Relocation
- Server Provisioning
- Designed for long-term use to achieve optimized
data center
86Thank You
87Pricing and Licensing
88Platespin PowerConvertVersions
- Platespin PowerConvert for Server Consolidation
- Per Conversion License model
- Restricted for P2V or P2P operations only
- Platespin PowerConvert for Recovery
- Licensed per PROTECTED Server OS Instance
- x2I2x (3 step conversion process)
- Uses Platespin Image Server technology
- Platespin PowerConvert Universal
- Anywhere-to-Anywhere
- Peer-to-Peer conversions
- Licensed Per Server
89Pricing Licensing
- PowerRecon
- Starts at 1 per server per day
- Perpetual licenses available
- Download free edition at http//www.platespin.com
- PowerConvert
- Starts at 100 per conversion
- Perpetual licenses available
- Request evaluation / demo with your Platespin
partner today - Web seminars every Tuesday reserve your space _at_
http//www.platespin.com/events
90See. Think. Respond.